Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

IN SITU ACT

Start date: Nov 1, 2016, End date: Oct 31, 2020,

Art Context TerritoryThe IN SITU ACT project is a tool for structuring artistic creation in public space across Europe. Art in public space is a developing discipline which mixes performance, visual and digital arts, creators and local people, artists and audience. It is an artform built around sharing, where involvement is part of the creative act; a contemporary, contextual artform for a broad ...
Read Project

 18

 FINISHED 

CLean INland SHipping (LIFE CLINSH)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

Background Inland Waterway Transport (IWT) causes considerable emissions of the air pollutants NOx and PM10. Many European regions are struggling to tackle air quality problems, though the often expensive measures implemented to meet air quality limit values are mainly directed at industry and road transport. However, it is increasingly recognised that in ...
Read Project

 17

 FINISHED 
"NanoPack will demonstrate a solution for extending food shelf life by using novel smart antimicrobial surfaces, applied in active food packaging products. It will run pilot lines in operational industrial environments to manufacture commercially feasible antimicrobial polymer films, accepted by consumers. It will minimize the amount of preservatives required to maintain freshness, add value and a ...
Read Project

 19

 FINISHED 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Read Project

 20

 FINISHED 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Read Project

 35

 FINISHED 
BRIDGES (Bringing together Research and Industry for the Development of Glider Environmental Services) will provide a necessary tool for further understanding, improved monitoring, and responsible exploitation of the marine environment while assuring its long-term preservation. This new tool, a robust, cost-effective, re-locatable, versatile and easily-deployed ocean glider, will support autonomo ...
Read Project

 21

 FINISHED 

Intelligent Assessment of Pharmaceutical in the Environment (IPIE)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Active pharmaceutical ingredients (APIs) can be released to the natural environment during the manufacturing process, following use by patients or when unused medicines are disposed of. As APIs are biologically active compounds concerns have been raised about the potential effects of APIs in the environment on human and environmental health. Over the past 15 years, a substantial amount of work has ...
Read Project

 29

 FINISHED 

Be SpectACTive!

Start date: Dec 1, 2014, End date: Nov 30, 2018,

BeSpectACTive! is an action-research and production-based project focused on the contemporary performing arts. It aims to develop new models of co-creation involving artists, audiences and cultural organizations on an equal footing. The project will facilitate the development of sustainable creative relationships between artists, audiences and organizations at both a local and transnational level ...
Read Project

 13

 FINISHED 
Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Read Project

 30

 FINISHED 

YOULEARN!

Start date: Sep 5, 2016, End date: Sep 4, 2018,

As School strongly rooted in the context of membership, but at the same time the bearer of uniqueness / special national character, the institute B. Lotti has always expressed well and met the training needs of the territory, ensuring, for much of the twentieth century, training technicians highly specialized in the field of mining at first and then also the chemical, with marketability of the tit ...
Read Project

 24

 FINISHED 

Ervaringen veraf, Leren dichtbij

Start date: Jun 1, 2016, End date: May 31, 2018,

The application ' Experiences far away, learning close ' of ROC Arcus college in Heerlen the Netherlands appeals to goals for students and professionals. This to experience influences from abroad that enriches learning not alone as a human being but also as a professional. This will lead to dept of knowledge and improvement.Objectives of the project are:-Study success as overall objective. Aim: to ...
Read Project

 9

 FINISHED 

Accueil Relation COMmerce Vente de l'Académie de Lyon

Start date: Jun 1, 2016, End date: May 31, 2018,

The consortium presented here has for objective to contribute to the updating and upgrading of the professional skills of all the participants. The main theme chosen for this project is to “deal with customers’ and clients’ greeting procedures”. The targeted public is students in Bac Pro in sales professions (Retail studies, Reception, Sales and trade). We want to give them an International experi ...
Read Project

 33

 FINISHED 

PRACTICUM DEPO 2016

Start date: Jun 1, 2016, End date: May 31, 2018,

The Pontevedra Provincial Council does not hesitate when it comes to promoting measures that develop employment and entrepreneurship, through the broadcasting of job placement programmes. Nevertheless, we find unmotivated young people, with difficulty in accessing the labour market, with little or no knowledge of a second language, with little knowledge of and experience in ICT and whose concerns ...
Read Project

 42

 FINISHED 
The goal of the InForMed project is to establish an integrated pilot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips Innovation Services, which will be qualified for small/medium-scale production of medical devices. The pilot facility will be ...
Read Project

 40

 FINISHED 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Start date: May 1, 2014, End date: Apr 30, 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Read Project

 72

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

INtegrated TOol chain for model-based design of CPSs (INTO-CPS)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

The aim of the INTO-CPS project is to create an integrated tool chain for comprehensive model-based design of Cyber-Physical Systems (CPSs). The tool chain will support the multidisciplinary, collaborative modelling of CPSs from requirements, through design, down to realisation in hardware and software. This will enable traceability at all stages of the development.INTO-CPS will support the holist ...
Read Project

 12

 FINISHED 
Innovation is at the heart of Europe’s growth strategy. However, Europe lags behind its international competitors in converting investment in Public Research Organisation PRO research into commercial returns via innovation. The solution lies in improving the transfer of technology from PROs to industry but there are many barriers to effective technology transfer, including: Most Technology Transfe ...
Read Project

 9

 FINISHED 
"The concept of the proposed project lies in the development of lightweight and flexible protective clothing, incorporating smart functionalities and designated for law enforcement authorities.Up to now, research on the protective gear of this group concentrated on the ballistic properties of the body armour. However, in spite of the improvements, modern body armours still have some of the same dr ...
Read Project

 10

 FINISHED 

“E.T.HO.S.” – Empowerment in the Tourism and Hospitality Sector

Start date: Jun 1, 2015, End date: May 31, 2017,

The project ETHOS is a ERASMUS + KA1 mobility project which offers Mobility actions to VET learners. The mobility of VET learners is aimed at recent graduates from VET schools aged between 18 and 28 years old (the participants will undertake their training placement abroad within one year of their graduation) and they will realize a VET training abroad in the general vocational field in the projec ...
Read Project

 56

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Start date: May 1, 2013, End date: Apr 30, 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Read Project

 27

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Entrepreneurship: a gateway to a growing education

Start date: Dec 1, 2015, End date: Nov 30, 2016,

The ENGAGED (Entrepreneurship: a gateway to a growing education) project involves the collaboration among IIS Scalcerle, other schools in the area, Xena for competence monitoring, City Hall and the Province of Padova, Fòrema from Confindustria. The partners are in 9 European countries.With some there is a situation of reciprocity, both in the Mobility and other LLP programs; the foreign network ...
Read Project

 26

 FINISHED 
The project SKILL JOB MATCH PLUS is a ERASMUS + KA1 mobility project that comprise VET learners mobility and also VET STAFF mobility. The mobility of VET learners is aimed at recent graduates from VET schools aged between 18 and 28 years old (the participants will undertake their training placement abroad within one year of their graduation) and they will realize a VET training abroad in the follo ...
Read Project

 67

 FINISHED 

Let's Go! Mobilità Trasnazionali e Formative per i Giovani

Start date: Nov 1, 2014, End date: Oct 31, 2016,

The project Let's Go inserts in the wide context of the objectives of Europe 2020 with the aim of integrating policies for education and training in the Strategy, the mandate that the European Union has given to all operators in the sector. Two key aspects of the Strategy: 1) the promotion of a "sustainable, smart and inclusive" economic growth; 2) the reduction of early dropout in charge of young ...
Read Project

 38

 FINISHED 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Read Project

 18

 FINISHED 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Read Project

 13

 FINISHED 
ERASMUS PLUS Key Action 1: Learning Mobility of Individuals MOBILITY PROJECT FOR VET LEARNERS AND STAFF ” HOTEL@WBL-VET . WORK BASED LEARNING ( WBL) IN VOCATIONAL TRAINING FOR CATERING AND HOTEL MANAGEMENT The mobility project referring Key Action 1- Learning Mobility of individuals-mobility project for VET learners and staff” HOTEL@WBL-VET . WORK BASED LEARNING ( WBL) IN VOCATIONAL TRAIN ...
Read Project

 55

 FINISHED 
PETROBOT will open the oil-, gas and petrochemical markets by developing two key new robot inspection technologies and validating these in use cases:1. Off-line internal inspection of pressure vessels: avoiding the high cost for human entry as well as reducing plant down-time.2.In-line inspection of storage tanks: avoiding lost revenue by keeping tanks in full operation.Currently, inspections are ...
Read Project

 10

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
ecoDriver addresses the need to consider the human element when encouraging "green" driving, since driver behaviour is a critical element in energy efficiency. The focus of the project is on technology working with the driver. The project aims to deliver the most effective feedback to drivers on green driving by optimising the driver-powertrain-environment feedback loop. It will carry out a substa ...
Read Project

 16

 FINISHED 
European IC manufacturers are on the way to become suppliers of customized products for OEM companies, which means high flexibility and product diversity. The project aims at conducting research to support the development of new manufacturing procedures, new organizations and new information and control tools to enable IC production lines to efficiently manage a high product and technology mix and ...
Read Project

 29

 FINISHED 

Providing Active Skills for Tourism

Start date: Nov 1, 2014, End date: Oct 31, 2015,

In the context of the global economic crisis and of the employment crisis, the tourism sector is one of the few areas showing a countertrend. The most recent data (European Commission) indicate that the tourism industry in Europe shows an increase of 5% in the first half of 2013, confirming Italy in second place among the most visited countries. In our country, the sector provides employment to 11 ...
Read Project

 21

 FINISHED 
PHAEDRUS addresses the complete scope and objectives of Topic SP1-JTI-FCH.2011.1.8. A new concept and new technologies for a hydrogen retail refuelling system are developed.The major objective is to develop and validate a new concept for 70 MPa hydrogen refuelling retail stations by showing the applicability of electrochemical hydrogen compression technology in combination with a PEM electrolyser, ...
Read Project

 10

 FINISHED 

Open MIC for Young Entrepreneurs, Erasmus+

Start date: May 1, 2015, End date: Sep 30, 2015,

'Open MIC for Young Entrepreneurs, Erasmus+' 19th-26th of July, 2015 (County Wicklow/ Dublin City) Having formal education in current labour market doesn't guaranty employment. People require to have a full set of social skills and creative approach to stand a chance of getting fulfilling employment position or/and to take on rewording ...
Read Project

 13

 FINISHED 
RationaleThe inability of pre-clinical studies to predict clinical efficacy is a major bottleneck in drug development. In severe asthma this bottleneck results from: a lack of useful and validated biomarkers, underperforming pre-clinical models, inadequate and incomplete sub-phenotyping, and insufficient disease understanding.HypothesisThe use of biomarker profiles comprised of various types of hi ...
Read Project

 42

 FINISHED 
Description EURECA (Enabling information re-Use by linking clinical REsearch and Care) aims to enable seamless, secure, scalable and consistent linkage of healthcare information, which resides in electronic health record (EHR) systems with information in clinical research information systems, such as clinical trials. Achieving semantic inter ...
Read Project

 20

 FINISHED 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Start date: May 1, 2011, End date: Apr 30, 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Read Project

 33

 FINISHED 
Recent pharmacovigilance (PV) issues have led to questions regarding the ability of the current PV system to meet the global needs. Controversies around the assessment of spontaneous reports and conflicting results from pharmacoepidemiology studies may lead to delay in, or inappropriate, regulatory decisions. The PROTECT consortium, consisting of 20 core partners lead by the European Medicines Age ...
Read Project

 36