Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"The main target of the ITEAM project is to establish and sustainably maintain the European training network with high grade of interdisciplinarity, which will train strong specialists skilled in research and development of novel technologies in the field of multi-actuated ground vehicles (MAGV). The global goals are: (i) Advance of European postgraduate education in the area of environment- and u ...
Read Project

 11

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 

Power Semiconductor and Electronics Manufacturing 4.0 (SemI40)

Start date: May 1, 2016, End date: Apr 30, 2019,

Addressing European Policies for 2020 and beyond the “Power Semiconductor and Electronics Manufacturing 4.0” (SemI40) project responds to the urgent need of increasing the competitiveness of the Semiconductor manufacturing industry in Europe through establishing smart, sustainable, and integrated ECS manufacturing. SemI40 will further pave the way for serving highly innovative electronic markets w ...
Read Project

 38

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
The EU is well placed to exploit printed electronic technologies to create greater economic and social benefits for the EU, but only if we are able to commercialise innovative technologies created within the EU.Ink jet printing technologies are at the forefront of printed electronic developments. However, Ink jet printing has only been able to achieve a resolution of >=10um and the viscosity of pr ...
Read Project

 14

 FINISHED 
...strial Management Assistants and 1 Office Management Assistant will be sent to Porto in Portugal for 4 weeks. The apprentices do their apprenticeship at the sites Munich, Regensburg and Warstein. The Infineon Technologies AG and the Infineon Technologies Shared Service Center, Unipessoal Lda. will be involved within the stay abroad.General goal of the project is the acquiring of intercultural comp ...
Read Project

 2

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Read Project

 13

 FINISHED 
The SilverStream project addresses the challenges associated with sustainable and affordable personal mobility for the growing and ageing population in congested European cities. The project combines both ergonomic concepts conceived for elderly people and advanced automotive technologies that are quiet, clean, energy efficient and safe. The particular objectives of SilverStream are: i) specificat ...
Read Project

 10

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
The key objective of PowerBase “Enhanced substrates and GaN pilot lines enabling compact power applications” is to ensure the availability of Electronic Components and Systems (ECS) for key markets and for addressing societal challenges, aiming at keeping Europe at the forefront of the technology development, bridging the gap between research and exploitation, creating economic and employment grow ...
Read Project

 40

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
This project envisions the wide-spread use of low-cost THz technology in our society, enabled by the proposed micromachined heterogeneous integration platform, which provides an unprecedented way to highly-integrated, volume-manufactuable, cost- and energy-efficient, reconfigurable submillimeter-wave and terahertz (THz) systems. The proposed THz integration platform is envisioned to initiate an im ...
Read Project

 8

 FINISHED 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Read Project

 15

 FINISHED 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Read Project

 17

 FINISHED 
...nce which leads to higher data rates (closer to the theoretical limit). Improvement in energy-efficiency will help the European market get one step ahead of the competitors, mainly in the US and Asia.Infineon, as the host organization, is highly supportive to this idea gaining one of the top-level experts in asynchronous and continuous-time digital circuits to strengthen the European Semiconductor ...
Read Project

 1

 FINISHED 

Silicon Microphone (SiMic)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

MEMS (Micro-Electrical-Mechanical System) based microphones, so called “silicon microphones” - are relevant in many applications as their manufacturability is better compared to electret condenser mics (ECM). Often MEMS mics hold embedded ADCs (Analog-to-Digital Converter) on the same CMOS chip. Those “digital output mics” perfectly fit into innovative digital products e.g. smart phones. Extremely ...
Read Project

 2

 FINISHED 

Nano-carbons for versatile power supply modules (NANOCATE)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The multidisciplinary consortium of the NanoCaTe project will develop a more efficient thermoelectric- and storage material based on nanocarbon (e.g. graphene and CNT) to reclaim waste heat by thermoelectric generators and to storage the energy in super capacitors or secondary batteries for manifold applications like pulsed sensors or mobile electronic devices.The integration of the developed mate ...
Read Project

 14

 FINISHED 

PhDs Enhanced for Prospects- ErasmUs Plus

Start date: Sep 1, 2014, End date: Aug 31, 2017,

The PEP-UP project will identify the feasible features of PhD education programs that need to be emphasized to make engineering PhD graduates more prepared for employment in industry and more able to use their talents and training for the benefit of the economy, regions and society. Eight leading technical universities in Europe, with the contribution of two European companies and regio ...
Read Project

 10

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
...t Assistants and 2 Management Assistants for Office Communication were sent to Porto in Portugal for 4 weeks. The apprentices do their apprenticeship at the sites Munich, Regensburg and Warstein. The Infineon Technologies AG and the Infineon Technologies Shared Service Center, Unipessoal Lda. were involved within the stay abroad. General goal of the project was the acquiring of intercultural compe ...
Read Project

 2

 FINISHED 
Europe’s strengths are based on the deep knowledge and market position in automotive industry, industrial electronics industry and leading know how for More-than-Moore based embedded system. It is of vital interest for the electronics manufacturers in Europe to have fast access to reliable prototypes of electronic devices as well as competitive advanced manufacturing of such devices made in Europe ...
Read Project

 26

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Modelling Reliability under Variability (MoRV)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

While feature sizes are continuously scaled towards atomic dimensions, industry is increasingly confronted with unexpected physical artefacts to be considered at each new technology node. Among these, process variation and parameter degradation lead to reliability concerns impacting integrated circuit design at all abstraction levels. As variation and degradation may become a limiting factor for f ...
Read Project

 7

 FINISHED 
Today, an average family spends annually over 50 Euros on No-Failure-Found (NFF) investigations - a known problem of an unknown origin. Tomorrow, the electronic engine control system in a car will be dying after two-three years of operation due to CMOS ageing. Actions are urgently needed!A group of European experts will unite their forces in BASTION to fight against ageing and NFF issues. The proj ...
Read Project

 8

 FINISHED 

MAssive MiMO for Efficient Transmission (MAMMOET)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

The Internet of the future will to a large extent rely on mobile networks. Mobile data grew with 70% in 2012 and is predicted to grow 13-fold in the next 5 years. This puts very high demands on the development of mobile access technology. MAMMOET will advance the development of Massive MIMO (MaMi), a new and most promising direction in mobile access. MaMi makes a clean break with current technolog ...
Read Project

 8

 FINISHED 
With the increasing pervasion of our society by mobile devices like smart phones and tablets and many users running several security relevant applications on multiple mobile devices at the same time, security and privacy challenges outranging those on personal computers arise. In the near future, users are expected to move personal roles and identities between mobile platforms. Electronic represen ...
Read Project

 8

 FINISHED 
SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Read Project

 26

 FINISHED 
In recent years, electric mobility has been promoted as the clean and cost-efficient alternative to combustion engines. Although there are already solutions on the market, mass take-up has not yet taken place. There are different challenges that hinder this process from an end user point of view such as costs of the vehicle, driving range, or infrastructure support. Several of these challenges are ...
Read Project

 8

 FINISHED 
One of the main factors for energy efficiency enhancement in fully electric vehicles is systems integration. To achieve this, iCOMPOSE proposes a step change in the control software architecture with particular focus on comprehensive energy management. This will lead to energy savings and extended driving range of the fully electric vehicle, with benefits of improved vehicle safety and comfort. Th ...
Read Project

 9

 FINISHED 
Modern societies are eagerly looking for the integration of mobility and their urban living area to enable reliable and safe transportation, better efficiency and cost, comfort and low emissions for the environment. The trends are obvious, however, providing a hybrid/electrical car is only one part of the full picture. The "standard" customer is still very reluctant to buy a full electrical vehicl ...
Read Project

 17

 FINISHED 
... better services bringing great value for Europe’s society will be offered.Prof. Papananos expertise in RFIC design as well as in active and passive RF device modeling will complement the skills of Infineon’s R&D team towards the quest for a beyond state-of-the-art digital transmitter design. This cooperation will provide to the researcher an invaluable exposure to a leading industrial IC design e ...
Read Project

 1

 FINISHED 

Smart Thermal conductive Al MMCs by casting (THERMACO)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The ever–growing demand for heat evacuation applications in fields such as power microelectronics, e-mobility or (renewable) energy generation is motivating today's suppliers to come up with better and better heat conductive materials. Most of these products who were recently introduced to the market are carbon based materials aimed for extremely high heat conductivity (up to 2,000 W/mK). While d ...
Read Project

 11

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
DOTSEVEN is a 3.5 year IP proposal for a very ambitious R&D project targeting the development of Silicon Germanium (SiGe) Heterojunction Bipolar Transistor (HBT) technologies with cut-off frequencies (fmax) of around 700 GHz. Special attention will be paid to clearly demonstrate the capabilities and benefits of this technology with benchmark circuits and advanced system applications in the 0.1 to ...
Read Project

 17

 FINISHED 

Enhanced Power Pilot Line - EPPL (EPPL)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

A sustainable and competitive European power semiconductor industry is essential to support the megatrend developments formulated in the Europe 2020 strategy - climate change, energy security, food security, and health and aging population. In practically all these areas, power semiconductors play a vital role. Thus, it is of paramount importance to defend and further extend Europe’s leading posit ...
Read Project

 33

 FINISHED 

Graphene-based Devices and Circuits for RF Applications (GRADE)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

Description Demonstration of the proof-of-concept of novel graphene-based electronic devices operating at terahertz (THz) frequencies GRADE is a project focusing on advanced RTD activities necessary to demonstrate the proof-of-concept of novel graphene-based electronic devices operating at teraher ...
Read Project

 13

 FINISHED 

POWER SoC With Integrated PassivEs (PowerSwipe)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

...th competencies covering the full supply chain from the main OEMs (Audi, BMW, Daimler, Fiat, PSA, RSA, VW) to Tier1 suppliers (Bosch, Continental, Magneti Marelli) to leading semiconductor companies (Infineon, ST). The vision for electronic automotive control units in 2020 is that the battery will supply multi-core µControllers via multiple power supplies using an on-chip, granular power managemen ...
Read Project

 9

 FINISHED 

Environmental Sensors for Energy Efficiency (ESEE)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

ESEE – Environment Sensors for Energy Efficiency targets the markets, were with highly reliable information regarding environmental conditions measures can be deducted, which safe the use of energy. The research will be performed on several different sensor technoglogy approaches and finally validated in a test environment, e.g. under the environmental conditions of an aircraft. In addition an app ...
Read Project

 27

 FINISHED 
Future electronic power devices and packages will need to demonstrate more performance and functionality at reduced cost, size, weight, energy consumption and thermal budget. Further, increasing reliability demands have also to be met by industry to be competitive in this growing multi-billion Euro market of heterogeneously integrated systems.To respond to these challenges, new innovative nano- an ...
Read Project

 18