Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This project aims to stimulate intersectoral and international collaboration within Europe and with an ICPC country, Kazakhstan, in the area of novel nanoporous and nanostructured adsorbents for the treatment of very serious health conditions associated with acute and chronic exposure to external radiation and uptake of heavy metals and radiation as a consequence of accidental, occupational or del ...
Read Project

 11

 FINISHED 
MycoKey aims to generate innovative and integrated solutions that will support stakeholders in effective and sustainable mycotoxin management along food and feed chains. The project will contribute to reduce mycotoxin contamination mainly in Europe and China, where frequent and severe mycotoxin contaminations occur in crops, and where international trade of commodities and contaminated batches are ...
Read Project

 32

 FINISHED 
A diverse variety of medical or lifestyle conditions lead to a progressive loss of muscle force by functionally impairing myofibril contractility and causing ultimately myofibril loss. Major underlying risk factors of chronic muscle force loss are ageing, inactive lifestyles, and unbalanced nutrition. Together, these factors are predicted to lead to an endemic incidence of muscle weakness both in ...
Read Project

 14

 FINISHED 

Peptidomimetics with photocontrolled biological activity (PELICO)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The expertise, resources and specific knowledge of all participating parties will be combined to achieve a breakthrough in design, synthesis and application of peptide analogues (peptidomimetics) possessing photo-controlled biological activities, with special emphasis on anti-microbial and anti-cancer activities. The main idea behind the Project consists in chemical incorporation of artificial pho ...
Read Project

 4

 FINISHED 
...sustainable business. The project ambitions to boost deployment of Energy Storage Systems (ESS) in Green Vehicles and usage of Renewable Energy Sources for Electricity (RES-E powered Grids) currently limited by cost barriers, with deep implications for H2020 challenges and European competitiveness and employment.CareSTOR consortia brings together the capacities and niche SUPERCAPACITOR market acce ...
Read Project

 4

 FINISHED 
The overall aim of LoCoMaTech is, in the first place, to enable the novel HFQ® process, (patented by ICL) in its latest most advanced form, which includes 10 recently patented refining technologies (TRL4), to be used for the manufacture of lightweight, high strength body and chassis structures and components for low-cost vehicles, by establishing a prototype, full scale pilot production line (TRL6 ...
Read Project

 20

 FINISHED 
Since 2009, POLYTEDA’s ICT product addresses the Physical Verification (PV) stage of semiconductor design before the actual manufacturing of a microchip at the fab (Fabrication Plant). The layout view of a microchip has to be verified by identifying and fixing any design errors. This requires sophisticated software known as Design Rules Checking (DRC) tool. An overlooked error may cause multi-mill ...
Read Project

 1

 FINISHED 
The aim of the SEEMLA project is the reliable and sustainable exploitation of biomass from marginal lands (MagL), which are used neither for food nor feed production and are not posing an environmental threat.The main target groups are regional authorities and public or private owners of MagLs, who can provide knowledge on land availability and are responsible for managing these. Furthermore fores ...
Read Project

 8

 FINISHED 
In line with the objectives of the Europe 2020 Strategy and ET2020, through "WIN-WINe", the consortium, led by the Agricultural VET Institute "Fortunato" of Pisticci (MT), aims to improve the quality of education and vocational training, giving a European dimension to the educational paths and thus providing the young participants the opportunity to test and improve their skills: professionalism i ...
Read Project

 27

 FINISHED 
One of the greatest challenges facing regulators in the ever changing landscape of novel nano-materials is how to design and implement a regulatory process which is robust enough to deal with a rapidly diversifying system of manufactured nanomaterials (MNM) over time. Not only does the complexity of the MNM present a problem for regulators, the validity of data decreases with time, so that the wel ...
Read Project

 46

 FINISHED 

Exascale Compound Activity Prediction Engine (ExCAPE)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Scalable machine learning of complex models on extreme data will be an important industrial application of exascale computers. In this project, we take the example of predicting compound bioactivity for the pharmaceutical industry, an important sector for Europe for employment, income, and solving the problems of an ageing society. Small scale approaches to machine learning have already been trial ...
Read Project

 10

 FINISHED 

Frans Schartau Business Institute HVE Mobility

Start date: Aug 8, 2016, End date: Aug 7, 2018,

The project will run from August 2016 to July 2018 and includes staff and VET learners from four professional areas at Frans Schartau Business Institute in Stockholm. Stockholm is one of northern Europe’s strongest growth areas and Higher Vocational Education is provided within the Tourism, Visitor & Hospitality industry, Finance, Healthcare and Retail. There are just over 800 HVE learners at the ...
Read Project

 15

 FINISHED 

APL på Vipan

Start date: Jun 1, 2016, End date: May 31, 2018,

Our school educates young people, which in the future will be craftsmen and women in different fields. They will have to work in a globalized world and need to get knowledge and skills in intercultural communication. Both our Students in the Hotel and tourism program as our Construction Students need to get out and get experience of working in other countries. For us it is obvious that we must off ...
Read Project

 5

 FINISHED 

Through a Glass, Darkly: A European Literary Pilgrimage

Start date: Sep 1, 2015, End date: Aug 31, 2017,

The project involves the translation, publication, promotion and distribution of 6 works of contemporary European fiction into Macedonian. The works are to be published in the Europae speculum series, founded especially for this occasion. Since all the novels revolve around the idea of a journey to (self-)awareness, the project is entitled Through a Glass, Darkly: A European Literary Pilgrimage.Al ...
Read Project

 1

 FINISHED 
Telecom satellites are growing like giants employing multiple beams to provide high speed connectivity and broad coverage. Under exploding capacity requirements, vendors admit that a technology and payload architecture switch is mandatory. The new technology has to deliver practical, low-power and scalable components with high performance under harsh environment conditions. BEACON aims to provide ...
Read Project

 8

 FINISHED 
In line with the objectives of the Europe2020 Strategy and ET2020, through "Mobil-ITA Senza Frontiere", the consortium, led by the Agricultural Technical School "F.lli Agosti" of Bagnoregio (VT), aims to improve the quality of education and vocational training, giving a European dimension to the educational paths and thus providing the young participants the opportunity to test and improve their s ...
Read Project

 30

 FINISHED 

European Partnerships Inspiring Careers

Start date: Jun 1, 2015, End date: May 31, 2017,

The EPIC (European Partnerships Inspiring Careers) project will capitalise on the strong relationship we have had with partners under previous mobility programmes. 38 students in small groups, typically from recognised areas of severe deprivation with associated low achievement of high level qualifications or skilled employment, will have the opportunity to enter a competitive recruitment process ...
Read Project

 4

 FINISHED 

KTS und Europa...ein Mehrwert fürs Leben! (2016)

Start date: Jun 1, 2016, End date: May 31, 2017,

The present project deals with the implementation of internships of persons in initial vocational training in the following countries : Germany , Great Britain, Spain, Portugal, Italy, Malta, Ireland and Turkey.The participants in this project attend the Carinthian Tourism School Warmbad Villach, which offers three types of schools : HFS (3 years), HLT (5 years) and a College (4 semesters ). The ...
Read Project

 14

 FINISHED 

DRP International Internship

Start date: Jun 1, 2015, End date: May 31, 2017,

“De Rooi Pannen” recognizes the importance of an internship abroad for the students and tries to stimulate this, for some, difficult step. In these economic hard times, foreign companies find it more and more difficult to give students an allowance for their internship. This is the reason not every student can go abroad. To enable an internship abroad for all students, this application is done. ...
Read Project

 13

 FINISHED 

VITAL2 - vocational training for agricultural learners and staff2

Start date: Jun 1, 2015, End date: May 31, 2017,

CONTEXT OF PROJECT Education and vocational training are affected by a process of great transformation, necessary to accompany the great change that the crisis requires. In most European countries, the technical-vocational education occupies a central role in the education system and the related curricula studiorum provide interactive teaching methods and learning processes on the job. The labor ...
Read Project

 28

 FINISHED 

ITS made in Italy, WBL made in Europe!

Start date: Jun 1, 2015, End date: May 31, 2017,

In line with the objectives of the Europe2020 Strategy and ET2020, through the project, the Consortium, led by ITS DEMOS, aims to improve the quality of education and vocational training, giving a European dimension to the educational paths and thus providing the young participants the opportunity to test and improve their skills: professionalism in the specific areas of vocational education (agri ...
Read Project

 22

 FINISHED 
New multi-beam Tera-scale capacity satellites will require a disruptive approach to address digital on-board processors that rely on electronics which consume space, power and cost and reach their capacity saturation. The disruptive solution must combine scalability, technical feasibility, power-efficiency and cost-effectiveness. ROBIN aims to provide this solution realizing multi-gigabit optical ...
Read Project

 8

 FINISHED 
Photonics is transforming from a highly-focused telecom technology into a pervasive “enabling” technology. Photonics has the potential to play a critical role in space missions and Europe has the opportunity to lead. In this context, HIPPO aims to lead the “high power photonics” trend and develop a new generation of high-power optical components and modules. HIPPO will do this guided by a leading ...
Read Project

 5

 FINISHED 
eNanoMapper will develop a data management and analysis infrastructure together with ontologies supporting the safety assessment activities of the European Nanomaterials research and development community. The project will address the requirements of safety assessment of nanomaterials by providing databases, analysis tools and ontologies for risk assessment and linking them with existing resources ...
Read Project

 11

 FINISHED 
Environmental wellbeing backed by increasingly severe legislation dictates that pollution and energy consumption by automobiles must be reduced significantly. The outcomes of this project will enable both these imperatives to be achieved simultaneously. The project aim is to establish production lines in Europe that manufacture components for lightweight complex-shaped automobile body structures ...
Read Project

 16

 FINISHED 
One of the central ideas underlying European Lifelong Learning policies is that international mobility should become a natural part of education and training schemes. This helps learners to achieve higher qualification levels which are crucial for a successful first step into the labour market or for career improvements. The EU Member States are fully committed to helping young people take advanta ...
Read Project

 42

 FINISHED 

Delivering Results In Vocational Excellence

Start date: Jul 1, 2014, End date: Jun 30, 2016,

The DRIVE (Delivering Results In Vocational Excellence) project will capitalise on the strong relationship we have had with partners under previous Leonardo Lifelong Learning programmes. 26 students in small groups, typically from recognised areas of severe deprivation with associated low achievement of high level qualifications or skilled employment, will have the opportunity to enter a competiti ...
Read Project

 3

 FINISHED 

DRP International Internship and studies

Start date: Jul 1, 2014, End date: Jun 30, 2016,

“De Rooi Pannen” recognizes the importance of an internship abroad for the students and tries to stimulate this, for some, difficult step. In these economic hard times, foreign companies find it more and more difficult to give students an allowance for their internship. This is the reason not every student can go abroad. To enable an internship abroad for all students, this application is done. ...
Read Project

 8

 FINISHED 

Vipans utlands APL

Start date: Jun 1, 2014, End date: May 31, 2016,

Our school educates young people, which in the future will be craftsmen and women in different fields. They will have to work in a globalized world and need to get knowledge and skills in intercultural communication. Both our Students in the Hotel and tourism program as our Construction Students need to get out and get experience of working in other countries. For us it is obvious that we must off ...
Read Project

 4

 FINISHED 
ToxBank establishes a dedicated web-based warehouse for toxicity data management and modelling, a ‘gold standards’ compound database and repository of selected test compounds, and a reference resource for cells, cell lines and tissues of relevance for in vitro systemic toxicity research carried out across the FP7 HEALTH.2010.4.2.9 Alternative Testing Strategies SEURAT program. The project develops ...
Read Project

 10

 FINISHED 

VITAL - vocational training for agricultural learners and staff

Start date: Nov 1, 2014, End date: Oct 31, 2015,

Project VITAL objectives are: - to provide a “learning by doing” vocational training experience to the target group in UE companies representing a sector best practices in terms of innovation and working methods. - to foster an exchange of knowledge in the agriculture sector - to give the chance to the target group to live a professionalizing experience abroad useful to be spent in the Italian an ...
Read Project

 35

 FINISHED 

Modular CMOS Photonic Integrated Micro-Gyroscope (MERMIG)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

Space system vendors seek for solutions to deliver small size and cost-effective sensor systems to “de-congest” satellite payloads, drastically reduce the equipment cost and open the possibility for new generation of micro-payload systems. MERMIG aims to provide this technology replacing current expensive, bulky, heavy and power-consuming fiber optic gyroscopes (FOGs). To address these key challen ...
Read Project

 8

 FINISHED 

Memory, Youth, Political Legacy And Civic Engagement (MYPLACE)

Start date: Jun 1, 2011, End date: Sep 30, 2015,

MYPLACE explores how young people‟s social participation is shaped by theshadows (past, present and future) of totalitarianism and populism in Europe.Conceptually, it goes beyond the comparison of discrete national „political cultures‟or reified classifications of political heritage („postcommunist‟/‟liberal democratic‟);it is premised rather on the pan-European nature of a range of radical and po ...
Read Project

 20

 FINISHED 
The overall objective of EFENIS is to facilitate and accelerate a move to low carbon manufacturing processes and site management by deployment and demonstration of innovative energy management systems and enabling efficiency technologies, which extend the scope of energy management outside the boundaries of a single plant to total site and then beyond the total site to district heating/cooling sys ...
Read Project

 18

 FINISHED 
"The QUATERNIAN project will use quantum-dot laser technology to expand the product ranges and support the competitive position of European SMEs selling into optical access network markets. Access networks based on optical technologies are rapidly growing, as traditional copper based networking proves overly complex, energy inefficient and has high maintenance cost. With the advent of high-speed m ...
Read Project

 8

 FINISHED 
The project aims at the development of the long term water supply strategy of Érmellék region in the area of the cross-border water body. The bottleneck of the strategy is the low level of information on the groundwater reserves in the region. The existing waterworks suffer from inadequate water quality, obsolete water supply structures and machinery, lack of supply in several settlements. The on- ...
Read Project

 2

 FINISHED 
Solidarity Tracks organized an 11 day training course in Lefkas Greece for 37 youth leaders and youth workers active in the field of non formal education, coming from 19 youth organizations, from 14 different countries of E.U., eastern Europe and the Caucasus. During this Training course, participants exchanged views and applied methods about developing, following and assessing the soft skills ac ...
Read Project

 20

 FINISHED 
The main project activities are the creation of the Concept on scientific decision support network and the Study of TDM in Zala County and the Strategic marketing plan for tourism in Međimurje County. These documents should answer to the currently active questions and needs related to development in the border region and help achieve the overall project objective: to provide high-quality groundwor ...
Read Project

 4

 FINISHED 
Dangerous goods are nowadays primarily transported by trucks – despite higher safety risks and higher environmental costs compared to other transport modes like rail. Intermodal transport offers an alternative but developing efficient interfaces between different transport modes is a challenge to be solved. Regions in central Europe are further disadvantaged due to missing connections across the ...
Read Project

 15

 FINISHED 
The historic environment of Europe is one of its greatest assets and an effective means of reconciling the needs of citizens, economy, community, environment, and society at large: But we cannot take it for granted! Our built heritage is valuable and vulnerable and securing its benefits now and in the future demands focussed action and investment from society, the heritage sector, and above all, t ...
Read Project

 11