Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Background Austria and Hungary have undertaken efforts to protect and enlarge the habitat of great bustards, a bird species listed in Annex I of the Birds Directive. They have focused on active habitat management and on the maintenance of large areas dedicated to non-intensive farming. But the problem of overhead power lines remains great, causing fatal c ...
Read Project

 10

 FINISHED 

Power Semiconductor and Electronics Manufacturing 4.0 (SemI40)

Start date: May 1, 2016, End date: Apr 30, 2019,

Addressing European Policies for 2020 and beyond the “Power Semiconductor and Electronics Manufacturing 4.0” (SemI40) project responds to the urgent need of increasing the competitiveness of the Semiconductor manufacturing industry in Europe through establishing smart, sustainable, and integrated ECS manufacturing. SemI40 will further pave the way for serving highly innovative electronic markets w ...
Read Project

 38

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 

VOX early MUS

Start date: Sep 1, 2015, End date: Aug 31, 2018,

VOX early MUS aims to improve the quality and relevance of higher music education through creating a joint master program on vocal early music small ensembles, at the excellency level. Under this frame, prestigious teachers, students and professionals from European conservatories and potential employment institutions will gather in order to exchange good practices on innovative methods and approa ...
Read Project

 8

 FINISHED 

Promoting authentic language acquistion in multilingual contexts

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The project PALM (Promoting authentic language acquisition in multilingual contexts) aims to encourage 6-14 year-old speakers of English, French, German, Hungarian, Italian, Ladin and Spanish to produce authentic texts (written, audio- and video recorded) in their coursework and free-time with the goal to create interesting reading and listening material for learners of the same age who want to st ...
Read Project

 10

 FINISHED 
The aim of this project is to improve the knowledge of teachers/students as well as of pupils concerning the use of IKT-tools and should encourage teachers to use various forms of teaching methods. Our main aim is to improve the quality of education and the quality of the interface between primary and secondary school. In constant interchange and by the use of digital learning scenarios (e.g. OTP) ...
Read Project

 8

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The aim of the project is to collaboratively address a common innovation support challenge; namely to improve the use of public funds for R&D&I enabling synergies between ESIF, H2020 and other funds. Intermediary organizations offering support services on funding opportunities to SMEs are relevant actors in this process from two main points of view: 1) they can help policy makers in the developmen ...
Read Project

 3

 FINISHED 

Szövetség az Európai Megújuló Energetikai Szakképzésért

Start date: Sep 1, 2015, End date: Aug 31, 2017,

...ith environmental, rural development, and adult training profile, was also the lead partner of SEE-REUSE project. Members are the austrian Berufsförderungsinstitute (BFI), the regional VET centre of Burgenland, the slovenian Dvojezična srednja šola Lendava offering technical and mechatronics vocational education, and the municipality of Tab. Tab is acting on behalf of its vocational school Rudnay ...
Read Project

 4

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The Minister of Interior (MoI), National Directorate General of Disaster Management (NDGDM), Disaster Management Training Centre (DMTC of Hungary, Budapest) would like to attend to the ERASMUS + programme of the 2016 year to develop the knowledge of the teachers, get acquainted with the best practice of the foreign educational institutions, to join theirs vocational trainings, to raise up our prof ...
Read Project

 5

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Sport Fair bindet

Start date: Aug 1, 2015, End date: Aug 31, 2016,

The project tries to improve the partnership between young people from the council of Rechnitz and the city of Alzey in order to help them to share experiences. Fifteen participants from Rechnitz as well as 15 participants from Alzey will join the project. The aim of this project is to explore the culture of the partner’s organisation and to create a positive image for the integration of other cul ...
Read Project

 2

 FINISHED 

Academic Writing Online

Start date: Sep 1, 2014, End date: Aug 31, 2016,

...sh judgments. Every module will be composed of text including exercises and videos with teachers who give explanatory advices. The online course will be developed in German and English by the UAS Burgenland and translated into the five CEE languages Czech, Slovak, Hungarian, Slovenian and Croatian by the partner organisations. The translation work will be accompanied by cultural adaptions concerni ...
Read Project

 8

 FINISHED 
... the modelling of social processes on individual spirituality, world-openness, creativity and fantasy. The participants in the training are employed resp. free collaborators of Europahaus Burgenland who often contribute to exhibitions, conferences, the construcion of a cosmopolitan library and encyklopedia as well as to the cosmopolitan garden. On both trainings - in Oxford and Sweden - 2 people ...
Read Project

 3

 FINISHED 

A tűzoltóképzés módszertani megújulása Magyarországon

Start date: Jun 1, 2015, End date: May 31, 2016,

After the successfull application of the ERASMUS + 2015 the MoI National Directorate General of Disaster Management Disaster Management Training Centre attended to the ERASMUS + Programme to develop the knowledge of the teachers by the given partners' good experience, to join theirs vocational trainings to raise up our professional practise and experience, to visit the similar foreign schools, cen ...
Read Project

 5

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

...Charter + in which the quality framework for European and international cooperation activities has been defined. The vision and the internationalization strategy of the University of Applied Sciences Burgenland form the background of this project. Vision of the University of Applied Sciences Burgenland: "We are an international university; we regard the cultural diversity among students, teachers, ...
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Cross-border Water Supply Development in the Pannon-Fertő Region

Start date: May 31, 2013, End date: Jun 29, 2015,

The project aims at the cross-border connection of the water supply systems of Central and Northern Burgenland (AT) and the region of Sopron (HU) in order to improve the quality of drinking water, to preserve the water resources in a sustainable way and to decrease energy use, by shortening pumping distances. The predecessor project aiming at investment preparation and planning is under implementa ...
Read Project

 4

 FINISHED 

Kreative Wertschöpfungskette (CREATIVE)

Start date: Dec 31, 2012, End date: Dec 30, 2014,

Die Europäische Kommission hat das Grünbuch zur Erschließung des Potenzials der Kultur- und Kreativindustrien am 29. April 2010 publiziert. Die Publikation des Dokumentes erfolgte nach einer Erschließung des Europäischen Rates, die festgelegt hat, dass die Entwicklung der Kreativwirtschaft ein bedeutender Faktor der europäischen Prosperität sei. Auch das Europäische Parlament hat die EK aufgerufen ...
Read Project

 5

 FINISHED 

Multilinguale Betreuung in Agendorf und Draßburg (MULTILING)

Start date: Sep 30, 2012, End date: Dec 30, 2014,

...erden folgende Aufgaben verwirklicht:•Qualitätssicherung und wissenschaftliche Unterstützung der multilingualen Betreuung mit Einbeziehung von Studierenden und PädagogInnen der PH Burgenland und NYME BPK•Sensibilisierung der lokalen Bevölkerung zum Thema multilinguale Betreuung (z.B. Organisation von Elterninformationsveranstaltungen)•Dissemination der Ergebnisse, damit die angewandten Methoden in ...
Read Project

 4

 FINISHED 

MOVE ON GREEN (MOG)

Start date: Dec 31, 2011, End date: Dec 30, 2014,

Sustainable transport is vital to maintaining the environmental and economic health of rural areas, as well as to ensuring the access of both inhabitants and potential visitors to key services such as employment, education and healthcare.Rural areas policy-makers have come to realise that the lack of sustainable mobility schemes is a cross-cutting element which affects every development strategy i ...
Read Project

 13

 FINISHED 
In einer Grenzregion muss es für Rettungsorganisationen selbstverständlich sein, im Ernstfall auch grenzüberschreitend den von Naturkatastrophen oder Unfällen betroffenen Personen medizinische oder psychologische Hilfe und Versorgung mit Nahrungsmitteln und Notunterkünften zukommen zu lassen. Die Abläufe im Katastrophenfall müssen effizient und rasch durchgeführt werden.Gerade in einer Grenzregion ...
Read Project

 2

 FINISHED 

Zukunft im Grenzraum (IGR)

Start date: Nov 30, 2007, End date: Dec 30, 2014,

Dies geht oftmals mit den Nachteilen einher, keinen ausbildungsadäquaten Arbeitsplatz zu bekommen und um bis zu 40% weniger Lohn zu bekommen als ein inländischer Beschäftigter.Die Grenzregion Burgenland - Westungarn ist von der schrittweisen Liberalisierung des Arbeitsmarktes besonders betroffen. Die Folge davon ist erhöhter Druck auf den burgenländischen Arbeitsmarkt durch Lohndumping und Verdrän ...
Read Project

 2

 FINISHED 

TERritory, eneRgy & Employment   (TERRE)

Start date: Nov 30, 2012, End date: Dec 30, 2014,

The envisaged balance of the SEE programme area in economic and social development leads to an increasing demand in energy provision, mainly provided by the carbon-neutral production of energy. Indeed, the achievement of a sustainable energy future in South East Europe requires new investments in R&D, as well as key policy initiatives to overcome existing technical, ideological and economic obstac ...
Read Project

 13

 FINISHED 
Ziel des Projekts RegioInfoPoint SKAT ist der Aufbau einer Tourismusregion Trnava durch praxisorientierten Know-How Transfer. Die etablierten Tourismusverbände Burgenlands übernehmen dabei eine Patenschaft für die Region Trnava. Das Projekt sorgt für eine Vernetzung der Regionen Burgenlands und Trnavas auf Ebene des Tourismus durch die gemeinsame Bewerbung und Gästeberatung der Regionen in Informa ...
Read Project

 3

 FINISHED 
Im Fokus dieses Projektes stehen die demographische und wirtschaftliche Entwicklung der Stadtregion Bratislava und der angrenzenden Region Nordburgenland. Bratislava ist derzeit von einer Auslagerung des Wohnens in suburbane Regionen betroffen. Im Nordburgenland gibt es neben Gemeinden mit einer dynamischen Wachstumsstruktur Orte, die mit Bevölkerungsrückgang, schrumpfenden Ortszentren und struktu ...
Read Project

 3

 FINISHED 

Regional Cooperation Management SK-AT (RECOM SK-AT)

Start date: Dec 31, 2007, End date: Dec 30, 2014,

In der Grenzregion SK-AT herrscht großes Interesse an grenzüberschreitenden Aktivitäten. Um besonders regionale/lokale AkteurInnen bei ihren Vorhaben unterstützen und die Projektqualität sicherstellen zu können, sind geeignete Unterstützungsstrukturen sowie Aufbau und Intensivierung von Netzwerken in der Projektregion notwendig. Über das Projekt RECOM wird diese interregionale vernetzte Plattform ...
Read Project

 4

 FINISHED 

REGIONAL COOPERATION MANAGEMENT HU - AT (RECOM HU-AT 2014)

Start date: Dec 31, 2011, End date: Dec 30, 2014,

Aufgaben werden im Rahmen des Projektes verwirklicht:•Entwicklung einer grenzüberschreitenden Regionalentwicklungsstrategie•Unterstützung bei der Entwicklung von grenzüberschreitenden Projektideen•Auf- und Ausbau eines Wissensmanagements zwischen Österreich und Ungarn•Innovationspreisverleihung zur Prämierung von grenzüberschreitenden Projekten•Kleinprojektefonds für bilaterale Kooperationen von V ...
Read Project

 4

 FINISHED 

Renewable Energy & Efficiency Action (REACT)

Start date: Jul 31, 2012, End date: Dec 30, 2014,

Das Projekt REACT leistet einen Beitrag zur Energieeffizienz von Gebäuden und zur Produktion von erneuerbarer Energie.Der Gebäudesektor hat in Österreich einen Anteil am Gesamtenergieverbrauch von etwa 40%. Um diesen Verbrauch zu reduzieren, wird ab 2020 die Niedrigenergiebauweise als Standard bei Neubau und Sanierung vorgeschrieben, wofür jedoch entsprechende Gebäudekonzepte fehlen. Andererseits ...
Read Project

 6

 FINISHED 
The SOLUTION project mobilises public / private resources to build showcases of energy self sufficient communities in Austria, Croatia, Finland and Switzerland (together with the associated Slovenian community) with a strong potential for replication throughout Europe. SOLUTION is designed to respond to the needs of an effective take-off of the European SET-plan by demonstrating novel applications ...
Read Project

 19

 FINISHED 

Internationale Jugendbegegnung - 25 Jahre Fall des Eisernen Vorhanges

Start date: Aug 1, 2014, End date: Oct 31, 2014,

2014 is the 25th anniversary of the collapse of the Iron Curtain. The generation born around 1989 hardly feels connected to the events that happened during this year. Therefore, it is of great importance to recall these events as well as the developments of these past 25 years. The fall of the Iron Curtain significantly changed the face of Europe basically overnight and the awakening of a new Euro ...
Read Project

 4

 FINISHED 
In 2009, the European Parliament asked the Commission and the Member States to consider the EuroVelo- Network and Iron Curtain Trail as an opportunity for promoting European trans-border cycling infrastructure networks, supporting soft mobility and sustainable tourism?. The European Commission organised workshops to raise awareness of the ICT and awarded grants to preparatory projects to define th ...
Read Project

 15

 FINISHED 

Sustainable Transport and Tourism along the Danube  (TRANSDANUBE)

Start date: Sep 30, 2012, End date: Sep 29, 2014,

The Danube is passing 10 countries on its way to the Black Sea. Therefore it is one of the most transnational rivers in the world. It is a river full of history and an important interlink between the regions of South East Europe. Several initiatives clearly identified the need for cooperation to boost the development of the Danube region. With the endorsement of the EU Strategy for the Danube Regi ...
Read Project

 14

 FINISHED 
...e very popular among citizens and professionals.In Brno(CZ),the thorough housing needs survey will provide local administrators with precious data for future policies.In Weppersdorf(AT),the Samaritan Burgenland is testing an innovative ICT environment for the elderly residing in its integrated supervised flats,helping people to remain active as well as staying socially connected.For more informati ...
Read Project

 12