Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The main goal of the CLOVER project is to offer a novel methodology in an environmental mechatronic control system design relying on multidisciplinary knowledge. This methodology should allow aspects to be taken into account, such as controller robustness, indirect measurement of system states and parameters, and disturbances attenuation on the stage of establishing controller architecture. In add ...
Read Project

 9

 FINISHED 
The FUTURE-RADAR project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) and the European Green Vehicle Initiative PPP to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FUTURE-RADAR will provide the consensus-based plan ...
Read Project

 23

 FINISHED 
Within the project a new highly efficient biomass CHP technology consisting of a fuel-flexible fixed-bed updraft gasifier, a novel compact gas cleaning system and a solid oxide fuel cell (SOFC) shall be developed for a capacity range of 1to 10 MW (total energy output). The technology shall distinguish itself by a wide fuel spectrum applicable (wood pellets, wood chips, SRC, selected agricultural f ...
Read Project

 9

 FINISHED 
The INSIGHT project aims at developing a Monitoring, Diagnostic and Lifetime Tool (MDLT) for Solid Oxide Fuel Cell (SOFC) stacks and the hardware necessary for its implementation into a real SOFC system. The effectiveness of the MDLT will be demonstrated through on-field tests on a real micro-Combined Heat and Power system (2.5 kW), thus moving these tools from Technology Readiness Level (TRL) 3 t ...
Read Project

 11

 FINISHED 
The aim of INN-BALANCE is to develop a novel and integrated development platform for developing advanced Balance of Plant components in current fuel cell based vehicles, in order to improve their efficiency and reliability, reducing costs and presenting a stable supply chain to the European car manufacturers and system integrators. Accordingly, INN-BALANCE technical objectives are (i) to develop h ...
Read Project

 9

 FINISHED 
"The main target of the ITEAM project is to establish and sustainably maintain the European training network with high grade of interdisciplinarity, which will train strong specialists skilled in research and development of novel technologies in the field of multi-actuated ground vehicles (MAGV). The global goals are: (i) Advance of European postgraduate education in the area of environment- and u ...
Read Project

 11

 FINISHED 

Dependability Engineering Innovation for CPS - DEIS (DEIS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Cyber-Physical-Systems harbor the potential for vast economic and societal impact in all major application domains, however in case of failure this may lead to catastrophic results for industry and society. Thus, ensuring the dependability of such systems is the key to unlocking their full potential and enabling European industries to develop confidently business models that will nurture their soc ...
Read Project

 10

 FINISHED 

High efficient Particulate free Gasoline Engines (UPGRADE)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The UPGRADE project aims to support the transition to a high efficient, cleaner and affordable powertrain technology systems, based on Spark Ignited GDI (Gasoline Direct Injection) approach, suitable for future Light Duty applications. The project also includes a deep analysis of the phenomenon of the formation of the nanoparticles in relationship to the engine design and its operating conditions ...
Read Project

 12

 FINISHED 
The COMPASS project is a collaborative effort of AVL, Plansee, Nissan and Research Center Jülich to develop advanced SOFC APU systems for range extender applications in passenger cars. The consortium is perfectly integrated from powder-, cell-, stack-, APU system technology providers to vehicle manufacturer and an academic partner. The project will use innovative metal supports SOFC stack technolo ...
Read Project

 4

 FINISHED 
DownToTen will seek to develop a reliable and robust methodology to enhance the regulatory approach in the assessment of particle number emissions in the sub 23nm region (down to at least 10nm), focusing on state-of-the art automotive powertrains with direct injection gasoline engines, but also diesel ones, under real-world operation conditions. To this end, DownToTen will first investigate and qu ...
Read Project

 8

 FINISHED 
Fuel economy is a key aspect to reduce operating costs and improve efficiency of freight traffic, thus increasing truck competitiveness.The main objective of the IMPERIUM project (IMplementation of Powertrain Control for Economic and Clean Real driving EmIssion and ConsUMption) is to achieve fuel consumption reduction by 20% (diesel and urea) whilst keeping the vehicle within the legal limits for ...
Read Project

 16

 FINISHED 
Reduction of soot emissions from Diesel engines will be explored by utilising simultaneously (a) injection pressure between 2000-4500bar, (b) engine operation at supercritical conditions relative to the injected fuel’s critical point and (c) additives that improve atomisation and reduce pollutant formation. The detailed processes of nozzle flow cavitation/boiling, atomisation, phase-change and mix ...
Read Project

 8

 FINISHED 

Future Freight Loco for Europe (FFL4E)

Start date: Sep 1, 2016, End date: May 31, 2019,

Since 2008, the rail freight market has not yet recovered from the global recession and profit margins in the railway sector have been falling throughout Europe. Moreover, competition was able to increase their capacity due to innovations. Within the last 15 years, inland vessels have increased their transport capacity by 158%, truck transportation by up to 50% while rail freight transportation on ...
Read Project

 7

 FINISHED 

Power Semiconductor and Electronics Manufacturing 4.0 (SemI40)

Start date: May 1, 2016, End date: Apr 30, 2019,

... impact to the society, future working conditions and skills needed.Applying “Industry 4.0”, “Big Data”, and “Industrial Internet” technologies in the electronics field requires holistic and complex actions. The selected main objectives of SemI40 covered by the MASP2015 are: balancing system security and production flexibility, increase information transparency between fields and enterprise resour ...
Read Project

 38

 FINISHED 
The project aims at the development of a new innovative highly efficient and fuel flexible micro-scale biomass CHP technology consisting of a small-scale fixed-bed updraft gasifier, a compact gas cleaning system and a solid oxide fuel cell (SOFC). The technology shall be developed for a capacity range of 25 to 150 kW (fuel power) and shall be characterised by a wide fuel spectrum applicable (wood ...
Read Project

 8

 FINISHED 
...or signal stimuli generators, which will be demonstrated for at least 3 physical stimuli generators. 3. Raising significantly the level of dependability of automated systems due to provision of a holistic test and validation platform and systematic coverage measures, which will reduce the probability of malfunction behavior of automated systems to 10E-9/h. 4. Provision of a validation environment ...
Read Project

 76

 FINISHED 

Solid Oxide Stack Lean Manufacturing (SOSLeM)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The proposed SOSLeM project will contribute to the call objectives by improving production processes as well as developing and applying novel manufacturing technologies for FC stacks. The improvements proposed by the project will sum up to a reduction of manufacturing costs of about 70%, leading to decreased capital cost of about 2.500 €/kW. Besides these outstanding economical and technical impro ...
Read Project

 6

 FINISHED 
...ew areas not covered by those projects. The ultimate aim is to lower certification costs in face of rapidly changing product features and market needs. This will be achieved by establishing a novel holistic and reuse-oriented approach for architecture-driven assurance (fully compatible with standards e.g. AUTOSAR and IMA), multi-concern assurance (compliance demonstration, impact analyses, and com ...
Read Project

 32

 FINISHED 
‘Massive Open Online Courses’ (MOOCs) caused a major impact on HEIs worldwide. Business models, target groups, quality standards, certification, sustainability, teaching, delivery & learning methods are all affected. Europe is yet to respond to these emerging trends. Initiatives in the EU exist, but remain isolated, both geographically and per sector. They lack impact on the HEI area as a whole, a ...
Read Project

 11

 FINISHED 
Mountain biking currently has no agreed standard for the role of Mountain Bike instructor-guide, with training levels across Europe ranging from 1200 hours to just 14 hours, with some countries having no training system at all. This disparity creates low participation levels, unequal access to tuition and therefore decreased safety and marginalization of the sport's participants and professionals ...
Read Project

 6

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
Cavitation, described as the formation of vapour/gas bubbles of a flowing liquid in a region where the pressure of the liquid falls below its vapour pressure, often leads to vibration and damage of mechanical components, for example, bearings, fuel injectors, valves, propellers and rudders, impellers, pumps and hydro turbines. Cavitation erosion when experienced, normally leads to significant addi ...
Read Project

 8

 FINISHED 

Refugees in vocational Training

Start date: Nov 1, 2016, End date: Oct 31, 2018,

Context and background of the projectThe number of refugees and asylum seekers in Germany and other European countries is increasing. This challenge requires different instruments for fostering their long-term integration, because it cannot be expected that they will be able to get back in their home-countries in the nearer future. Mainly instruments are focused on the satisfaction of basic needs ...
Read Project

 7

 FINISHED 

Empowering climate resilience

Start date: Oct 15, 2016, End date: Oct 14, 2018,

By focusing on urban resilience, CARE addresses one of the most urgent topics in EU and Latin America (LA). Most LA countries are dealing with climate risk management issues, but they lack a holistic and common approach to resilience. International cooperation seems then the best-fit environment where to develop joint learning tools, go in depth on peculiar research and deliver support to policy m ...
Read Project

 16

 FINISHED 

Betriebspraktika in Granada für kaufmännische Assistentinnen

Start date: Oct 1, 2016, End date: Sep 30, 2018,

...and institutions.The interns are obliged to attend a preparatory course four weeks in advance of their departure, confronting them with intercultural differences. As a part of this preparation, a list of personal aims and expectations will be compiled to be evaluated critically subsequent to their return in a contemplation course.Planned activities for all interns include:- practical training per ...
Read Project

 2

 FINISHED 
"The main target of the Mont-Blanc 3 project "European Scalable and power efficient HPC platform based on low-power embedded technology" is the creation of a new high-end HPC platform (SoC and node) that is able to deliver a new level of performance / energy ratio whilst executing real applications.The technical objectives are:1. To design a well-balanced architecture and to deliver the design for ...
Read Project

 10

 FINISHED 

SHare, Improve, develop: today’s excelleNce for tomorrow’s HVET

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The European Union needs competences, innovation, balanced and integrated territory development in order to boost its growth. Indeed, innovation is not only a linear process, a result of R&D activities. On the opposite, more and more innovation sprouts in broad, multi-sectoral socio-economic contexts, strongly application-oriented, and through complex processes, integrating top-down (based on econ ...
Read Project

 8

 FINISHED 

Opération "calcul" à Graphoville

Start date: Sep 1, 2015, End date: Aug 31, 2018,

...ries have shown us that there are no tools to help learners (young people and adults in difficulty, in illiteracy or post-literacy situations) to practise thinking and calculating from realistic situations that also add an element of fun. A model sequence, one of the 20 we would like to create, has been set out on paper and tested at NOSL with young people with a high risk of dropping out. Both th ...
Read Project

 7

 FINISHED 

Lister moving on

Start date: Aug 1, 2016, End date: Jul 31, 2018,

The background for this project is twofold, but in more than one way they are integrated. First, one of the most important challenges in upper secondary school today is reducing the number of so-called "early leavers". The politicians in our area have stated that this is job no 1, and our school has worked continuously to improve the situation for our students. However, this is an international pr ...
Read Project

 5

 FINISHED 

go2europe

Start date: Jul 1, 2016, End date: Jun 30, 2018,

go2europe takes place in the implementation of the project different objective. One hand, the quality of the company and school education in the structurally expandable region Ostfriesland improved, increasing the methods, in particular the technical and social skills of the trainees and vocational students, the discovery of existential resources be increased, on the other hand to promote and supp ...
Read Project

 7

 FINISHED 

Good Start to School

Start date: Oct 1, 2015, End date: Jun 30, 2018,

Early childhood education and care (ECEC) provides the basis of lifelong learning and has become a policy priority in most European countries. Research, conducted by the OECD and the European Commission, recognises that ECEC brings a wide range of benefits, such as social and economic, better child well-being and learning outcomes, more equitable outcomes, reduction of poverty and better social an ...
Read Project

 9

 FINISHED 

Young people in Education and Studies working in Europe

Start date: Oct 1, 2015, End date: May 31, 2018,

The project YES Europe Young people in Education and Studies working in Europe aims at helping students to find study and working options in Europe. In Europe today more and more young people know that they will be unemployed after finishing their schooling and therefore lack motivation to continue with their education and even drop out of school. There are young people needed in many work fiel ...
Read Project

 6

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Auslandspraktika für Jugendliche in der beruflichen Erstausbildung

Start date: Jun 1, 2016, End date: May 31, 2018,

...rrespondent. For both groups doing a period of work experience abroad is an integral part of their courses.The parties taking part within the framework of this placing project are Friedrich-List-Berufskolleg, Hamm (D), Hull College, Hull (UK), Srednja Skola, Biograd na Moru (HR), Alparslan Ticaret Meslek Lisesi, Istanbul (TU), ADC College, London (UK), ISNA, Metz (FR), Lycée St. Exupéry, St. Dizie ...
Read Project

 9

 FINISHED 

Initial VET in Europe

Start date: Jun 1, 2016, End date: May 31, 2018,

The main aim of the Practices Consortium coordinated by Fundació BCN Formació Professional is to improve the competitiveness and employability of recent graduates of initial vocational training of the vocational schools of Barcelona across a period of practices in different European countries. The project also aims to generate a positive impact increasing and diversifying the professional experien ...
Read Project

 11

 FINISHED 
In order to build a successful career in the field of shipping and logistics, it is essential to have experience of being abroad. Therefore, the Friedrich-List-Schule wants to offer its apprentices the opportunity to partake in mobility activities covered as part of the Erasmus+ programme. Through this programme, it would be possible for the apprentices to learn and work in another European countr ...
Read Project

 2

 FINISHED 

Variaoivaa oppimista - Variable learning

Start date: Jun 1, 2016, End date: May 31, 2018,

Variable learning is a project where students and teachers create curricula-based projects together with European partners from Germany, France and Estonia. The projects are created together using mobile- technology and the workshop mobilities are 14 days. Teachers design and guide the project-based learning during the process and their mobilities are 7 days. Project-based learning and teaching is ...
Read Project

 6

 FINISHED 

Educar para la multiculturalidad

Start date: Jun 1, 2016, End date: May 31, 2018,

...ty through intercultural exchange in the classroom" taking place in Larnaca, Cypruss, between 23rd and 31st of January 2017.• The attendance of two teachers in a shadowing programme at "Friedrich-List-Schule" in Kassel the first fortnight of April 2017.• The attendance of two teachers in a shadowing programme at the "Liceo Español Luis Buñuel" in Paris the first fortnight of October 2017.An effici ...
Read Project

 2

 FINISHED 

Europe is us 2.0!

Start date: Jun 1, 2016, End date: May 31, 2018,

The Friedrich-List-Berufskolleg in Herford, Germany offers languages, economy and computer science in its „school profile“. The European notion is strongly anchored in the general concept of our school´s policy. In many programmes, the learning of foreign languages and introducing the European background have been well established at our school. In some cases we were able to sent some students to ...
Read Project

 3

 FINISHED 
...f all sensing methods and algorithms required for advanced driver assistance systems and automated driving. RobustSENSE moves from a platform consisting of several independent subsystems to a holistic approach. RobustSENSE introduces both, reliability measures and self monitoring across all levels of the system allowing two things: 1) Taking appropriate actions and algorithms on the respective sys ...
Read Project

 15