Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through ...
Read Project

 39

 FINISHED 
The cities of Madrid, Stockholm, Munich, Turku and Ruse have formed the CIVITAS ECCENTRIC consortium to tackle the challenges of mobility in suburban districts and clean, silent and CO2 free city logistics. In many cities, these two important areas have received less attention in urban mobility policies.Though European cities have made significant steps forward in making city centres attractive an ...
Read Project

 30

 FINISHED 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Read Project

 15

 FINISHED 
This research project focuses on several key Direct Energy Deposition (DED) Additive Manufacturing (AM) processes that have great potential to be used as cost-effective and efficient repairing and re-manufacturing processes for aerospace components such as turbine blades and landing gears. This project aims to conduct fundamental research to understand the material integrity through chosen DED AM ...
Read Project

 4

 FINISHED 
The aim of INN-BALANCE is to develop a novel and integrated development platform for developing advanced Balance of Plant components in current fuel cell based vehicles, in order to improve their efficiency and reliability, reducing costs and presenting a stable supply chain to the European car manufacturers and system integrators. Accordingly, INN-BALANCE technical objectives are (i) to develop h ...
Read Project

 9

 FINISHED 
Large-scale computing systems are today built as distributed systems (for reasons of scale, heterogeneity, cost and energy efficiency) where components and services are distributed and accessed remotely through clients and devices. In some systems, in particular latency-sensitive or high availability systems, components are also placed closer to end-users (in, e.g., radio base stations and other s ...
Read Project

 9

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 

READY

Start date: Dec 1, 2014, End date: Nov 30, 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Read Project

 23

 FINISHED 

The Cyanobacteria Blooms Public Information Service (CyanoLakes)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

CyanoLakes will be a global service for the environmental authorities and commercial sector, concerned by health risks and quality of water resources. The proposed project will deliver a fully automated application for assessing toxin producing cyanobacteria blooms in water resources globally, using ground-breaking Copernicus Earth Observation technology. The service foresees a dual dissemination ...
Read Project

 8

 FINISHED 
Quality in ECEC is gaining an increasingly prominent position on European and national policy agendas. One of the most important characteristics that has been associated with high quality of ECEC provision, is the strengthening of the skills (professional development) of ECEC staff. The problem that the partnership has identified stands in the fact that the training procedures of in-service educat ...
Read Project

 7

 FINISHED 

Integrated oil spill response actions and environmental effects (GRACE)

Start date: Mar 1, 2016, End date: Aug 31, 2019,

Objectives: 1) to improve the observation and predictions of oil spreading in the sea using novel on-line sensors on-board vessels, fixed structures or gliders, and smart data transfer into operational awareness systems; 2) to examine the true environmental impacts and benefits of a suite of marine oil spill response methods (mechanical collection in water and below ice, in situ burning, use of ch ...
Read Project

 13

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 
X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Read Project

 22

 FINISHED 
EFFORTE draws a red line through critical, cost/benefit driving processes, and environmentally concerns of today´s forestry. Starting with efficient fulfilment of various customer demands the red line goes along efficient utilization of Big Data sources, present knowledge and critical new knowledge foreseen as outcomes from this project.Technical development and mechanization has been a winning co ...
Read Project

 23

 FINISHED 
The multidisciplinary project will address key technical issues that must be tackled to support the implementation of planned geological disposal projects for higher-level radioactive wastes across the EU. Our current understanding of the impact of microbial metabolism on the safety of geological repositories remains tenuous, even though microorganisms may have controlling influences on wasteform ...
Read Project

 15

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 
This project aims at demonstrating the feasibility of a non-invasive, safe and patient-friendly methodology for on-site rapid diagnosis of tropical diseases. The proposed approach is based on breath samples analyses, which are easy to obtain and present no discomfort or risk for patients health. In this study will be enrolled patients with three different types of neglected tropical diseases (Hyda ...
Read Project

 9

 FINISHED 

RLEF Training and Education Portal

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Rugby league in Europe continues to grow rapidly. The RLEF is dealing with the fundamental need to ensure its growing network of members is equipped with knowledgeable, competent and qualified staff able to disseminate the sport’s on- and off-field values and techniques at a high level of quality, and ensuring it is administered by robust, democratic and transparent NFs.By far the largest constitu ...
Read Project

 22

 FINISHED 

Action Plan for the future of Mobility in Europe (MOBILITY4EU)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Global socio-economic and environmental megatrends are urging for a paradigm shift in mobility and transport that involves disruptive technologies and multimodal solutions. The individual transport sectors face diverse technical and non-technical requirements and rather individual, sometimes contradicting challenges. An action plan for the coherent implementation of innovative transport and mobili ...
Read Project

 20

 FINISHED 
Mindfulness as a practice is thousands of years old in fact, but its techniques have been adapted by modern psychology in recent years. Ever since, its applicability to everyday life and especially its stress-combating effect have become renowned worldwide. However, its application to professionals in the mental health field is something which has not been focused on to date, and we believe this p ...
Read Project

 5

 FINISHED 

IP1 Traction TD1 and Brakes TD5 – Phase 1 (PINTA)

Start date: Sep 1, 2016, End date: Nov 30, 2018,

The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic S2R-CFM-IP1-01-2016 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.Traction subproject will focus on the improvement of seven technical and economical pe ...
Read Project

 9

 FINISHED 

Strategic Dialogue on Sustainable Raw Materials for Europe (STRADE)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

STRADE addresses the long-term security and sustainability of the European raw material supply from European and non-European countries. It will develop dialogue-based, innovative policy recommendations for a European strategy on future raw-material supplies.STRADE will initially concentrate on the industry perspective. Based on an analysis of the European mineral raw-material mining sector’s comp ...
Read Project

 7

 FINISHED 

CO2 capture from cement production (CEMCAP)

Start date: May 1, 2015, End date: Oct 31, 2018,

The European cement industry has committed itself to contributing to climate protection measures and therefore to curbing its CO2 emissions. CO2 capture technologies, although an essential part of all CO2 reduction scenarios, are not yet ready for large-scale deployment in the cement industry. Hence, the primary objective of CEMCAP isTo prepare the ground for large-scale implementation of CO2 capt ...
Read Project

 15

 FINISHED 
Description (EN): REGINA will develop an innovative, strategic model for protecting, promoting and developing cultural and natural heritage. This will be composed of a set of decision support tools tailored to the particular needs of municipalities and local communities in remote and sparsely populated regions whose economies are characterized by the emergence and/or dominance of a ...
Read Project

 12

 FINISHED 
PERFoRM - Production harmonizEd Reconfiguration of Flexible Robots and Machinery aims to the conceptual transformation of existing Production Systems towards plug&produce production systems in order to achieve a flexible manufacturing environments based on rapid and seamless reconfiguration of machinery and robots as response to operational or business events.These objectives require research acti ...
Read Project

 18

 FINISHED 
... national, and international levels. At the local and regional level, project activities that specifically target University students in different regions in Turkey, France, and Sweden will help to promote employability of young people seeking to enter the labor market. In the long run, university students who gain the necessary behavioral competencies and manage their own personal brands effectiv ...
Read Project

 5

 FINISHED 
With the ULTIMATE project five experienced research groups and four major European engine manufacturers will develop innovative propulsion systems to fulfill the SRIA 2050 key challenges. One of the most challenging targets is the 75% reduction in energy consumption and CO2-emissions. Technologies currently at TRL 3-5, cannot achieve this aim. It is estimated that around a 30% reduction must come ...
Read Project

 11

 FINISHED 
... to get the technical documentation and engineer the components and manufacturing. The prototype will be demonstrated to the target stakeholders under real-life conditions through a “roadshow” in Sweden: one existing route and two potential high speed city commuting routes subject to speed restrictions due to wake wash problems. The operation of GFF will result in economical advantage of about 300 ...
Read Project

 3

 FINISHED 

PowerKite - Power Take-Off System for a Subsea Tidal Kite (PowerKite)

Start date: Jan 1, 2016, End date: Jun 30, 2018,

The PowerKite project will design, build and deploy a power take-off system (PTO) for novel tidal energy collector concept, the Deep Green subsea tidal kite. The overall objective of the PowerKite project is to gather experience in open sea conditions to enhance the structural and power performance of the PTO for a next generation tidal energy converter to ensure high survivability, reliability an ...
Read Project

 9

 FINISHED 

Neue Impulse für Forstwarte

Start date: Jun 1, 2016, End date: May 31, 2018,

The Liechtensteiner Forstverein supports the continuous vocational training of its members, trainers and learners. In order to extend the professional skills on international level and to enhance the attraction of this profession (which is not harmless) of the forest manager, four mobility activities are planned. The aim of the Erasmus+ project is to foster the professional, mental, linguistic and ...
Read Project

 5

 FINISHED 

Vocational Education and Training to Excellence 2016

Start date: Jun 1, 2016, End date: May 31, 2018,

...it possible for trainers to exchange their know-how and it is ideal for young talented people to train for the professional world championships. More over industrial placements and job-shadowings in Sweden are planned as well as advanced training in educational institutions in different member countries for trainers in order to emphasis the professional education on an international level. In para ...
Read Project

 5

 FINISHED 

Satellite-based Wetland Observation Service (SWOS)

Start date: Jun 1, 2015, End date: May 31, 2018,

The objective of the project SWOS is to develop a monitoring and information service focussing on wetland ecosystems.Globally wetlands are the ecosystems with the highest rate of loss. This is alarming, considering their significance as biodiversity hotspots and ecosystems with a central role in the water cycle, including improving water quality and reducing water scarcity, in climate regulation a ...
Read Project

 13

 FINISHED 

PeaceWorks' Volunteer Programme 2016/2017

Start date: May 16, 2016, End date: May 15, 2018,

... mutual understanding through exchanges. There will be 6 volunteers participating in the project, coming from the countries: Portugal, Germany, Hungary and the Czech Republic. They will all be in Sweden, at two different hosting organisations, for 12 months each. Four of the volunteers will be at Staffansgården Camphill in Delsbo, a community center for mentally disabled adults, where they will pr ...
Read Project

 7

 FINISHED 

Creative Momentum

Start date: May 11, 2015, End date: May 10, 2018,

Description (EN): Creative Momentum (CM) tackles the peripherality and distance to market challenges experienced by entrepreneurs in the creative and cultural industries across the Northern Periphery and Arctic area, as well as low economic diversity in these regions.  It provides enterprise development and market expansion spaces, services and supports with a transnational focus.  ...
Read Project

 6

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 
The trend in navigational accidents no longer appears to decrease. In a Formal Safety Assessment (IMO NAV59-6, Annex 1) 5.544 navigational and 7.275 other accidents resulted in the loss of 6.264 lives (2001-2010). The coincide of EU policies on safer and more efficient waterborne operations and in particular the e-maritime initiative with IMO’s strategy for e-navigation opens a unique window of op ...
Read Project

 32

 FINISHED 

Slow Adventure In Northern Territories (SAINT)

Start date: Apr 13, 2015, End date: Apr 12, 2018,

Description (EN): Slow Adventures in Northern Territories (SAINT) will work with SMEs to make them more aware of how to capitalise on the business opportunities in guided slow adventure experiences, offering simple nature-based, immersive journeys, living and travelling in wild places, through marketing to new, distant customer markets.  Nothern Europes wide-open, wild spaces provid ...
Read Project

 11

 FINISHED 
The CLARITY project seeks to support European Member States in their pursuit for greater trust, transparency and efficiency within government via the increase take-up of open government initiatives. CLARITY is a small-scale coordination and support action designed to: 1) mobilise a multidisciplinary network of stakeholders across the open government ecosystem in order to support and encourage the ...
Read Project

 7

 FINISHED 

Real-time dynamic control system for laser welding (RADICLE)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

RADICLE aims to create a real-time dynamic control system for laser welding using a combination of (application specific) sensors in combination with intelligent and predictive control technologies for in-process monitoring and control to minimize/eliminate defects for a range of materials and geometries for both aerospace, automotive and other applications. The control system will include pre- an ...
Read Project

 12

 FINISHED 

Satellite Technology for Advanced Railway Signalling (STARS)

Start date: Feb 1, 2016, End date: Jan 31, 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Read Project

 18