Fishfriendly Innovative Technologies for Hydropowe.. (FIThydro)
Fishfriendly Innovative Technologies for Hydropower
(FIThydro)
Start date: Nov 1, 2016,
End date: Oct 31, 2020
PROJECT
FINISHED
FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The facilities for upstream and downstream migration are evaluated, different bypass systems including their use as habitats and the influence of sediment on habitat. In addition existing tools and devices will be enhanced during the project and will be used in the experimental set-ups in the laboratories and at the test sites for e.g. detection of fish or prediction of behavior. This includes sensor fish, different solutions for migration as e.g. trash rack variations, different fish tracking systems, but also numerical models as habitat and population model or virtual fish swimming path model. Therefore a three-level-based workplan was created with preparatory desk work at the beginning to analyze shortcomings and potential in environment-friendly hydropower. Following the experimental tests will be conducted at the different test sites to demonstrate and evaluate the effects of the different options not covered by the desk-work. Thirdly, these results are fed into a risk based Decision Support System (DSS) which is developed for planning, commissioning and operating of HPPs. It is meant to enable operators to fulfill the requirements of cost-effective production and at the same time meet the environmental obligations and targets under European legislation and achieve a self-sustained fish population.
Get Access to the 1st Network for European Cooperation
Log In