Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Towards Smart Zero CO2 Cities across Europe (SmartEnCity)

Start date: Feb 1, 2016, End date: Jul 31, 2021,

SmartEnCity’s main Objective is to develop a highly adaptable and replicable systemic approach towards urban transformation into sustainable, smart and resource-efficient urban environments in Europe through the integrated planning and implementation of measures aimed at improving energy efficiency in main consuming sectors in cities, while increasing their supply of renewable energy, and demonstr ...
Read Project

 35

 FINISHED 
The overall objective for iBUS is to develop and demonstrate by 2018 an innovative internet based business model for the sustainable supply of traditional toy and furniture products that is demand driven, manufactured locally and sustainably, meeting all product safety guidelines, within the EU. The iBUS model focuses on the capture, creation and delivery of value for all stakeholders – consumers, ...
Read Project

 10

 FINISHED 
The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Read Project

 17

 FINISHED 
BIO4SELF aims at fully biobased self-reinforced polymer composites (SRPC). To produce the SRPCs two polylactic acid (PLA) grades are required: a low melting temperature (Tm) one to form the matrix and an ultra high stiffness and high Tm one to form the reinforcing fibres. To reach unprecedented stiffness in the reinforcing PLA fibres, we will combine PLA with bio-LCP (liquid crystalline polymer) f ...
Read Project

 16

 FINISHED 
"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Read Project

 18

 FINISHED 
In the wind power generation, aerospace and other industry sectors there is an emerging need to operate in the low temperature and highly erosive environments of extreme weather conditions. Such conditions mean current materials either have a very short operational lifetime or demand such significant maintenance as to render many applications either very expensive to operate or in some cases non-v ...
Read Project

 18

 FINISHED 

SportVoice

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The overall objective of the project is to build capacity in civil society organisations to engage in active advocacy for the implementation of the EU PA GuidelinesThe European Partners are umbrella organisations with experience in advocacy on the EU level. They will, in turn, engage with their member associations (National Project Partners and beyond) to deliver capacity building, alliance creati ...
Read Project

 11

 FINISHED 
Within Trash-2-Cash, growing problems with paper fibre waste from the paper industry and textile fibre waste, originating from a continuously increasing textile consumption, will be solved through design-driven innovation. This will be performed by using the wastes to regenerate fibres that will be included into fashion, interior and other products. The cotton production suffers from non-sustainab ...
Read Project

 18

 FINISHED 
In the frame of previous FP6 and FP7 projects with involvement of IZADI-NANO2INDUSTRY consortium members nanotechnologies have demonstrated their effectiveness for enhancing materials and manufacturing processes performance up to a certain level tested in intended environment (TRL 5). Different nanotechnology based strategies have been addressed to develop methods to improve thermoplastics and m ...
Read Project

 14

 FINISHED 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Start date: Nov 1, 2015, End date: Oct 31, 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c ...
Read Project

 23

 FINISHED 

Peat Valley: repositioning education in the region

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Context/background of project and objectives of your project Education institutes play a central role in a knowledge-based economy. Evidence shows – consistently, and over time – that countries that invest heavily in education and skills, benefit economically and socially from that choice. Research shows that it requires schools to be flexible, responsive to the needs of the labour market and the ...
Read Project

 6

 FINISHED 

Flexibility Activated Zero Energy Districts (REnnovates)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The Ren(n)ovates proposal focuses on the deployment and demonstration of an innovative systemic, 4-step holistic approach comprising state-of-the-art renovation with state-or-the-art smart ICT control. Deep renovation of residential buildings will be carried out including the installation of a standardised pre-fabricated energy module equipped with communication technology converting the buildings ...
Read Project

 9

 FINISHED 
Present approaches to increasing resource efficiency in manufacturing companies are mainly focused on single process optimisation. A wider and integrated optimisation is assumed to have significantly higher savings potential.In fact, a pilot study has been performed by Greenovate!Europe, showing resource saving potentials of 70%Such a strategy should include optimisation across the interfaces betw ...
Read Project

 16

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 
This R&I action will focus on optimally combining traditional roll-to-roll (R2R) compatible fabrication technologies such as printing with unique R2R sputtering, ALD and heterogeneous integration for flexible, thin, large-area electronics applications. It is seen that the different R2R fabrication methods all have their strengths and weaknesses such that using a cost-performance-optimized combinat ...
Read Project

 11

 FINISHED 

ForProve theatre

Start date: Oct 1, 2015, End date: Sep 30, 2017,

According to the European Commission, in the second quarter of 2014 over 5 million young people (under 25) were unemployed in the EU-28. This represents an unemployment rate of 21.7% (23.2% in the euro area), which is more than twice as high as the adult unemployment rate (9.0%). Unemployment among youths has been a top priority for EU countries. One of the reasons for the unemployment is the lack ...
Read Project

 6

 FINISHED 

Minority languages, good travelling companions

Start date: Sep 1, 2015, End date: Aug 31, 2017,

PARTICIPANTS AND CONTEXT: Three schools are participating in this strategic partnership: the applicant is Laskorain Ikastola (Tolosa, Basque Country, Spain) and our two partners are Humaniora Kindsheid Jesu (Hasselt, Flanders, Belgium) and Istituto di Istruzione Superiore San Giuseppe Calasanzio (Sanluri, Sardinia, Italy). A total of 435 students (aged 16-18) will be actively involved in the proj ...
Read Project

 3

 FINISHED 

ENERGY EFFICIENT BALED STRAW ECOLOGICAL HOUSE

Start date: Aug 1, 2016, End date: Aug 31, 2017,

Project title ENERGY EFFICIENT BALED STRAW ECOLOGICAL HOUSEProject type Erasmus+ KA2 Capacity building in the field of Youth (Western Balkan Youth Window)The main idea: The main aim of this long-term project is acquiring knowledge and skills to participants about using ecological materials in construction and architecture, about energy efficiency and cheaper construction and decreasing amoun ...
Read Project

 8

 FINISHED 
During more than 50 years of the laser existence, they have been proved as the unique tool for diverse material processing application. New application ideas, coming from universities and research institutions, are usually implemented by spin-off companies with limited resources for market penetration. Research laboratories are using universal laser tools, while effective and low-cost production r ...
Read Project

 36

 FINISHED 

Acceuil SVE

Start date: Aug 29, 2016, End date: Aug 28, 2017,

4 structures of the association are Scoope in priority areas of the city of Saumur.Saumur is a town in the French sub-prefecture of the Maine Department -and- Loire, in Pays de la Loire.This is the third municipality of the department in terms of population (27 500 inhabitants).The Scoope is defined as a resource instead offering services and coordinate activities, social, educational and cultural ...
Read Project

 2

 FINISHED 
Background The European food industry generates some 89 million tonnes/yr of food waste across the EU-27, equivalent to 179 kg per capita. Unless preventive measures are taken, the European Commission forecasts that this figure will increase to 126 million tonnes/yr by 2020. In Spain, according to the National Statistics Institute (INE), the food indust ...
Read Project

 4

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
The ‘Factories of the Future’ PPP launched in 2008/9 has been a proven success and triggered a unique cooperation between industry, researchers and the European Institutions. The objective of the FoF Impact CSA is to transform the FoF PPP from a research and demonstration programme under FP7 into an innovation programme in Horizon 2020. The FoF-Impact CSA will integrate, in one comprehensive and s ...
Read Project

 9

 FINISHED 

Be Unique, Intelligent, Lucrative, Diligent - BUILD

Start date: Nov 1, 2015, End date: Oct 31, 2016,

The TC “Be Unique, Intelligent, Lucrative, Diligent" is aimed to provide extensive knowledge on all economic, social and public aspects of entrepreneurship and to promote the development of new business plans and other sustainable social initiatives among youth workers. The ultimate goal is in this way to provide sustainable support in combating youth unemployment on one hand and solving social pr ...
Read Project

 10

 FINISHED 

Social Entrepreneurship for brighter future

Start date: Nov 1, 2015, End date: Oct 31, 2016,

The TC is aimed to provide extensive knowledge on all economic, social and public aspects of entrepreneurship and to promote the development of new business plans and other sustainable social initiatives among youth workers. The ultimate goal is in this way to provide sustainable support in combating youth unemployment on one hand and solving social problems for more inclusive growth on the other ...
Read Project

 10

 FINISHED 
"The main objective of this project is to develop a radically new manufacturing industrial green process based on the electrodeposition of aluminium from ionic liquids and post-processed the aluminium pure coating to obtain high-tech engineered metallic materials for the automotive and aeronautic sectors.This new process will replace conventional harmful techniques and will be more energy and mate ...
Read Project

 6

 FINISHED 
High Pressure Die Casting (HPDC) of light alloys and Plastic Injection Molding (PIM) are two of the most representative large-scale production-line in manufacturing field, which are strategic for the EU-industry largely dominated by SMEs. Due to the high number of process variables involved and to the non-sinchronisation of the process control units, HPDC and PIM are most "defect-generating" and ...
Read Project

 18

 FINISHED 

Promotion of Labour Mobility in Europe

Start date: Feb 1, 2016, End date: Jul 31, 2016,

High youth unemployment rate in the South, lack of work forces in the North, misuse of workers, inequality of domestic and foreign workers, lack of information about rights and possibilities. This is just the top of an iceberg of issues that European Labour Market faces today. European youth labour mobility offers many possibilities to unemployed young people from Bulgaria to Ireland, from Portuga ...
Read Project

 8

 FINISHED 
BANUS project aims to develop new multilayer structures for food packaging applications, in order to evaluate their properties as functional barriers, using conventional polymers to achieve new functionalities and open new potential markets for the traditional recycling companies in Europe.Taking into account that the main objective of the project is to guarantee the suitability of the developed f ...
Read Project

 11

 FINISHED 

Fairy Tale For Creativity

Start date: Sep 1, 2015, End date: Feb 29, 2016,

Our project contain using the fairy tale as tool for creativity, telling the importance of creativity in social and business life, realization interculturel learning, conribute to participants self-confidence and create the social awareness about the project topic. Our project targets; using fairy tale and some tools to provide improving imagination and creativity at participants, contribute to a ...
Read Project

 5

 FINISHED 

Daha çok Güven! Daha az Kork!

Start date: Aug 1, 2015, End date: Jan 31, 2016,

we aimed to male the people ro understand how important stage is the choice of vocation in our life , to create socail awareness in this issue. Our goal is to develop a universal sensitivity by our short film and the motto that we will use. Team leaders came our counrty for preliminary visit about our activities determined in our Project. By incoming team leaders in total 5 people, 3 female , 2 m ...
Read Project

 5

 FINISHED 
Micro- and nanometer structuring has proven to be an efficient method to functionalize surfaces, and is attractive to manufacturers of plastic products. Plastic components are volume manufactured by injection moulding. Compact Discs and Digital Video Discs are today manufactured with nanometer range lateral resolution but, only on planar surfaces. Free-form (double-curved) moulding tools today off ...
Read Project

 14

 FINISHED 

project ON

Start date: Jun 1, 2015, End date: Nov 30, 2015,

The „project ON” is a six-month-long project organised in the cooperation of European youth workers having different experiences, knowledge and cultural background aimed to create together an adventure booklet and a boardgame which can be used during different field activities, special school classes, club activities to improve the projectmanagement skills of young people. We organise a seminar du ...
Read Project

 6

 FINISHED 
We are a secondary school in Bruges (Belgium, Flanders) offering 6 years of general secondary education. Currently we offer education to some 656 pupils and employ some 75 teachers. The school wishes to optimise its functioning in order to constantly guarantee and improve the education it offers. We want to do this more systematically by using the principles of the EFQM-model (European Foundation ...
Read Project

 2

 FINISHED 
...ing field in social entreprenership and third sector from France (Provence region) to Catalunya. The objective is the increase of the number of trainig activities through the experiences of the Calidoscoop spanish partners. A special focus on the pedagogic aspects developped and the theories on social business will be essential for our participants. In the next 10 years, more than 25 000 people w ...
Read Project

 2

 FINISHED 
The actors go into action in the regions to implement the French State Plan Youth priority 2013, which promotes in its resolutions the commitment and international mobility of young people. In order to support this dynamics, the project "Dialogue seminar on the commitment and international mobility of young people", aims at rallying the experts (representatives of local authorities, institutions a ...
Read Project

 1

 FINISHED 

Youth for the future

Start date: Jun 20, 2014, End date: Oct 22, 2014,

Project Youth4future is a mobility project - youth exchange for 35 young people, coming from Slovenia, Italy, Estonia, Poland and Hungary. The main topic of the project is entrepreneurship and therefore strengthening entrepreneurial skills and search for possibilities and activities that lead to avoiding youth unemployment. Project will take place from 01.08.2014 until 08.08.2014 in Celje, Sloveni ...
Read Project

 5

 FINISHED 
Progress in nanotechnology benefits achieving new functions and features for numerous new products and applications through the knowledge-based tailored properties. However, despite these special features, there are many challenges to transfer real applications into our daily life. NANOCLEAN project seeks to demonstrate the up-scaling of tailor-made nanostructured based self-cleaning feature on p ...
Read Project

 7

 FINISHED 
The project aims to develop e-learning courses for SMEs in innovative areas (financial management, market research with help of ICT, e-marketing, customer relations management systems, cultural management, product development) and to develop software based on open-source kernel. All materials will be multilingual. The material will be tested with the SMEs of each partner country and revised accord ...
Read Project

 4

 FINISHED 
The project will establish an internet portal to train employees about health and safety in the workplace. The portal will provide a series of training courses addressed to specific jobs. An overarching project aim is to increase compliance in Europe with EC health and safety directives by targeting training at workers, both employees and the self-employed, who have difficulty in accessing trainin ...
Read Project

 5