Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...in two ways: • The services for foot passengers on the axis Rostock – Gedser are further improved. In close cooperation with the Rostock – Gedser ferry line operator Scandlines, the Public Transport Association Warnow, the Public Transport Operator Movia and Guldborgsund Municipality sets up a dynamic passenger information system between Rostock Inner City and Nykøbing City Centre. It gives trave ...
Read Project

 7

 FINISHED 
PA Transport of the EUSBSR calls for coordination of national transport policies and actions to ensure a harmonised transnational development of the transport system. The ensured thematic focus and established links between the above initiatives helped achieve certain stage of coordination and complementarity. However, fuller integration of the approaches, which would enable better development and ...
Read Project

 22

 FINISHED 

CLEAN BALTIC SEA SHIPPING (CleanShip)

Start date: Jun 9, 2010, End date: Sep 9, 2013,

...altic Sea. The project shall result in a web-based Pan-Baltic Best Practice Manual and a strategy for Clean Shipping. Scenarios for environmental impact from different technical measures and specific port elaborations by pilot projects form the basis for future commitments and decision making about needed investments.The CLEANSHIP project partners, all in all 19 full partners, 20 associated partne ...
Read Project

 21

 FINISHED 

Bothnian Green Logistic Corridor (BGLC)

Start date: Jun 8, 2011, End date: Mar 7, 2013,

The railway infrastructure of the Bothnian Corridor is of great importance for transnational cargo flows within EU and to the rest of the world and it is listed in the Baltic Sea Strategy action plan as an optional flagship project. The corridor is of great importance for all the states in the Baltic Sea Region and central Europe, for transports of cargo as well as for sustainable passenger transp ...
Read Project

 29

 FINISHED 
Crossing SBA as foot passenger by ferry has lost its importance during the last decades. This trend has triggered a circuit of negative effects, becoming evident esp. in interface areas. Services of infrastructure providers & transport operators are adjusted to cargo & car passenger traffic only, whereas raising service requirements of foot passengers were neglected completely. Ferry ports do not ...
Read Project

 12

 FINISHED 

Scandinavian-Adriatic Corridor for Growth and Innovation (SCANDRIA)

Start date: Aug 31, 2009, End date: Sep 8, 2012,

Against the background of doubling freight transport volumes by 2050 in the Baltic Sea Region (BSR), capable transport infrastructures are required for efficient, integrated and sustainable freight and passenger traffic.The Scandinavian-Adriatic Development Corridor is the shortest geographical link between Baltic and Adriatic Sea. It provides freight transport capacities to relieve overloaded Wes ...
Read Project

 19

 FINISHED 

Cruise Traffic and Urban Regeneration (CTUR)

Start date: Jan 18, 2009, End date: Jul 18, 2011,

Cruise Traffic and Urban Regeneration (physical and environmental regeneration of port-areas; cruise traffic and port-heritage as drivers to economic and social development; planning and management of cruise development, etc.) Achievements: Documents/reports:CTUR_7th_se ...
Read Project

 12

 FINISHED 

Oversize Baltic (Oversize)

Start date: Jun 30, 2009, End date: Jun 29, 2011,

Oversize cargos – constitute an economically important segment of commercial haulage. They include exceptionally large and heavy indivisible cargos such as electric transformers, reactor vessels, wind mills or airplane fuselage - which is usually a part of advanced infrastructural high priority energy and technology projects. Oversize transport often needs to travel considerable distance; in many ...
Read Project

 9

 FINISHED 

ADRIATIC-BALTIC LANDBRIDGE (A-B LANDBRIDGE)

Start date: May 31, 2006, End date: Apr 29, 2008,

Besides east/west connections and transport corridors, the enlarged EU also needs an improvement in the transport routes connecting the Mediterranean and Baltic countries. The Adriatic-Baltic land bridge project will conduct a pre-feasibility analysis and develop a deployment roadmap for north/south intermodal transport connections which link Europe and the Mediterranean countries with global mark ...
Read Project

 23

 FINISHED 
Baltic Gateway PLUS aimed at joint actions to implement and finance prioritised transport projects in the South Baltic Sea area. Focus was on infrastructure investments in the hinterland connections, as well as on implementation of intermodal services. The project involved 30 partners from six countries and had an overall budget of approximately 1 MEUR. It was implemented in the period 2006-2007.B ...
Read Project

 31

 FINISHED 
... of cultural heritage as a central production factor of the local economy. Additional objectives are, inter alia, to connect place marketing with spatial development as an innovative approach, support the provision and dissemination of relevant 'know-how' and good practice, including the stimulation of entrepreneurial capacity, and develop innovative place marketing strategies, which will be imple ...
Read Project

 10

 FINISHED 
Transportation of passengers and goods increases dramatically in the South Baltic Sea area. However, existing infrastructure and transport solutions are not enough equipped to manage the growth in an efficient and sustainable way. The challenging development called upon joint actions among organisations in several countries and on various levels. In the Baltic Gateway project, regional and local a ...
Read Project

 38

 FINISHED 

NEW HANSA OF SUSTAINABLE PORTS AND CITIES (NEW HANSA)

Start date: Mar 5, 2003, End date: Dec 14, 2005,

Shipping is regarded as one of the most environmentally friendly transport modes. On the other hand, there are also considerable risks related to the increasing maritime traffic. The aim of New Hansa was to identify and create sound environmental practices and policies for ports and cities. Reducing air emissions and noise, and managing waste and waste water, were in focus for the analyses and exc ...
Read Project

 21

 FINISHED 

Baltic Cruise Project 2004-2007 (BCP 2004-2007)

Start date: Sep 20, 2004, End date: Sep 20, 2004,

BALTIC CRUISE PROJECT is a cooperation between 10 countries, 19 destinations and 32 partners (ports, city and tourist org.) in the Baltic Sea RegionAn exchange of knowledge and information between Baltic ports and destinations focusing on international cruise tourism. To realise a cruise, the cruise vessel must visit several ports and therefore cooperation between Baltic ports and destinations is ...
Read Project

 25