Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Master in Work, Organizational and Personnel Psychology

Start date: Sep 19, 2016, End date: Sep 18, 2021,

The Erasmus Mundus Joint Master Degree (EMJMD) on Work, Organizational, and Personnel Psychology (WOP-P) is a 120 ECTS Master course that aims to provide excellent experts in WOP-P for an increasingly globalized socio-economic context. It is implemented by an International Consortium. European partner institutions are: University of Valencia (Coordinating Institution), University of Bologna; Unive...
Read Project

 10

 FINISHED 
The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Read Project

 37

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
The proposed project “Readiness of ICOS for Necessities of integrated Global Observations” (RINGO) aims to further development of ICOS RI and ICOS ERIC and foster its sustainability. The challenges are to further develop the readiness of ICOS RI along five principal objectives: 1. Scientific readiness. To support the further consolidation of the observational networks and enhance their quality. Th...
Read Project

 26

 FINISHED 
HEMPT-NG addresses the topic COMPET-3-2016-a on Incremental Technologies part of the SRC electrical propulsion in line with the EPIC roadmap “to increase the competitiveness of EP systems developed in Europe” by developing an integrated solution based on HEMPT (Highly Efficient Multistage Plasma Thruster) , the fluidic management system, and the power processing unit.The proposed development will ...
Read Project

 10

 FINISHED 

Gridded Ion Engine Standardised Electric Propulsion Platforms (GIESEPP)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The consortium proposes an innovative activity to develop, build and test to TRL5 the first European Plug and Play Gridded Ion Engine Standardised Electric Propulsion Platform (GIESEPP) to operate Airbus Safran Launchers and QinetiQ Space ion engines. These are the only European ion engines in the 200-700W (LEO) and 5kW (GEO) domains that are space-proven, and the consortium’s intention will be to...
Read Project

 8

 FINISHED 

Precision Additive Metal Manufacturing (PAM^2)

Start date: Dec 1, 2016, End date: Nov 30, 2020,

Additive Manufacturing (AM) is a fast−growing sector with the ability to evoke a revolution in manufacturing due to its almost unlimited design freedom and its capability to produce personalised parts locally and with efficient material use. AM companies however still face technological challenges such as limited precision due to shrinkage and build−in stresses and limited process stability and ro...
Read Project

 10

 FINISHED 
Around 461 million ton/year of C&DW are generated in EU28. Recent studies on the characterization of C&DW samples at European level revealed a predominant fraction of concrete (52% average). Over the last years, novel technology has been developed aiming to guarantee high quality recycled concrete aggregates for use in new concrete, thereby closing the concrete loop. The most advanced concrete re...
Read Project

 15

 FINISHED 
Global trends in population growth and rising economic prosperity will increase the demand for energy, food and water, with more severe impact in fast-growing economies, such as in several African countries. The constraints on water, energy, and food could well hamper economic development, lead to social and geopolitical tensions, and cause lasting environmental damage. DAFNE advocates an integrat...
Read Project

 13

 FINISHED 

MOnitoring ozone injury for seTTing new critical LEvelS (LIFE MOTTLES)

Start date: Jul 1, 2016, End date: Jun 30, 2020,

Background Climate change and air pollution are interlinked, representing a challenge for the management of European forests, with ozone (O3) being the most phytotoxic air pollutant for trees. European standards for the protection of ecosystems, including forests, have been defined through experiments carried out under controlled conditions. Yet, resear...
Read Project

 5

 FINISHED 
STAR BIOS 2 (Structural Transformation to Attain Responsible BIOSciences),coordinated by the University of Tor Vergata (IT), has been designed to respond to the Topic ISSI 5 (Workprogramme Science With And For Society). The general aim of project is that of contributing to the advancement of the Responsible Research and Innovation (RRI) strategy, which underpins Horizon 2020, by promoting 6 Action...
Read Project

 12

 FINISHED 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Start date: Nov 1, 2016, End date: Apr 30, 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the...
Read Project

 14

 FINISHED 
INTCATCH will instigate a paradigm shift in the monitoring and management of surface water quality that is fit for global waters in the period 2020-2050. INTCATCH will do this by developing efficient, user-friendly water monitoring strategies and systems based on innovative technologies that will provide real time data for important parameters, moving towards SMART Rivers. The business model will...
Read Project

 23

 FINISHED 
The ACHIEVE Consortium will bring together their world-leading expertise in the design and manufacturing of electrical machines for aircraft Advanced Generation Systems (AGS), integrated Power Electronics (PE), advanced control systems and intelligent thermal management, to develop an innovative advanced mechatronic device for electrical power management system of Turboprop. The ACHIEVE Consortiu...
Read Project

 3

 FINISHED 
RISCAPE will provide systematic, focused, high quality, comprehensive, consistent and peer-reviewed international landscape analysis report on the position and complementarities of the major European research infrastructures in the international research infrastructure landscape. To achieve this, RISCAPE will establish a close links with a stakeholder panel representing the main user groups of the...
Read Project

 12

 FINISHED 
The MIRPHAB (Mid InfraRed PHotonics devices fABrication for chemical sensing and spectroscopic applications) consortium will establish a pilot line to serve the growing needs of European industry in the field of analytical micro-sensors. Its main objectives are to:• provide a reliable supply of mid-infrared (MIR) photonic components for companies incl. in particular SMEs already active in analytic...
Read Project

 19

 FINISHED 
AQUARIUS proposes disruptive improvements in laser based water sensing employing MIR quantum cascade lasers (QCLs). It is motivated byi) the EC Water Framework Directive (2000/60/EC) where hydrocarbons are identified as priority hazardous substances,ii) the industrial and regulatory need for fast and continuous detection of contaminants and iii) the current state-of-the-art of measuring these subs...
Read Project

 9

 FINISHED 
DANUBIUS-PP is a three-year project to raise DANUBIUS-RI (International Centre for Advanced Studies on River-Sea Systems) to the legal, financial and technical maturity required for successful implementation and development. DANUBIUS-RI is a pan-European distributed research infrastructure (RI) building on existing expertise to support interdisciplinary research on river-sea (RS) systems, spanning...
Read Project

 29

 FINISHED 
sustainablySMART will make a change to the life cycle of mobile information and communication devices by developing new product design approaches (including enhanced end-of-life performance, re-use and re-manufacturing aspects; i.e. implementing “Design for a Circular Economy”) for smartphones and tablet computers on the product and printed circuit board level, and by new re-/de-manufacturing proc...
Read Project

 17

 FINISHED 
Pervasive and on-line water quality monitoring data is critical for detecting environmental pollution. However, it’s not easy to gather such data, at least not for all contaminants. Currently, water utilities rely heavily on frequent sampling and laboratory analysis in order to acquire this information.For this situation to be improved, portable and high-performance devices for pervasive water qua...
Read Project

 9

 FINISHED 
Objective The main objective of the International Master in Quaternary and Prehistory is to train young researchers in the fields of prehistory, paleo-anthropology, palaeontology, methods and techniques for prehistoric and archaeological research, quaternary’s geology and heritage preservation.Course duration Two years (120 ECTS)Brief DescriptionThe International Master in Quaternary and Prehistor...
Read Project

 6

 FINISHED 
PROTON aims at improving existing knowledge on the processes of recruitment to organised crime and terrorist networks (OCTN) through an innovative integration between social and computational sciences. Moving beyond the state of the art, this integration will support evidence-based policies at the international, national and local level. To achieve its aim, PROTON will complete three specific obje...
Read Project

 20

 FINISHED 
Forest biomass is currently one of the most important source of renewable energy and accounts for almost half of the EU’s total renewable energy consumption. In addition to raw materials, forests also provide a wide range of vital non-wood services that should be protected during wood extraction. The innovation project Forwarder2020 has the main aim of improving sustainability of wood production a...
Read Project

 14

 FINISHED 

Responsible Research and Innovation in Practice (RRI-Practice)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The RRI-Practice project will bring together a unique group of international experts in RRI to understand the barriers and drivers to the successful implementation of RRI both in European and global contexts; to promote reflection on organisational structures and cultures of research conducting and research funding organisations; and to identify and support best practices to facilitate the uptake ...
Read Project

 13

 FINISHED 
The project 'STI International Cooperation Network for EaP Countries Plus (EaP PLUS)' aims to stimulate cooperation between researchers from the EaP countries and EU MS and enhance the active participation of the Eastern Partnership countries in Horizon 2020 Framework Programme.Building on the results of the predecessor FP7 project 'IncoNet EaP', the project will eliminate remaining obstacles to E...
Read Project

 18

 FINISHED 
Specific raw materials become increasingly important to manufacture high level industrial products. Especially electronic equipment contains precious metals and a series of strategic raw materials. To date the material specific recycling is focused on mass stream concepts such as shredder processes and metallurgy to extract the high-value metallic constituents, i.e. copper, gold, silver. However, ...
Read Project

 10

 FINISHED 

European E-Infrastructure Services Gateway (eInfraCentral)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

EInfraCentral's mission is to ensure that by 2020 a broader/ more varied set of users (including industry) benefits from European infrastructures. A common approach to defining and monitoring e-infrastructures services will increase their uptake. It will also enhance understanding of where improvement can be made in delivering services. The challenge is to shift towards an e-Infrastructure ''mark...
Read Project

 9

 FINISHED 

Competitive SolAr Power Towers – CAPTure (CAPTure)

Start date: May 1, 2015, End date: Apr 30, 2019,

The main objective of this project is to significantly reduce costs of concentrated solar power, in order to pave the way for its deserved competitiveness on the power market. Specifically, the solar-to-electric conversion efficiency of the plant will be improved by increased receiver operating temperatures as well as an innovative power cycle configuration also providing advantages regarding plan...
Read Project

 16

 FINISHED 

High-Speed Experimental Fly Vehicles - International (HEXAFLY-INT)

Start date: Apr 1, 2014, End date: Mar 31, 2019,

The HEXAFLY-INT project aims to flight test an experimental vehicle above Mach 7 to verify its potential for a high aerodynamic efficiency during a free-flight while guaranteeing a large internal volume. The feasibility for a 3m long vehicle was demonstrated during the European L0 precursor project HEXAFLY. Its realization will now be enabled on an international scale underlining the need for glob...
Read Project

 11

 FINISHED 
Money underpins all terrorist activities (without money propaganda, training, recruitment, and support are less effective or null). The disruption of terrorist financing activity is a key element in any fight against terrorism.DANTE will deliver effective, efficient and automated data mining, analytics solutions and an integrated system to detect, retrieve, and analyse huge amounts of heterogeneou...
Read Project

 18

 FINISHED 
OptEEmAL aims to develop an Optimised Energy Efficient Design Platform for refurbishment at district level, which will deliver an optimised, integrated and systemic design based on an Integrated Project Delivery (IPD) approach for building and district retrofitting projects, reducing time delivery and uncertainties, resulting in improved solutions when compared to business-as-usual practices. This...
Read Project

 14

 FINISHED 

Performance-based Innovation Rewards (REWARD)

Start date: Feb 1, 2014, End date: Jan 31, 2019,

REWARD will open up new horizons in complementing the international intellectual property rights (IPR) system. The project's ambitious output is an ethically and legally sound performance-based reward mechanism for pharmaceutical innovation, which complements the existing patent regime, yet mitigates its considerable disadvantages for the global poor.The current IPR system impedes access to life-s...
Read Project

 3

 FINISHED 
Breast cancer is the most common type of cancer affecting woman in the EU. Multidisciplinary Breast Units (BUs) were introduced in order to deal efficiently with breast cancer cases, setting guideline-based quality procedures and a high standard of care. However, daily practice in the BUs is hampered by the complexity of the disease, the vast amount of patient and disease data available in the dig...
Read Project

 11

 FINISHED 

Teaching and Coaching Innovation & Entrepreneurship InnovaTively

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The project builds on an existing community linked to ISPIM Society focused on innovation and entrepreneurship (I&E) – a theme of central interest in EU as a source of employment and growth. The consortium consists of industrial partners (Nokia Networks, Lufthansa, Torbay Hospital, AachenMuenchener, BMW, Lego) and academics who share a concern with the question:How do we improve on current I&E te...
Read Project

 12

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service...
Read Project

 39

 FINISHED 
Background Lake Fertő and the swamps of Hanság have a rich fauna, including threatened species listed in Annex I of the Birds Directive. Bird species in the National Park and Natura 2000 network site include great bustard (Otis tarda) and several birds of prey; there are about 10 pairs of Saker falcon (Falco cherrug) and 6-7 pairs of Eastern imperial ea...
Read Project

 13

 FINISHED 

Transnational Cooperation among ICT NCPs (Idealist2018)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The main objective of Idealist2018 is reinforcing the network of National Contact Points (NCP) for LEIT ICT under Horizon2020, by promoting further trans-national cooperation within this network. This cooperation will also include collaboration and networking with similar networks in parallel themes (Security, ENV, Transport, Energy, Health,…etc) especially in the context of joint/coordinated or P...
Read Project

 33

 FINISHED 
Concrete is the most widely used man-made material on Earth, with an annual consumption of around 10 billion m³. However, its fabrication is characterized by total CO2 emissions amounting to around 5% of the worldwide anthropogenic GHG emissions. More sustainable cements with lower embodied energy and CO2 footprint are needed.As stated in the European Directive on Energy Performance of Buildings (...
Read Project

 14

 FINISHED 
Description (EN): THE4BEES builds on the hypothesis: Energy is consumed by people rather than by buildings. Although most of the strategies to achieve energy efficiency in buildings focus on technical mitigation measures, to reach the ambitious goals on Low Carbon set by EU and Alpine Strategy, both structural and soft approaches shall be considered in a complementary way across the...
Read Project

 13

 FINISHED 

Latin American Social Innovation Network

Start date: Oct 15, 2015, End date: Oct 14, 2018,

LASIN aims to effectively support and promote social innovation as a means to achieve sustainable and inclusive socio-economic growth, social cohesion and equity in Latin America, through intercultural, curricular and extracurricular activities. It will achieve this by establishing Social Innovation Support Units (SISU) within the Partner Countries to promote and support University-social enterpri...
Read Project

 13