Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Organic solar cells (OSCs) have the potential to become an environmental friendly, inexpensive, large area and flexible photovoltaics technology. Their main advantages are low process temperatures, the potential for very low cost due to abundant materials and scalable processing, and the possibility of producing flexible devices on plastic substrates. To improve their commercialization capacity, t ...
Read Project

 11

 FINISHED 
ADAS&ME (“Adaptive ADAS to support incapacitated drivers &Mitigate Effectively risks through tailor made HMI under automation”) will develop adapted Advanced Driver Assistance Systems, that incorporate driver/rider state, situational/environmental context, and adaptive interaction to automatically transfer control between vehicle and driver/rider and thus ensure safer and more efficient road usage ...
Read Project

 30

 FINISHED 
The continuous trend towards miniaturization and multi-functionality embedded in products and processes calls for an ever increasing innovation, research and development within the European manufacturing sector. A necessary condition for the European productive sector to be at the global forefront of technology, ensuring job creation and sustainable growth, is to have access to innovative, entrepr ...
Read Project

 4

 FINISHED 
Smart factories are characterized by increasing automation and increasing customization. In these dynamic environments flexible and adaptive work organization is crucial both for productivity and work satisfaction. Factory2Fit project will support this development by developing adaptation solutions with which people with different skills, capabilities and preferences can be engaged, motivated and ...
Read Project

 9

 FINISHED 

Comparative Studies on Adult and Lifelong Learning

Start date: Sep 1, 2015, End date: Aug 31, 2018,

...ernational network of graduates in adult and lifelong learning and higher internationalization in adult and lifelong learning practice. The Strategic Partnership includes the following partners: • Technische Universität Chemnitz, Germany • Universidade de Lisboa, Portugal • Universitii di Padova, ltaly • Universita degli Studi di Firenze, ltaly • University of Aarhus, Denmark • Pecsi Tudomanyegyet ...
Read Project

 8

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
The main objective of this project is to develop and demonstrate innovative close-to-market applications, which are heavily relying on accurate and high integrity satellite navigation. To achieve the full potential of advanced satellite positioning, an integrated solution starting from low-level signal processing to high-level data fusion will be proposed to get a continuous probabilistic position ...
Read Project

 7

 FINISHED 

Educational Senior Network

Start date: Dec 1, 2014, End date: Oct 31, 2017,

The project EduSenNet is the project which focuses on the learning possibilities of the elderly over 50 on the chosen UTAs and countries with the aim to realise pedagogical research with the outcomes about formal, non-formal and informal learning of the elderly. The partners will focus on non-formal and informal learning possibilities of UTAs, evaluate them and describe links with formal educatio ...
Read Project

 7

 FINISHED 
...ject and their level of information and experience on project objectives. Hacettepe University, Ankara Public Health Provincial Directorate and Ankara Chamber of Pharmacists are partners from Turkey. TECHNISCHE UNIVERSITAET CHEMNITZ is the partner from Germany, Maastricht University is the partner from Netherlands and Uppsalla University is the partner from Sweden. Activities to achieve project ob ...
Read Project

 7

 FINISHED 

Ältere bauen mit Jüngeren Brücken für Europa

Start date: Sep 1, 2014, End date: Aug 31, 2017,

Although the EU has passed the Memorandum Lifelong Learning in 2000, we still have high youth unemployment and a lack of knowledge among pupils, younger and older adults in Europe (e.g. studies PISA (2014) , PIACC (2013 ) , CILL (2014)) . Therefore all resources especially intergenerational educational resources (e.g, professional and life experiences) must be used to satisfy those education req ...
Read Project

 4

 FINISHED 
Road transport is indispensable for the exchange of goods and persons, but at the same time has severe negative consequences, among others related to road safety and environment. In order to meet EU targets, both the number of road crashes and vehicle emission levels need to be reduced substantially. For identifying the next generation of measures that will enable us to actually reach these target ...
Read Project

 21

 FINISHED 
The aim of the present proposal is to contribute to the smart growth in the Free State Saxony as an emerging region in the European Union by increasing the efficiency and effectiveness of investments in research, development and innovation and by contributing to a better and more efficient connection of actors along the innovation chain.To achieve the above mentioned objectives the proposed projec ...
Read Project

 9

 FINISHED 
Modular interposer architecture providing scalable heat removal, power delivery and communicationCarrICool will deliver a game-changing 3D packaging platform for scale-up of future, many-core, Exascale computing systems. The project will also develop a strategic supplier base in Europe for high-end HPC components and systems integration capabilities in the Exascale era. In CarrICool, advanced More ...
Read Project

 9

 FINISHED 
"The overall objective is the development of new coatings for supercritical steam power plants for efficient and clean coal utilization. A significant reduction of emissions is expected by increasing efficiencies to ŋ > 50%. Currently, an efficiencies of 45% have been achieved in the last 30 years from subcritical 180 bar/540ºC to ultra-supercritical 300 bar/600-620ºC corresponding to a specific ...
Read Project

 14

 FINISHED 
...already successfully organised a youth mobility project called "Promotion of European Union qualities and international dialogue among young people" in Georgia (September 2015). Again, as last year, Technische Universitaet Chemnitz will be a partner organization. Young people from University of Wroclaw once again would like to take part of the non-formal education and mobility activities included ...
Read Project

 5

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

As its predecessor in the project year 2014 as well as the projects under LLP, the project Erasmus+ 2015 was a vital part of TU Chemnitz‘ continued internationalisation activities. At the same time, it provided the foundation for the biggest part of all international mobilities (especially in the field of student mobilities) that took place during the duration of the project. All programme activit ...
Read Project

 1

 FINISHED 
Modern societies are eagerly looking for the integration of mobility and their urban living area to enable reliable and safe transportation, better efficiency and cost, comfort and low emissions for the environment. The trends are obvious, however, providing a hybrid/electrical car is only one part of the full picture. The "standard" customer is still very reluctant to buy a full electrical vehicl ...
Read Project

 17

 FINISHED 
The interest in the carbon footprint of Data Centres (DCs) has become more urgent with the rapid increase in Cloud computing, High-Powered Computing, and the vast growth in Internet use, and of DCs as key enablers of this paradigm. However, whereas energy efficiency is necessary to reduce ecological impact of DCs, it is not enough. In addition, the carbon emissions of DCs are greatly influenced by ...
Read Project

 7

 FINISHED 

Smart Thermal conductive Al MMCs by casting (THERMACO)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The ever–growing demand for heat evacuation applications in fields such as power microelectronics, e-mobility or (renewable) energy generation is motivating today's suppliers to come up with better and better heat conductive materials. Most of these products who were recently introduced to the market are carbon based materials aimed for extremely high heat conductivity (up to 2,000 W/mK). While d ...
Read Project

 11

 FINISHED 
Description SME-suitable robots that assist in managing uncertainty by symbiotic Human-Robot-Interaction and embedded cognition Over two-thirds of European workers in manufacturing are employed in small and medium-sized enterprises (SMEs). While robots are able to carry out repetitive tasks to a h ...
Read Project

 26

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Spatial Cognition (SpaceCog)

Start date: Mar 1, 2013, End date: Feb 29, 2016,

Humanoid robots will become important machines to support mankind if they develop similar capabilities as humans have. One of those capabilities is to orient in space and to extract the relevant information from its environment. A common approach has been to build a spatiotopic map of the external world, so called an internal world model. However, since the sensors, such as the eyes (cameras) are ...
Read Project

 6

 FINISHED 
Future electronic power devices and packages will need to demonstrate more performance and functionality at reduced cost, size, weight, energy consumption and thermal budget. Further, increasing reliability demands have also to be met by industry to be competitive in this growing multi-billion Euro market of heterogeneously integrated systems.To respond to these challenges, new innovative nano- an ...
Read Project

 18

 FINISHED 
Description Packaging and thermal management in an efficient and cost effective way for SiC and GaN-based power devicesFor industrial motor-drive, UPS and solar inverters applications and aerospace or telecom radio frequency applications, new emerging power semiconductor technologies, respectively SiC and GaN, have demonstrated their high ...
Read Project

 15

 FINISHED 
Tomorrows micro-electronic devices will have to show more functionality and performance at smaller form factor, lower cost and lower energy consumption in order to be competitive on this multi-billion dollar market. Advanced system integration is thus inevitable, a trend bound to joining dissimilar materials with new packaging technologies. These processes must enable lower thermal resistances and ...
Read Project

 10

 FINISHED 
...es and international dialogue among young people?. The leader of the project was the Scientific Circle of European Studies Students ?Project Europe?. They invited their friends from Opole University, TechnischeUniversitaet Chemnitz and Georgian Speleologists Union. The project created an educational platform for sharing youth opinions about the idea and the practical side of the European integrati ...
Read Project

 4

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

The project Erasmus+ 2014, as its predecessors already, was an integral part of TU Chemnitz' activities in regard to internationalisation. It was the basis for the, with a distance, biggest part of all the mobility activities that took place in the concerned time frame - especially student mobility. The project activities are firmly incorportated in the Departments in concern. They are being conne ...
Read Project

 1

 FINISHED 

High Precision Micro Production Technologies (HI-MICRO)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The Hi-Micro project intends to realise an innovative approach for the design, manufacturing and quality control of tool inserts to achieve significant breakthrough in mass production of precision 3D micro-parts, through further developing both enabling manufacturing technologies, including additive manufacturing (AM), micro electrical discharge machining (micro-EDM), micro electro-chemical machin ...
Read Project

 11

 FINISHED 
FLEXIBILTIY aims at significantly advancing the competitiveness of Europe in the area of multifunctional, ultra-lightweight, ultra-thin and bendable OLAE systems. The developed OLAE components include disposable and rechargeable batteries, solar cells, DC charging electronics, loudspeakers, audio amplifiers, analogue signal generators, motion and temperature sensors, RF receiver circuits, as well ...
Read Project

 13

 FINISHED 
The aim of the present proposal is to contribute to the smart growth in the Free State Saxony as an emerging region in the European Union by increasing the efficiency and effectiveness of investments in research, development and innovation and by contributing to a better and more efficient connection of actors along the innovation chain.To achieve the above mentioned objectives the proposed projec ...
Read Project

 3

 FINISHED 
Smart & Compact Battery Management System Module for Integration into Lithium-Ion Cell for Fully Electric VehiclesSMART-LIC addresses the development of a new Battery Management System concept aiming at:* Higher efficiency of the battery packs because of the localized control* Increased overall reliability and safety such that early determination of irregularities and failures of the actual batter ...
Read Project

 11

 FINISHED 

Technology & Design Kits for Printed-Electronics (TDK4PE)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

The goal of Technology & Design Kit for Printed Electronics (TDK4PE) is to set a fundamental change in the way printed electronics (PE) are designed and manufactured in Europe, with the aim of reducing costs and time-to-market by more than an order of magnitude for more complex designs than ever before by addressing thousands of transistors on a substrate.The key is to develop a methodology to ena ...
Read Project

 10

 FINISHED 
DECOMOBIL will take advantage of the structured research network set up in HUMANIST NoE and followed up in HUMANIST VCE, in order to develop and widely disseminate knowledge in the area of human centred design of ICT for sustainable transport. Expected impacts of DECOMOBIL are: widening the market for ICT based mobility and transport services by contributing to the development and the widespread o ...
Read Project

 10

 FINISHED 
The ERG project focus on the solar energy supply chain, starting form photovoltaic cells (PV) and proceeding with energy extraction (harvesting) techniques, high efficiency power conversion and finally managing the energy distribution inside a smart grid, with the target of different classes of applications, from house to small area, as well as application specific “local grid” (healthcare, automo ...
Read Project

 27

 FINISHED 

Best-Reliable Ambient Intelligent Nano Sensor Systems (e-BRAINS)

Start date: Sep 1, 2010, End date: Feb 28, 2014,

Best-Reliable Ambient Intelligent Nanosensor Systems – e-BRAINS – represent a giant leap for outstanding future applications in the area of ambient living with the ultimate need for integration of heterogeneous technologies, high-performance nanosensor devices, miniaturization, smart wireless communication and best-reliability.e-BRAINS with minimum volume and weight as well as reduced power consum ...
Read Project

 20

 FINISHED 
"In this project a high voltage application specific integrated circuit will be developed in order to drive a number of piezoelectric MEMS-based actuators. The goal is to demonstrate the benefit of a high voltage ASIC development with respect to space, weight, cost and power consumption while providing the full performance in terms of functionality."
Read Project

 2

 FINISHED 
The objective of ADAPTATION is to improve the career perspectives of young researchers by taking part in an innovative European research programme aiming at investigating drivers' behavioural adaptation and its underlying processes over the time in response to Advanced Driver Assistance Systems (ADAS) use. The research programme integrates, under a joint theoritical framework and a joint longitudi ...
Read Project

 10

 FINISHED 

Usable TRUST in the Internet of Things (uTRUSTit)

Start date: Sep 1, 2010, End date: Dec 31, 2013,

The Internet of Things (IoT) will connect a large number of communication and information systems. These systems will be part of everyday life in the same way mobile phones have become part of our lives. The information security properties of the IoT are often difficult to understand for its users, because they are hidden in pervasive systems and small devices manufactured by a large number of ven ...
Read Project

 6