Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Municipal solids waste (MSW) are collected by municipalities and represents more than 500 kg/capita (EU-27 average), 300 million tonnes overall every year in the EU-32. Currently, approximately 50% of this volume is landfilled. More than 1.3 million tonnes of Marine rest raw material (MRRM) are generated in Europe each year. Some countries, such as Norway and Denmark, have traditionally for anima...
Read Project

 17

 FINISHED 
"NanoPack will demonstrate a solution for extending food shelf life by using novel smart antimicrobial surfaces, applied in active food packaging products. It will run pilot lines in operational industrial environments to manufacture commercially feasible antimicrobial polymer films, accepted by consumers. It will minimize the amount of preservatives required to maintain freshness, add value and a...
Read Project

 19

 FINISHED 
URBANREC project aims to develop and implement an eco-innovative and integral bulky waste management system (enhancing prevention, improving logistics and allowing new waste treatments to obtain high added value recycled products) and demonstrate its effectiveness in different regions. In URBANREC project, Northern, Mediterranean, Eastern and South-eastern areas in Europe are represented by Belgiu...
Read Project

 22

 FINISHED 
The Energy Union Framework Strategy laid out on 25 February 2015 has embraced a citizens-oriented energy transition based on a low-carbon transformation of the energy system. The success of the energy transition pillar in the Energy Union will hinge upon the social acceptability of the necessary reforms and on the public engagement in conceptualizing, planning, and implementing low carbon energy t...
Read Project

 12

 FINISHED 
Waste heat is a problem common to high temperature processing industries as a significantly underused resource, often due to challenges in economic heat valorisation. Secondary aluminium recycling and ceramic processing were identified as key examples with economically recoverable waste heat. Several challenges are inherent; these processes are batch-based rather than continuous with corrosive par...
Read Project

 9

 FINISHED 
Additive Layer Manufacturing (ALM) processes can significantly contribute to the demanding task within the Strategic Research and Innovation Agenda (SRIA) to reduce the impact of aviation on the environment. The unique manufacturing process of ALM technologies promises great weight saving potential, due to the possibility to produce bionically optimized lightweight structures of high complexity in...
Read Project

 10

 FINISHED 

Using Profiling and Publishing for the upping of Scientific Approaches

Start date: Oct 1, 2016, End date: Mar 31, 2019,

UPPScience falls squarely within EU strategies for fostering research, better quality education and a stronger European Research Area. It will build on a Community of Practice (CoP) for managers, teachers and trainers of STEM and IT subjects in Vocational Education and Training (VET) that has been successfully initiated in a previous Erasmus+ KA2 Strategic Partnership for VET called VISConti. UP...
Read Project

 22

 FINISHED 

PRODEST Promoting Youth Entrepreneurship with Digital Storytelling

Start date: Sep 1, 2016, End date: Dec 31, 2018,

Entrepreneurship is recognized as a powerful driver of economic growth and job creation: it creates new companies and jobs, opens up new markets, and nurtures new skills and capabilities. One of the main recommendations (Action Pillars) by the EU Commission Entrepreneurship 2020 Action Plan (2012) is to promote entrepreneurial education and training, however, the uptake and the effectiveness of en...
Read Project

 5

 FINISHED 

Play for Inclusion

Start date: Nov 1, 2016, End date: Oct 31, 2018,

A. CONTEXTWhite economy sector is becoming central in the cultural and economic dynamics of the world. Working in a socially inclusive world means to give the opportunity to all to be equally citizens. It is estimated that White Economy in Italy has an economic value 290 billions (CENSIS) with 3.8 million employees. It refers to services, products, technologies and professionals for the care and p...
Read Project

 21

 FINISHED 

TURISTI non PER CASO

Start date: Nov 1, 2016, End date: Oct 31, 2018,

A. CONTEXT The Italian accommodation offer is leader in Europe for quality and dimension. Tourism sector has always been and it is still a solid engine for economic recovery of European Union. It is important, in period of economic crisis, to invest in the education and training of young people who want to work in tourism sector. In order to increase sector competitiveness, is it essential to ensu...
Read Project

 26

 FINISHED 

Audiovisu@ls

Start date: Nov 1, 2016, End date: Oct 31, 2018,

A. CONTEXTAudiovisuals market, belong traditional sectors, is booming in Europe and world wide, thanks to flourishing of integrated market “Online Audiovisuals”, which match 4 publishing markets: television, internet, smartphone apps, home video.Sector enterprises are always looking for increasingly competent staff, able to compete with international scope productions.Training offered by the proje...
Read Project

 23

 FINISHED 

Power Generation

Start date: Nov 1, 2016, End date: Oct 31, 2018,

A. CONTEXTEnvironmental sustainability, efficient use of energy resources and renewable energies are European priorities (European Strategy 2020).EC – DG Employment, Social Affaires and Inclusion states that more than 20 million workers in Europe are engaged in activities connected to environmental sustainability; moreover, the request of Green Jobs will increase.The project contributes to this tr...
Read Project

 21

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the...
Read Project

 38

 FINISHED 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Start date: Nov 1, 2015, End date: Oct 31, 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c...
Read Project

 23

 FINISHED 

Diversitatea inter-culturala - un model de integrare

Start date: Oct 3, 2016, End date: Oct 2, 2018,

The project aims to generate, develop, operate and transfer innovative practices in education informal / formal for adults with disabilities, by pooling the experience / expertise of strategic partnership, an exchange of experience at European level.PROJECT OBJECTIVES1. To facilitate direct access to education (informal, non-formal) and personal development through art and dance for 90 people with...
Read Project

 3

 FINISHED 
The PROGRESSIVE project will provide a dynamic and sustainable framework for standards and standardisation around ICT for AHA. The project is pan-European but also draw on wider international experience – especially in the contexts of interoperability and standards harmonisation.As attitudes towards ageing change there is recognition of the importance of older people’s engagement. Engagement can e...
Read Project

 10

 FINISHED 
"Why conducting a project about professionalizating stakeholders to use hemp in the building sector at European level? 1. Constructing and renovating with hemp, a growth market: The market for sustainable construction and renovation is potentially significant in Europe. It is part of the EU 2020 strategy (energy, climate) and of national policies also. The use of natural materials in construction...
Read Project

 9

 FINISHED 

We Are ONE (Altogether Better)

Start date: Sep 1, 2016, End date: Aug 31, 2018,

There is no doubt that Europe is an ethnically diverse continent, full of different minorities (even though there is not a shared definition of minority). The majority of European countries have minority populations of less than 20%, while others have more than this baseline (e.g. Belgium). However, it is important to look at how such minorities are involved in national and European mechanisms to ...
Read Project

 5

 FINISHED 
There is a notable increase of cases of people with ASD and, accordingly, higher number of adults and elderly with ASD. So, there is an urgent need of disposing professionals with enough knowledge, skills and competences to provide a quality and efficient service to these persons and their families. In this regard, IPA+ project responds to these needs to better prepare different kind of profession...
Read Project

 5

 FINISHED 

To give and to get

Start date: Sep 1, 2016, End date: Aug 31, 2018,

Project „To give and to get“ will invite 18 young people to Lithuania. They will come from Italy, Spain, Georgia, Armenia, Ukraine, France and Romainia. The project will run for 24 months – first face of volunteering will be from 2016 09 01 till 2017 07 31 (9 volunteers) and second face of volunteering will starto on 2017 09 01 and ends on 2018 07 31 (9 volunteers). Project of The Blessed J. Matul...
Read Project

 9

 FINISHED 
The world of irrigation requires innovative solutions, less water and energy dependant. UPM developed in 2013 solutions for large power photovoltaic (PV) pumping systems at TRL5 that was successfully tested in a real Irrigators Community (IC) of Alto Vinalopó (Spain). The results showed great technical reliability (solving the problem of the variability of solar energy), matching the IC irrigation...
Read Project

 13

 FINISHED 

TRAineeships IN European EnterpriseS

Start date: Jul 1, 2016, End date: Jun 30, 2018,

Engineering industry has a predominant role in all European industrialized countries, both in terms of numbers, employment, international exchange, added value and strategic value. In Basilicata Region (Southern Italy), engineering and tourist sectors have become important cornerstones of the local economy. Contributing significantly to the growth and maintenance of levels of competitiveness of th...
Read Project

 21

 FINISHED 
D.A.N.T.E. - Development of Activities of Internship for Trainees in the European Union is a mobility project addressed to 100 young VET Learners available on the labour market and resident in the Tuscany Region, who at the date of publication of the notice meet all of the following requirements: Italian or EU-28 citizens, enjoyment of all civil and political rights, status of unemployed person / ...
Read Project

 16

 FINISHED 

Safe and COnnected aUtomation in road Transport (SCOUT)

Start date: Jul 1, 2016, End date: Jun 30, 2018,

"The project "Safe and COnnected aUtomation in road Transport" (SCOUT) aims at identifying pathways for an accelerated proliferation of safe and connected high-degree automated driving in Europe, taking into account user needs and expectations, technical and non-technical gaps and risks, viable business models as well as international cooperation and competition.The analysis will start from a thor...
Read Project

 12

 FINISHED 
“E.A.S.Y LAB - Entrepreneurship And Self-emploYment by real experiences in LABour market” aims at promoting the mobility of 60 graduates from specific professional and economic sectors such as wine, food, tourism and hospitality. The participants will be selected according to their motivation, determination, linguistic skills and will have the opportunity to carry out a 4-month internship in the a...
Read Project

 14

 FINISHED 

Incipit: It begins!

Start date: Jun 1, 2016, End date: May 31, 2018,

The “Incipit: it begins!" project is aimed at all youngsters willing to get involved in a volunteer project. It will give the opportunity to 29 youngsters to get involved to various organizations and to implement diverse activities based on their personal interests and expectations regarding their long-term projects.This project is aligned with the actions leaded by ADICE for more of 15 years, giv...
Read Project

 17

 FINISHED 

Volun-tour

Start date: Aug 1, 2016, End date: May 1, 2018,

The main objective of this project is to develop a new format of international mobilities for young people, fully organized and implemented by NGOs. These mobilities will be defined from now on as “Volun-tour”: a mixture of cultural awareness tours and change-making actions organized by NGOs working on the field, with the purpose to offer quality-learning experience to international volunteers thr...
Read Project

 7

 FINISHED 

ALL WITHOUT BORDERS

Start date: Sep 1, 2016, End date: Apr 30, 2018,

All without borders is a continuation of an EVS project taking place in Lorca (2 volunteers for 1 year from Italy and Poland), where the volunteers (1 of them with fewer opportunities) will collaborate with the Youth organization Cazalla and will be involved in the activities of this organization: educational and leisure time activities based on principles of non-formal education with young people...
Read Project

 3

 FINISHED 

Youth & Media

Start date: May 1, 2016, End date: Apr 30, 2018,

EVS-volunteers will be active participants in a group of young people who are producing videos and short films on social topics. Special focus is on involvement of young people from vulnerable social groups - their active participation in public life through media. With this they have a chance to improve their own public image in media and decrease prejudices towards different. One of the goals is...
Read Project

 7

 FINISHED 

#Youth inclusion&integration

Start date: Aug 1, 2016, End date: Mar 31, 2018,

The main idea of this project is to bring back to youngsters in Kraków and Lesser Poland attitudes that are characteristic for youth: openness, spontaneity, joy, curiosity of the world - not closeness, radicalisation or fear from unknown. Thanks to this change of attitude we can contribute to preventing isolation, self-exclusion, lack of trust and rejection of diversity.Aims of this project, invol...
Read Project

 3

 FINISHED 

Erasmus for Visually Impaired Persons

Start date: Aug 3, 2016, End date: Mar 2, 2018,

Erasmus for VIPs is an EVS project which will involve 24 EVS volunteers from Greece, Spain, Italy and Turkey who will carry out activities in favour of visually impaired young people (VIPS). The project will take place in Arad, Romania and it is composed of 3 mobilities:-1st mobility: 1st November 2016 – 28th February 2017-2nd mobility: 15th March 2017 – 12th July 2017-3rd mobility: 1st August 201...
Read Project

 5

 FINISHED 

Ethik Mind

Start date: Jun 1, 2016, End date: Feb 28, 2018,

The project take part in 2 hosting organisations, wich both are sensitive about sustainable development and ethics. The place of the volunteers is important in projects, they are part of the team providing a special atmosphere thanks to their youth, culture and knowledge.This EVS project will give the opportunity to for ten youngster to be a long term volunteers during the period of July 2016 to ...
Read Project

 11

 FINISHED 

Act Social, Think Global!

Start date: Aug 1, 2016, End date: Jan 31, 2018,

Act Social - Thik Global! is a project composed of two activities: Evs mobilities and PBA.It deals with the following main themes: volunteering and intercultural learning in social and educational contexts. Its goal is focused both on the volunteers and the youth workers involved.The EVS volunteers will develop new competences in social and educational field e they’ll get new tools to work with ta...
Read Project

 20

 FINISHED 

Dare to care

Start date: Aug 1, 2016, End date: Jan 31, 2018,

Project "Dare to care" was initiated to empower young people from all over Europe to take an action in the sphere of society life they care for – children at risk, environment, promoting reading culture in society, non-formal, inter-cultural learning. By acting upon the cause they care the most, volunteers will increase their awareness about the phenomena and improve skills necessary to be effecti...
Read Project

 16

 FINISHED 

EVS connects one Europe in Tirol 2016

Start date: May 1, 2016, End date: Jan 31, 2018,

"EVS connects one Europe in Tirol 2016" is a youth mobility project for 14 long-term volunteers and takes place in the region Tyrol in Austria. The project is motivated and organised by InfoEck of Verein Generationen und Gesellschaft and its partner network of hosting organisations, supported by very professional sending partners. InfoEck has collected precious EVS experience during the last years...
Read Project

 24

 FINISHED 
Two FP7 European projects ELECTRICAL and SARISTU aim to develop methods to manufacture CNT reinforced multifunctional composites compatible with current industrial manufacturing processes. According to the results, three CNT integration strategies appear as promising methods to be driven towards an industrial scale manufacturing process: buckypapers, CNTtreated prepreg and CNT doped nonwoven veils...
Read Project

 13

 FINISHED 

(Net)Working on European citizenship education

Start date: Oct 3, 2016, End date: Jan 2, 2018,

The project submitted is a continuation of the first steps that have been initiated by eight partners from Europe and Russia in the field of non-formal learning and citizenship education since 2011. The project coNnEcT (Coperation Network in Non-Formal Education and Citizenship Training) aims to empower eight educational organizations to develop and implement educational cross-national projects fo...
Read Project

 8

 FINISHED 

VOLUNTECA

Start date: Jul 1, 2016, End date: Dec 31, 2017,

Volunteca is aimed to be an innovative EVS stage meant to develop a range of activities of the host organisation that can benefit the youth community. At the same time, the project will offer valuable learning opportunities as well as key opportunities for the personal and professional development of the two volunteers involved in the project, who come from Spain and France respectively.The main t...
Read Project

 3

 FINISHED 

It's EVS Time

Start date: Aug 1, 2016, End date: Dec 31, 2017,

VARVARA Y MARINA EN EL CENTRO PRINCIPIAPrincipia is an interactive science center which is characterized by promoting scientific and technological dissemination to a wide public in a pleasant, practical and attractive way, always maintaining accuracy in contents. It is interactive because there is a manipulation of objects that forces the visitor to think, reflect and experience, encouraging him t...
Read Project

 7

 FINISHED 

EVS NOW

Start date: Aug 1, 2016, End date: Dec 31, 2017,

HELOISE, MAARJA AND IRYNA IN STA MARIA DE LOS ANGELESThe volunteer project covers three main work areas: social and cultural activities, linguistic and cultural exchange, and Erasmus + projects management. All this is based on the joint commitment with the environment and community. The framework educates the youth as participatory and creative individuals, in the broader construction of the non-v...
Read Project

 8