Search for European Projects

15 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Protection of the border areas in the upper Siret and Prut River Basins against the flood risk, other natural dangerous hazards of water cycle and accidental pollutions and reducing the environmental, economic and social vulnerability of targeted localiteis from the border region against flood risk. ...
Read Project

 8

 FINISHED 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Read Project

 14

 FINISHED 
The OrientGate project will foster concerted and coordinated climate adaptation actions across the SEE region. The project will explore climate risks faced by coastal, rural and urban communities; contribute to a better understanding of the impact of climate variability and change on water regimes, forests and agro-ecosystems; and analyse specific adaptation needs in the hydroelectricity, agro-ali ...
Read Project

 34

 FINISHED 
...Pani addresses the improvement of natural water treatment systems such as river bank filtration (RBF), managed aquifer recharge (MAR) and wetlands in India building on a combination of local and international expertise. The project aims at enhancing water resources and water supply particularly in water stressed urban and peri-urban areas in different parts of the sub-continent. The objective is t ...
Read Project

 20

 FINISHED 
...ncentrations in the Barlad river basin; Facilitate the identification of cost-effective measures for river management; Provide support for land-use planning; and Contribute to a future national approach to zones vulnerable to nutrient pollution.
Read Project

 4

 FINISHED 

Danube WATER integrated management (WATER)

Start date: Jun 29, 2012, End date: Jun 28, 2014,

Improving water monitoring and the warnings system, environmental data dissemination on the Romanian-Bulgarian border counties. Processing and conditioning the liquid organic wastes radioactively contaminated from the nuclear plants Cernavodǎ and Kozloduy.
Read Project

 13

 FINISHED 
...like flooding and storms can be detected and managed. Nowcasting plays an increasing role in risk prevention, but its realisation is a highly complex and integrated task INCA CE will implement a transnational information system as well as applications for different socio-economic sectors to reduce risks of major economic damage and loss of life. Not only civil protection but also stakeholders from ...
Read Project

 18

 FINISHED 

Climate Change and Impacts on Water Supply (CC-WaterS)

Start date: Apr 30, 2009, End date: Apr 29, 2012,

...ter resources and will change according to CC. It is crucial for safeguarding future water supply to anticipate these climate and land use changes and to assess their impacts on water resources. Transnational action is needed to prepare SEE for the challenge of ensuring water supply for society for several decades. Policy makers and water suppliers are required to develop sustainable management pr ...
Read Project

 18

 FINISHED 

Drought Management Centre for South East Europe (DMCSEE)

Start date: Mar 31, 2009, End date: Mar 30, 2012,

...parison to neighbouring regions. Ineffective water management is seen as the fundamental problem and can induce additional problems when drought occurs. Droughts have become a strategic issue in SEE. National focal points of the UN Convention to Combat Desertification (UNCCD) (national authorities in the field of drought and desertification) and national permanent representatives with World Meteor ...
Read Project

 15

 FINISHED 

UP-GRADE BLACK SEA SCIENTIFIC NETWORK (UP-GRADE BS-SCENE)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

...gional capacity and performance of marine environmental data and information management, underpins harmonization with European marine data quality control/assessment procedures and adoption of international meta-data standards and data-management practices, providing improved data & information delivery services for the Black Sea region at a European level. The Up-Grade of Black Sea SCENE project ...
Read Project

 50

 FINISHED 

Improvement of flood management system (MOSES)

Start date: Jun 30, 2005, End date: Apr 29, 2008,

... overall, long-term objective of the project is the reduction of flood damage and an increase in the efficiency of flood management by improving decision-making and tools for local, regional and transnational co-operation at river basin scale. The focus lies on implementation and management, including further development and adjustment to the local situation of a unified GIS-based digital flood in ...
Read Project

 8

 FINISHED 
...regarding agriculture, forestry and land-use management in flood risk areas. As most river catchments areas belong to more than one country or region, methodologies have to be developed within a transnational and a transregional context that go beyond local concepts. The project regions of FLOODMED are characterised by an increase in the number of people and economic assets located in flood risk z ...
Read Project

 14

 FINISHED 

Hydrological cycle of the CADSES regions (HYDROCARE)

Start date: Dec 31, 2005, End date: Dec 30, 2007,

...es to develop an integrated system capable of assessing the impact of hydrometeorological events on the water resources in the CADSES region. Emphasis will be put on the development of effective transnational tools for a rational exploitation of the water resources, with the purpose of preserving and enhancing economical and environmental welfare. Such managing tools will be illustrated also in pr ...
Read Project

 11

 FINISHED 

Land-sea interaction: coastal state and evolution in CADSES (CADSEALAND)

Start date: Dec 31, 2003, End date: Dec 30, 2006,

... Expected Results: The project targets the following results: - Developing international standards for the definition of a “state of the coast” useful for territorial planning, management, engineering, insurance, etc., which take into account the processes (both on land and at sea ...
Read Project

 11

 FINISHED 
Background The Bistrita catchment basin is highly sensitive to human activities, and is one of the most polluted basins of the Danube Basin. A Romanian Waters Annual Report on water quality revealed a high concentration of ammonium, nitrates, and organic matter, with high levels of nutrients mainly around two areas –Bacau County – one of the most i ...
Read Project

 4