Search for European Projects

7 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of the project is the development and modernisation of the flood protection infrastructure on Körös river basin. The following developments are planned within the project by Lead Partner and Project Partner: - reconstruction of dike keeper lodge in Csíkér (LP) - repairing of dike keeper house in Sarkad-Sitka (LP) - windows replacement of dike keeper house in Szanazug, repairing of co ...
Read Project

 2

 FINISHED 
The project prepared the construction of a road for flood protection purposes as all the studies, planning documentation and licences required for construction were made available for the bidder. Using the assistance of the support, the following plans and licences were achieved: feasibility study, construction licence plans and construction permits, technical and implementation plans and planning ...
Read Project

 2

 FINISHED 
The project directly aimed at the development and the improvement of floodforecasts, the support of the operation of the flood emergency reservoir, theunderstanding of hydrologic relations of the river by the reconstruction of waterlevel measuring centre on the Feher-Kris as well as the assessment of water quantitydirected into the Élővíz channel and through this, the support of water refreshmentc ...
Read Project

 3

 FINISHED 
The funding helped to design the operation of an environmental protection methodthat greatly contributes to the preservation of the balance of the environment.The aim of the project is to protect the ground water supply and to ensure thesustainable use of the drinking water reserves. In order to achieve this aim thebeneficiary carried out a diagnosis of the eight drinking water supply areas near t ...
Read Project

 3

 FINISHED 
The project assisted preparations for rapidly occurring floods by generating dataseries of floods, water quality, and hydro-meteorology on an on-going basis. Floodsconstitute a regular threat for people living beside waters. Protection of their homes,their property, and first of all their physical integrity is not only their own responsibility.Preparation and protection requires not only considera ...
Read Project

 2

 FINISHED 
The support assisted in two special areas increasing flood safety. On the one hand, it was used in the design of dam development and also in the complete design on the right bank sections of Kettos-Kórós, including also the preparation of the plan for the water right permit, the feasibility study and an implementation plan. On the other hand, the support also provided considerable assistance in de ...
Read Project

 2

 FINISHED 
Floods and damage by floods cause serious problems year by year. Preparation andprotection not only require considerable expertise but major financial expendituresas well. Therefore people living beside living waters often expect floods due atthe time of the changes of seasons full of anxiety. Thus, protection of their houses andproperty is not only their own responsibility but of water management ...
Read Project

 2