Search for European Projects

33 European Projects Found

Searched on 125080 European Projects

 FINISHED 

ELIS - evidenzbasierte Leseförderung in Schulen

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Society, the EU and other communities place multiple developmental tasks on the educational system. For the present project, the following developmental tasks will be focused upon: advancement and consolidation of reading literacy, advancement of participation in society through reading literacy and advancement of readiness for life-long learning.Through these developmental tasks, it will be possi ...
Read Project

 6

 FINISHED 

Führung macht Schule: Schulentwicklung durch gezielte Personalführung

Start date: Sep 1, 2016, End date: Feb 28, 2019,

Leadership makes school: school development through focused personnel managementStudents grow in a world of radical social changes. Strong influence by media, changing family structures, increasing percentage of families with migration background and floods of refugees characterise our living environment. The primary schools, as authentic collective schools, represent an exhaustive spectrum of soc ...
Read Project

 24

 FINISHED 
This project aims for the development of a political agenda to strengthen the requirement of reflective practice in the training of teacher students as a central means of self-regulation in the profession. School internships throughout college show a special potential for shaping professional competence through reflective practice. Therefore, different types of school internships will be used as a ...
Read Project

 6

 FINISHED 

PluriPro - Plurilinguismopromozione e professionalizzazione

Start date: Nov 15, 2016, End date: Nov 14, 2018,

The mobility project PluriPro is a vital step on the way to achieving one of the long term objectives set for the German schools in South Tyrol/Italy: plurilingualism. To achieve said objective the Department of Education for the German Language Group elaborated the package of measures “Promoting plurilingualism at South Tyrol’s German schools (2016 – 2020)” which was approved of by the local gove ...
Read Project

 1

 FINISHED 
... vocational schools in South Tyrol are planned.Besides to the above mentioned professional competences we try to improve interdisciplinary competences. We want them...• to see an autonomous school as a chance and perceive quality management as positive for the school.• to consider their work as an improvement of their carrier opportunities.• to reach a higher level of motivation and to participate ...
Read Project

 2

 FINISHED 

Individuelle Begabungsförderung

Start date: Jul 1, 2016, End date: Jun 30, 2018,

Background information:The Deutschhaus-Gymnasium (DHG) is a grammar school specializing in modern languages and sciences/ technologies and currently has about 1.100 students. There are three main educational areas the school development focuses on:1. the promotion of talent/giftedness (derived from the program of the enhancement of the very skilled students)2. the enhancement of competitive athlet ...
Read Project

 8

 FINISHED 

Teilhabe schaffen durch Differenzierung und Inklusion

Start date: Jun 1, 2015, End date: May 31, 2017,

In recent years the quality criteria "individual support of learners" and "promotion of inclusive education" were rated as weaknesses during school quality audits at most of the evaluated schools in Upper Frankonia. The aim of the Erasmus+ project "Enabling Participation through Differentiation and Inclusion" is to initiate school development processes at Upper Frankonian vocational schools in bot ...
Read Project

 3

 FINISHED 

Projektunterricht im digitalen Zeitalter

Start date: Jun 1, 2015, End date: May 31, 2017,

Project background The use of modern media as well as modern measurement techniques in project work enables pupils to acquire key competences that are vital in professional life nowadays. Such competences are being a team player, reliability and the ability to find creative solutions. By obtaining these abilities pupils receive an ideal preparation for their work life or a successful further educa ...
Read Project

 7

 FINISHED 
The results of P.I.S.A show that there is need for action in Austrian schools regarding the acquisition of reading competences. Since the first research the situation has not improved in spite of an action plan set up by the ministry of education. The only success is the flattening of the declining curve. The initial teacher training as well as the in-service training must strongly focus on readin ...
Read Project

 11

 FINISHED 
The governments of the regions participating in the International Lake of Constance Conference (Internationale Bodenseekonferenz) and the Consortium of Alpine Regions (Arbeitsgemeinschaft Alpenländer) – Bavaria, Baden-Württemberg, Swiss Cantons, Liechtenstein, Trento, South Tyrol, Lombardy, Vorarlberg, Tyrol, Salzburg and Upper Austria – have agreed to carry out a vocational trainee exchange proje ...
Read Project

 8

 FINISHED 

Individuelle Begabungsförderung

Start date: Jul 1, 2014, End date: Jun 30, 2016,

The aims of the project: The core idea was to improve the school’s quality through the development of teaching and to achieve an intensive joint process of improvement by offering the opportunity of mutual visits of teachers and the chance of teaching in partner schools, including feedback from partner to partner. Another goal was to enhance the European dimension of the school (though student con ...
Read Project

 10

 FINISHED 
Intercultural and interreligious dialogue have like the last dramatic occurrences in Europe demonstrate great relevance. This applies also to the Youth work. Youth worker have to create intercultural learning areas and have to be competent in intercultural Situations. YOIN Morocco 2015 offered 28 experts of the international and intercultural Youth work the possibility to meet a Muslim country, th ...
Read Project

 6

 FINISHED 
DIRECTION project aims at the creation of a framework of demonstration and dissemination of very innovative and cost-effective energy efficiency technologies for the achievement of very low energy new buildings . This framework is based in three pillars:• Analysis of suitable energy efficiency technologies (technical and economic viability)• Demonstration activity deployed in three new buildings• ...
Read Project

 11

 FINISHED 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Read Project

 14

 FINISHED 
Within the scope of Pr. 3 of ASP 2007-13 major innovation capacities were focused on knowledge development in Natural Hazard/Risk Management (NHRM) & Risk Governance (RG) (eg. innovation in hazard mapping/protection technology) in various funded projects (& other ETC/national-R&D initiatives). START_it_up will capitalise this knowledge pool by enhancing it into a transnational common state-of-the- ...
Read Project

 8

 FINISHED 
Rivers in SEE region are often threatened by unsustainable use, increasing human pressure, and problems of increased floods and droughts driven by climate change. Inhabitation of floodplain areas, hydropower utilization, navigation, gravel and sand extraction, unsustainable tourism etc. lead to changes in morphology, increased pollution, degradation of aquatic habitats, as well as land use conflic ...
Read Project

 15

 FINISHED 

Greenhouse gas management in European land use systems (GHG Europe)

Start date: Jan 1, 2010, End date: Sep 30, 2013,

The GHG-Europe project aims to improve our understanding and capacity for predicting the European terrestrial carbon and greenhouse gas (GHG) budget by applying a systematic, comprehensive and integrative approach. GHG-Europe quantifies the annual to decadal variability of the carbon and GHG budgets of terrestrial ecosystems in EU27 plus Switzerland and in six data-rich European regions via data-m ...
Read Project

 44

 FINISHED 
Transport security and accessibility are essential for a balanced and sustainable development of ASP. Due to current climatic trends, the vulnerability of transport infrastructure to natural hazards has increased. But the specific threats to transport infrastructure have not yet been tackled in a systematic joint effort. Therefore the goal of PARAmount is to improve risk management strategies for ...
Read Project

 13

 FINISHED 
The strong increase of total transalpine traffic and its further growth is a heavy strain for Alpine regions. Effective measures are necessary for enabling a sustainable development.iMONITRAF!s objectives are to develop common strategies for transalpine traffic and to put them into action. A long-lasting political network shall be established, which serves as common voice of the Alpine regions and ...
Read Project

 10

 FINISHED 
The project is focused on strengthening SMEs in the building sector because of their great importance as employers in alpine valleys. New developments and changes concerning building techniques of energy saving and producing buildings (ESAP buildings) require cross-sectoral networks and collaborations of SMEs. Because of the increasing complexity in this field there is the need for customers, espe ...
Read Project

 13

 FINISHED 

actical Use of MONITORing in Natural Disaster Management (MONITOR II)

Start date: May 31, 2009, End date: May 29, 2012,

Management of natural hazards constitutes a common challenge in the SEES. Until now, neither hazard mapping nor contingency planning have been transnationally coordinated and defined in a sufficient manner. These gaps will be tackled in MONITOR II with the development of a common methodology and a CSA ("Continuous Situation Awareness") system. The integration of monitoring systems facilitates peri ...
Read Project

 13

 FINISHED 

Adaptation to Climate Change in the Alpine Space (AdaptAlp)

Start date: Aug 31, 2008, End date: Aug 30, 2011,

Climate change is to a large extent constituted by increasing temperatures and changed precipitation patterns. Any change of these critical factors has implications on the frequency & extent of natural hazards. The uncertainties and the increase of natural hazards due to the impacts of CC requires concerted management in the Alpine Space. AdaptAlp will improve information on impacts of CC esp. on ...
Read Project

 16

 FINISHED 

maNET - Permafrost long-term monitoring network (PermaNET)

Start date: Jun 30, 2008, End date: Jul 13, 2011,

Permafrost is highly sensitive to climatic changes. Permafrost degradation and related natural hazards affect traffic routes, tourism areas, settlements and infrastructures. The main problem is a lacking strategy for the consideration of these newly observed specific impacts of climate change in risk prevention and territorial development. With the joint development of a common strategy for dealin ...
Read Project

 14

 FINISHED 
Since 1990, the EU has provided financial support for internal and external cross-border cooperation, helping to establish cross-border programme structures and to implement numerous cross-border projects along the EU’s internal and external borders. Despite the progress made, there are still a large number of cross-border problems, especially along the current (and future) external borders of the ...
Read Project

 25

 FINISHED 
ALP ENvironmental COMmunication is an integrated approach for protected area managers to ensure common planning and communication on environmental management through regular exchange and training, and to improve the public awareness of environmental issues. On one hand, the project is based on exchange of experience and evaluation of management measures, which will lead to integrated strategies fo ...
Read Project

 10

 FINISHED 

Hazard Monitoring for Risk Assessment and Risk Communication (MONITOR)

Start date: Dec 31, 2005, End date: Dec 30, 2007,

The infrastructure in mountainous areas or regions with seismic activity is greatly threatened by hazards such as landslides, avalanches or earthquakes. MONITOR offers a basis for a standardised risk management of land-use activities threatened by natural hazards. The project's target groups and their regions vary in their risk exposure and their hazard potentials. MONITOR takes into account a bro ...
Read Project

 10

 FINISHED 

Sustainabiltiy in Tourism and Resource Management (SiTaR)

Start date: Dec 31, 2003, End date: Dec 30, 2007,

The RFO Sitar - Sustainability in Tourism and Resource Management - focuses on tourism (focus on health-tourism, eco-tourism and culture-tourism) and resource management (focus: renewable energy, waste water management and renewable primary products), sectors that are extremely important for the development, labour markets and gross national product of the participating regions. The partner region ...
Read Project

 4

 FINISHED 
Iq-Train aims at- supporting INTERREG-actors at all levels in their professional tasks and career by setting up and operating a userfriendly know-how-transfer-system- improving skills and attitudes of INTERREG-actors in the context of programmes, projects and interregional and intercultural joint development- strengthening the capabilities and competencies to meet the challenges coming along with ...
Read Project

 9

 FINISHED 

Rural Extension Network Europe (R.E.N.E.)

Start date: Mar 31, 2003, End date: Mar 30, 2007,

The overall objective of R.E.N.E. is to strengthen the competitiveness of rural areas through the provision of a platform for exchanging information, experience and know-how on rural problems and solutions to these problems. The network aims to improve the synergy of rural area policies and funding programmes and strengthen the know-how of rural extension institutions responsible for these policie ...
Read Project

 17

 FINISHED 
The use of modern space based techniques gives us new potential to monitor and prevent natural risk, reduce economic losses, and save lives.The aim of the ALPS-GPSQUAKENET is to build up a high-performance transnational space geodetic network of Global Positioning System (GPS) receivers in the Alpine Space. This GPS array, within the millimeter-per-year precision, will represent the first ever ins ...
Read Project

 13

 FINISHED 
TUSEC-IP is a contribution to balanced and sustainable spatial development in the Alpine Space where soil and land are highly restricted resources. Partners from various countries will set up a tool for a better management of urban soils in planning procedures.The tool has to be simple, user-orientated, plausible and scientifically founded. For that scientific institutions and planners from munici ...
Read Project

 10

 FINISHED 

Value Added Wood - fostering a dynamic competence area (VAW)

Start date: Jun 30, 2004, End date: Jun 29, 2006,

The operation VAW- Value Added Wood - Fostering a Dynamic Competence Area joins eight European wood clusters in developing new ideas and policies to stimulate the sector. Participating clusters have specific competences and strategies but also face a range of common challenges, including low export rates and a high pressure on prices, limited innovation management skills and a low value added in p ...
Read Project

 8

 FINISHED 

ALPINETWORK (ANT)

Start date: Apr 30, 2003, End date: Apr 29, 2006,

Information and communication technology (ICT) creates opportunities for rural areas to overcome their economic disadvantages. ANT coaches innovative IT pilot projects and implements transnational (tn) and intraregional networking, know-how transfer and education of "local innovators". The project activities are experimented with in pilot telecentres. A socio-economic analysis will be conducted pr ...
Read Project

 7