Search for European Projects

11 European Projects Found

Searched on 125080 European Projects

 FINISHED 
I - Over forty million workers in the EU are affected by work-place related musculoskeletal disorders, as a result of working in painful or tiring positions and handling heavy loads with repetitive hand or arm movements.II - The aging population is growing fast and approaching the mean age where loss of function and hence loss of mobility is to begin. In addition to diabetic and obesity, in 5 year ...
Read Project

 13

 FINISHED 
EGNSS high Accuracy SYstem improving PhotoVoltaic plants maintenance.The purpose of the EASY PV proposal is to provide a time and cost effective service as direct response to the growing need expressed by several maintainers and PV field owners to enhance the energy production of their plants.As photovoltaic plants are aging, it is not uncommon that their production lowers due to inefficiency caus ...
Read Project

 6

 FINISHED 

TRAINING EXPERIENCIE IN EUROPE ALHAMBRA II

Start date: Sep 1, 2016, End date: Dec 31, 2017,

The “TRAINING EXPERIENCE IN EUROPE ALHAMBRA II” Project is promoted by the Consortium of the following VET Schools (sending organisations).- “Virgen de las Nieves” VET School Consortium Coordinator (Granada)- “Moraima” (Loja, Granada) VET School.- “Pedro Jiménez de Montoya” VET School (Baza, Granada)- “La Zafra” VET School (Motril, Granada)- “Albayzín” VET School (Granada)- “Padre Poveda” VET Sc ...
Read Project

 20

 FINISHED 

YOUNG EUROLAB II

Start date: Sep 1, 2016, End date: Dec 31, 2017,

1.- BACKGROUND: The Erasmus+ “YOUNG EUROLAB II” Project, is promoted by the Consortium of Mobility that consists of the next entities:- Municipal Institute for Employment and Bussiness Training (IMEFE). Coordinator and Sending organisation- Virgen del Carmen, VET school. Sending Organisation, Jaén- Santa María de los Apóstoles. VET school. Sending Organisation, Jaén- San Juan Bosco. VET school. Se ...
Read Project

 17

 FINISHED 

LET´S IMPROVE IN EUROPE III

Start date: Sep 1, 2016, End date: Dec 31, 2017,

The Project promoter is the Consortium LOS VIVEROS, composed of:- “San José de la Rinconada” VET School, Coordinator and Sending Organisation (San José de La Rinconada, Sevilla) - “Los Viveros” VET School, Sending Organisation (Sevilla)- “Antonio Ulloa” VET School, Sending Organisation (La Rinconada, Sevilla)- “Juan de Mairena” VET School, Sending organisation (Mairena del Aljarafe, Sevilla)- “Cam ...
Read Project

 18

 FINISHED 

NEXT STOP EUROPE

Start date: Sep 1, 2016, End date: Dec 31, 2017,

1.- BACKGROUND: The Mobility Consortium that promotes “NEXT STOP EUROPE” Project is constituted by six schools from small rural cities located in the line between the provinces of Seville, Córdoba and Málaga.- “Aguilar y Cano” VET School, (Coordinator and Sending Organisation - Estepa, Sevilla) - “Flavio Irnitano” VET School (Sending Organisation – El Saucejo, Sevilla)- “Juan de la Cierva” VET Sc ...
Read Project

 26

 FINISHED 
"The objective of this project is to regroup a cluster of private and academic laboratories supported by key manufacturers from both aeronautic, automotive and railway sectors in order to investigate the possibility to benchmark specific composites :• from the aeronautics. Depending on the application targeted, the cluster will be able to take advantage of the mutual return on experiment in order ...
Read Project

 19

 FINISHED 
School of applied arts prepares students for practice in the field of arts or for further study of art. This project was first within the Erasmus+ programme -KA1 Mobility project for VET learners and staff. From the project we expected short-term, medium-term and long-term betterment on individual and school level. We wanted to raise the level of students independent preparation and motivate them ...
Read Project

 6

 FINISHED 

Towards Zero Waste in Industrial Networks (ZeroWIN)

Start date: May 1, 2009, End date: Apr 30, 2014,

The first work package will define a common vision on zero-waste entrepreneurship within the first 6 months. The mythos Individual Producer Responsibility will be investigated if it can become the all-healing-solution in electronics industry as well as how this concept can be applied to other industrial sectors. WP2 concentrates on new technological developments, WP3 on waste prevention methodolog ...
Read Project

 33

 FINISHED 

Solid State Lighting for Europe (SSL4EU)

Start date: Jul 1, 2010, End date: Jun 30, 2013,

The lighting industry worldwide faces a paradigm shift as a new era of lighting appears at the horizon: that is Solid State Lighting (SSL). Light emitting diodes (LEDs) based on inorganic semiconductors are mercury-free, have a long lifetime and instant on/off, can be colour tunable and most important: they will become the light source with the highest energy-efficiency in the near future. Thus, L ...
Read Project

 10

 FINISHED 
Within the objectives and the priorities selected within the referring Call for Proposals, the partnership has realized an intervention aiming to the review, upgrading, adaptation (both technological as well as targeted oriented), translation, transfer and dissemination of the final outcomes ofthe selected good practice of “CON-PARI E GENERIO" project, which consisted in the experimentation of gui ...
Read Project

 9