Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The FUTURE-RADAR project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) and the European Green Vehicle Initiative PPP to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FUTURE-RADAR will provide the consensus-based plan ...
Read Project

 23

 FINISHED 
SATELLITE will function as anchor for the entire CIVITAS Network, coordinating and supporting ongoing and future CIVITAS2020 projects. SATELLITE will address the MG5.5b call topic by helping cities gain better access to innovative solutions to properly address transport challenges they are facing. SATELLITE will make sure the latest innovations resulting from European urban mobility research reach ...
Read Project

 7

 FINISHED 

Fishfriendly Innovative Technologies for Hydropower (FIThydro)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The f ...
Read Project

 26

 FINISHED 

CIVITAS DESTINATIONS (DESTINATIONS)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

Within the EU, and particularly following the economic crisis; tourism will be, the ‘engine for economic growth’, particularly in the underperforming Mediterranean economies; where tourism has traditionally been a dominant economic sector. The world market of tourists continues to grow and Europe has unique selling points for further tourist growth from within and outside the EU (including China). ...
Read Project

 30

 FINISHED 
INFRASTAR aims to develop knowledge, expertise and skill for optimal and reliable management of structures. The generic methodology will be applied to bridges and wind turbines in relation to fatigue offering the opportunity to deal with complementary notions (such as old and new asset management, unique and similar structures, wind and traffic actions) while addressing 3 major challenges: 1/adv ...
Read Project

 8

 FINISHED 
Through SUMPs-Up, an experienced consortium of public and private organisations, including four major city networks and seven frontrunner cities, skilled in coordinating major European SUMP projects will accelerate the take-up of SUMPs, where this is currently low, ensuring that SUMP is the primary mobility planning concept in Europe. To achieve this, the project will combine comprehensive SUMP re ...
Read Project

 15

 FINISHED 
According to the European Energy Storage Technology Development Roadmap towards 2030 (EASE/EERA) energy storage will be of the greatest importance for the European climate energy objectives. The Sintbat project aims at the development of a cheap energy efficient and effectively maintenance free lithium-ion based energy storage system offering in-service time of 20 to 25 years. Insights gained from ...
Read Project

 9

 FINISHED 

Dream-like simulation abilities for automated cars (Dreams4Cars)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Dreams4Cars takes inspiration from the Simulation Hypothesis of Cognition – notably in the sense of Hesslow – and in particular from the idea that thoughts are chains of simulated actions and simulated perceptions. The main objective of Dreams4Cars is to set up an offline simulation mechanism in which robots, by recombining aspects of real-world experience, can produce an emulated world, with whic ...
Read Project

 7

 FINISHED 
With the start of the SENTINEL era, an unprecedented amount of Earth Observation (EO) data will become available. Currently there is no consistent but extendible and adaptable framework to integrate observations from different sensors in order to obtain the best possible estimate of the land surface state. MULTIPY proposes a solution to this challenge. The project will develop an efficient and ful ...
Read Project

 9

 FINISHED 

The Cyanobacteria Blooms Public Information Service (CyanoLakes)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

CyanoLakes will be a global service for the environmental authorities and commercial sector, concerned by health risks and quality of water resources. The proposed project will deliver a fully automated application for assessing toxin producing cyanobacteria blooms in water resources globally, using ground-breaking Copernicus Earth Observation technology. The service foresees a dual dissemination ...
Read Project

 8

 FINISHED 
The GOFLEX project will innovate, integrate, further develop and demonstrate a group of electricity smart-grid technologies, enabling the cost-effective use of demand response in distribution grids, increasing the grids’ available adaptation capacity and safely supporting an increasing share of renewable electricity generation. The GOFLEX smart grid solution will deliver flexibility that is both g ...
Read Project

 12

 FINISHED 

Business Transformation towards Digitalization and Smart Systems

Start date: Sep 1, 2016, End date: Aug 31, 2019,

...software house focussing on international applied research and development of tools for all steps of the Business Excellence process. IIC provides worldwide training courses and consultancy for SMEs on Industrial Engineering systems. GAIA represents all Basque companies in the Electronics and IT sector. The Waterford Chamber is the voice of national businesses, lobbying government and other bodies ...
Read Project

 8

 FINISHED 

Teaching and Coaching Innovation & Entrepreneurship InnovaTively

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The project builds on an existing community linked to ISPIM Society focused on innovation and entrepreneurship (I&E) – a theme of central interest in EU as a source of employment and growth. The consortium consists of industrial partners (Nokia Networks, Lufthansa, Torbay Hospital, AachenMuenchener, BMW, Lego) and academics who share a concern with the question:How do we improve on current I&E te ...
Read Project

 12

 FINISHED 
The RESYNTEX project aims at designing, developing and demonstrating new high environmental impact industrial symbiosis between the unwearable blends and pure components of textile waste and the chemical and textile industries. The project comprises:- a strategic design of the whole value chain from textile waste collection, until the new marketable feedstock for chemical & textile industrie, by w ...
Read Project

 21

 FINISHED 

Strategic Dialogue on Sustainable Raw Materials for Europe (STRADE)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

STRADE addresses the long-term security and sustainability of the European raw material supply from European and non-European countries. It will develop dialogue-based, innovative policy recommendations for a European strategy on future raw-material supplies.STRADE will initially concentrate on the industry perspective. Based on an analysis of the European mineral raw-material mining sector’s comp ...
Read Project

 7

 FINISHED 
NEXTRUST objective is to increase efficiency and sustainability in logistics by developing interconnected trusted collaborative networks along the entire supply chain. These trusted networks, built horizontally and vertically, will fully integrate shippers, LSPs and intermodal operators as equal partners. To reach a high level of sustainability, we will not only bundle freight volumes, but shift t ...
Read Project

 31

 FINISHED 
Nanocomposites are promising for many sectors, as they can make polymers stronger, less water and gas permeable, tune surface properties, add functionalities such as antimicrobial effects. In spite of intensive research activities, significant efforts are still needed to deploy the full potential of nanotechnology in the industry. The main challenge is still obtaining a proper nanostructuring of t ...
Read Project

 15

 FINISHED 

Electrification of public transport in cities (ELIPTIC)

Start date: Jun 1, 2015, End date: May 31, 2018,

The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars:• Safe integratio ...
Read Project

 34

 FINISHED 

European Bus System of the Future 2 (EBSF_2)

Start date: May 1, 2015, End date: Apr 30, 2018,

"The objective of the EBSF_2 project is to validate different innovative solutions that combine efficiency of the bus system with more attractiveness. Such solutions are meant to represent the most innovative in the areas indicated by the Call: the project will proceed to their final validation before their introduction in the market, avoiding pure simulations or large use of prototypes. Following ...
Read Project

 43

 FINISHED 
FLOW sees a need for a paradigm shift wherein non-motorised transport (often seen from a transport policy perspective simply as a nice “extra”) is placed on an equal footing with motorised modes with regard to urban congestion. To do this, FLOW will create a link between (currently poorly-connected) walking and cycling and congestion by developing a user-friendly methodology for evaluating the abi ...
Read Project

 16

 FINISHED 

Energy Local Storage Advanced system (ELSA) (ELSA)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

Integration of distributed small/medium size storage systems can allow operating distribution grids much more flexibly, thus realizing smart grid features like local demand-supply balancing, congestion relief, peak shaving and effective RES integration. However, few technologically mature decentralized storage systems are commercially available today at affordable prices, while both viable busines ...
Read Project

 10

 FINISHED 

Recognising Energy Efficiency Value in Residential Buildings (REVALUE)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

ReValue aims to lead the development of appraisal norms and standards that REcorgnise Energy Efficiency Value in social and private residential real estate. Financing decisions in real estate are often based on formal appraisals of value. Current norms on valuation, such as RICS', recognise Energy Effiency (EE) as a potential source of value, but do not require taking this into account in appraisa ...
Read Project

 6

 FINISHED 

Quality Assurance for Essential Climate Variables (QA4ECV)

Start date: Sep 27, 2013, End date: Jan 1, 2018,

Policy makers are increasingly relying on Earth Observation (EO) data to make decisions on mitigating and adapting to climate change. These decisions need to be 'evidence-based' and this requires complete confidence in EO-derived products. Although EO data is plentiful, it is rare to have reliable, traceable and understandable quality information. The situation is often further confused because va ...
Read Project

 19

 FINISHED 
The HIGHROC (“HIGH spatial and temporal Resolution Ocean Colour”) project will carry out the R&D necessary for the next generation coastal water products and services from ocean colour space-borne data, giving an order of magnitude improvement in both spatial and temporal resolution and thereby opening up new applications and strengthening existing ones. This responds to SPA.2013 topic 1.1-06 “sti ...
Read Project

 7

 FINISHED 

The Value Chain from Microalgae to PUFA (PUFAChain)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The overall goal of the project is to develop a robust scientific and technological basis for substan-tiating strategic and technical decisions for the industrial development of high-value products from algae. This shall contribute to develop this new and sustainable resource for market. The concept of the proposal is strictly oriented to the value chain of microalgae. Starting at the very end of ...
Read Project

 9

 FINISHED 
The proposal is aimed at contribution to current reform of Ukrainian system of QA in higher education. The consortium plans to solve the following problems and needs that are crucial for the partner country both at national and institutional levels:-Need in tools ensuring effective functioning of internal and external QA systems-Need in capacity building of HEIs and national QA body through traini ...
Read Project

 18

 FINISHED 
...e sectors. Project Activities: Over the project lifecycle the partnership will undertake numerous tasks in pursuit of the ultimate VET-Safety goal. These include for example: • VET-Industry consultations • Meeting presentations • WAH training techniques analysis • WAH competency developments • WAH incident evaluations • Project dissemination on many levels across numerous sectors • International c ...
Read Project

 12

 FINISHED 
The vocational training at the dual vocational college (Duales Berufskolleg) incorporates a job placement of several weeks or months. The trainees in the Ortenaukreis, as well as the training companies, the zweiteSchule gemeinnützige Gesellschaft (a non-profit organization), and the Kaufmännische Schulen Lahr work closely together for the mobility project. Local companies have been sending their t ...
Read Project

 14

 FINISHED 
Boarders of European Union are quickly expanding and the development of skills for our European workers becomes essential nowadays. Indeed, crafts and companies are now dealing with international exchanges and facing a multinational competition. Qualifications and skills are therefore put into question. In order to contribute to this expansion, it is primordial to provide each apprentice with the ...
Read Project

 34

 FINISHED 
The Robert-Schuman-Institut Eupen is sending in the next year about 26 students into 5 European partner countries to 7 partners. During this period the Robert-Schuman-Institut is also receiving organization for the students of our partners. It's a mutual exchange.The students do a 3 weeks practical training abroad in a company, institution, organization or specific school to do their first experie ...
Read Project

 9

 FINISHED 
The Robert-Schuman-Institut Eupen is sending in the next 2 years about 60 students into 5 European partner countries. During this period the Robert-Schuman-Institut is also receiving organization for the students of our partners. It's a mutual exchange. The students do a 3 weeks practical training abroad in a company, institution, organization or specific school to do their first experiences in th ...
Read Project

 8

 FINISHED 

Mobility Makes Us Professionals II

Start date: Jun 1, 2015, End date: May 31, 2017,

According to current mobility project, 93 students and 27 employees from Pärnumaa Kutsehariduskeskus will participate. Students will make an apprenticeship period at foreign companies or at school workshop and employees will practise or job-shadow the colleagues at partner organizations. The participants of current project are carefully chosen according to each one individuaal training needs. Acti ...
Read Project

 25

 FINISHED 

Tredu MOVE - Mobility for Vocational Education

Start date: Jun 1, 2015, End date: May 31, 2017,

Tampere Vocational College Tredu wants to develop it’s activities as a local vocational body in accordance with the strategy of City of Tampere. Tredu will carry out Tredu MOVE –Mobility for Vocational Education mobility project in all it’s sectors in youth and adult education, apprenticeship training, among those newly qualified, staff and administration in cooperation with project partners in 15 ...
Read Project

 51

 FINISHED 

Cultural Behavior in Europe

Start date: Jun 1, 2015, End date: May 31, 2017,

International work based learning for students and and staff as well as making our staff more international are the strategic themes of our international activities. Our target is to make students, teachers, staff, schools and working life more international. We need to keep the amount of students’ exchange in same level and add the possibilities for staff. Every participant will develop their lan ...
Read Project

 19

 FINISHED 
Background Success in higher education is vital for jobs, social justice and economic growth and therefore highly qualified professionals are indispensable for each society. As one of its headline targets, the European Union proposes to lead at least 40% of the younger generation to a third level education. Additionally, it claims to reduce the number of dropouts in higher education. Despite vario ...
Read Project

 7

 FINISHED 
...ser partners from the agriculture, aquaculture and bio-energy sector will take part in the project together with three RTD partners, Teknologisk Institutt (NO), University of Liverpool (UK) and aqua consult Ingenieur (DE), who will be performing the BiFFiO RTD work.
Read Project

 13

 FINISHED 
Description User InterACTION Aware Content Generation and Distribution for Next Generation Social TeleVisionACTION-TV proposes an innovative mode of user interaction for broadcasting to relax the rigid and passive nature of present broadcasting ecosystems. It has two key aims: (i) a group of users can take part in TV shows providing a sen ...
Read Project

 6

 FINISHED 

Rational Bioactive Materials Design for Tissue Regeneration (BIODESIGN)

Start date: Jan 1, 2012, End date: Dec 31, 2016,

The development of functional materials for tissue regeneration is today mostly based on perceived and limited design criteria often using a single point approach with lengthy animal trials. The outcome after in-vitro and in-vivo evaluation is often disappointing resulting in a tedious iteration process. The main objective of this project is to achieve radical innovations in state-of-the-art bioma ...
Read Project

 21

 FINISHED 
SAFEWATER will develop an affordable global generic solution for the detection and management of drinking water crises resulting from CBRN contamination. SAFEWATER addresses the key drinking water incident management challenges at large, and in particular, the current shortcomings related to the contamination of water networks by CBRN agents - the lack of effective detection capacities, contaminat ...
Read Project

 11

 FINISHED 

Air Quality Information Services (AQUISS)

Start date: Jun 1, 2016, End date: Nov 30, 2016,

Over 70% of the European population lives in cities and this percentage grows over time. Air pollution is a threat to health and many cities do not satisfy regulatory requirements of sufficiently clean air. Air quality (AQ) forecasts with high spatial resolution usable at city level are an important component to cope with this global challenge. Today such forecasts are only available using expensi ...
Read Project

 1