Search for European Projects

38 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This proposal presented by Indra Sistemas and CEIT jointly, try to answer in the best way the call JTI-CS2-2014-CFP01-SYS-02-02.The referred call and this associated proposal are framed inside of the packet 4.1.2.4 (Modular power controller for advanced landing system) of the System ITD for the Cleansky2 project.This project will develop a next generation power controller for electric taxi. This c ...
Read Project

 4

 FINISHED 
Background Spain is one of those EU countries subject to serious water scarcity and subsequent water quality problems. It also has a large fish canning industry that consumes large amounts of water during its production phases, including boiling, canning and cleaning. It moreover generates large amounts of wastewater that contain especially high levels of ...
Read Project

 7

 FINISHED 
X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Read Project

 22

 FINISHED 

Advanced Lithium Sulphur battery for xEV (ALISE)

Start date: Jun 1, 2015, End date: May 31, 2019,

ALISE is a pan European collaboration focused on the development and commercial scale-up of new materials and on the understanding of the electrochemical processes involved in the lithium sulphur technology. It aims to create impact by developing innovative battery technology capable of fulfilling the expected and characteristics from European Automotive Industry needs, European Materials Roadmap, ...
Read Project

 17

 FINISHED 
NANONTUN3D will take advantage of the possibilities of Additive Manufacturing (AM) together with the development of a specially tailored Ti- based nano-aditived material to achieve dramatic improvements in structural parts of aero, space, mobility, and equipment sectors, reaching expected savings between 40% and 50% of material in critical applications. inherent benefits of AM will be kept (decrea ...
Read Project

 10

 FINISHED 
Background Sewage sludge generated in urban wastewater treatment plants (WWTPs) is a complex, heterogeneous mixture of microorganisms, inorganic materials and organic substances. It is classified as a non-hazardous waste. Sludge disposal can represent up to 50% of the WWTP management costs. Sewage sludge must undergo some treatment in order to reduce its ...
Read Project

 5

 FINISHED 

European Bus System of the Future 2 (EBSF_2)

Start date: May 1, 2015, End date: Apr 30, 2018,

"The objective of the EBSF_2 project is to validate different innovative solutions that combine efficiency of the bus system with more attractiveness. Such solutions are meant to represent the most innovative in the areas indicated by the Call: the project will proceed to their final validation before their introduction in the market, avoiding pure simulations or large use of prototypes. Following ...
Read Project

 43

 FINISHED 
Unmanned vehicles (UVs) now play an increasing role in Public Protection and Disaster Relief (PPDR) missions such as border surveillance, cropping monitoring or local law enforcement. However, fast location of isolated people in the case of natural or man-made disasters still continues to be a crucial and arduous task.MOBNET will design a Search and Rescue (SAR) system for the location of isolated ...
Read Project

 6

 FINISHED 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Read Project

 34

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
The poor condition of sanitation and wastewater management in India (as in many Asian countries) is well documented and has recently led the Asian Development Bank to call for a revolution in wastewater management across Asia. Conventional, centralized approaches have failed in many areas and will hardly be able to solve potential problems in rural, hilly and rapidly developing urban areas in Indi ...
Read Project

 10

 FINISHED 

ERTMS on SATELLITE – Enabling Application Validation (ERSAT EAV)

Start date: Feb 1, 2015, End date: Jan 31, 2017,

The main ERSAT EAV objective is to verify the suitability of EGNSS (including EGNOS and Galileo early services) for safety railway application, in particular in regional lines scenario, for which a safe localization of the trains, based on satellite technologies, will be defined and developed, leading the way for the harmonization with the European ERTMS standard, by implementing the solution on ...
Read Project

 14

 FINISHED 
The TEMGIR project is for the design and development of Thermal and Electrical Mock-ups for the validation of the thermal behaviour in the electrical air systems architecture at aircraft level.TEMGIR will provide a thermal model of an aircraft with both electrical and thermal behaviour, which will be able to develop any relevant condition and scenarios within the different flight phases. The TEMGI ...
Read Project

 4

 FINISHED 

NET SHAPE MANUFACTURE OF Ni SUPERALLOY ENGINE CASING (NESMONIC)

Start date: Apr 15, 2013, End date: Apr 14, 2016,

This response to the call for proposals under the Clean Sky Joint Undertaking to manufacture static engine components from IN718 using Net Shape Hot Isostatic Pressing of powder (NSHIP) involves 3 partners with complementary expertise in the areas required to undertake the work including powder characterisation; NSHIP and modelling; low cost tooling, as well as microstructural and property assessm ...
Read Project

 4

 FINISHED 

ETCS Advanced Testing and Smart Train Positioning System (EATS)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

...cteristics to overcome these challenges: world class organizations with successful previous experiences (e.g. CEIT coordinates [TREND], NSL participated in [GRAIL]); it involves technology providers (CEIT, FhG), subsystem integrator (INT), service providers (NSL, ESOL) and Notified Body (CETREN). Finally, the consortium has a small size to eliminate inefficiencies and work redundancies typical fro ...
Read Project

 9

 FINISHED 

Cost effective Direct to Eye prosthesis SMART Guidance System (D2EYE)

Start date: Feb 1, 2014, End date: Jan 31, 2016,

Approximately 800,000 hip operations are performed annually in Europe. In 56% of these operations, the components, in particular the cup, are not aligned correctly; this misalignment alters the biomechanics of the system, such that excessive wear of the cup occurs. The subsequent reduction in implant lifespan will affect ~450,000 European citizens, an average of 30,000 per year. In financial terms ...
Read Project

 11

 FINISHED 

Eddy CUrrent Brake Compatibility (ECUC)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

The ECUC (Eddy-Current Brake Compatibility) project's objective is to prove that linear eddy-current brake (ECB) is a very effective and applicable solution for increasing the braking capacity of new high speed trains and solving the concerns raised by infrastructure managers by proposing concrete and realistic solutions to overcome the drawbacks that ECB have experienced on some lines.This propos ...
Read Project

 9

 FINISHED 
"The OPTI-VFA project focuses on improving the reliability, efficiency and profitability of AD processes by novel process monitoring and controlling tools. The main emphasis in the project will be in the development of production of VFA (Volatile Fatty Acids) as a route to bio-based materials, i.e. so-called VFA platform. In the VFA platform, the real time monitoring of VFA production will be of f ...
Read Project

 12

 FINISHED 

lanning sustainable regional-Urban Mobility in the Alpine Space (PUMAS)

Start date: Jun 30, 2012, End date: Jun 29, 2015,

Alpine Space cities face common urban mobility challenges which call for innovative and cost-effective mobility solutions. PUMAS offers these solutions: It coordinates the development of the sustainable regional-urban mobility planning (SUMP) concept which the European Commission strongly promotes and, in its 2011 Transport White Paper, even suggests as a mandatory approach. The PUMAS partnership ...
Read Project

 11

 FINISHED 
"Space heating accounts for more than 50% of the energy consumption of public & residential buildings, and reduction of this energy demand is a key strategy in the move to low energy/low carbon buildings. The careful management of air flow within a building forms part of this strategy through the control of inlet fresh air and exhaust air, maximising air re-circulation, and minimising the amount o ...
Read Project

 9

 FINISHED 
"Nowadays most of the EU countries treat practically the totality of the volume of urban waste water (WW) generated. However, a deep look at the performance of most of the existing wastewater treatment facilities (WWTP) evidences that significant steps forward can still be given in terms of effluent quality, process robustness and operational costs.One of the main technical limitations for optimiz ...
Read Project

 10

 FINISHED 
Visually disabled people have striking needs for trustful navigation systems enabling for efficient mobility services, mainly considering safety and autonomy. In this context, satellite positioning and navigation technologies available are being implemented in innovative personal navigation devices. But existing products and solutions based on GNSS fail because they lack accuracy and integrity, th ...
Read Project

 7

 FINISHED 
Meter-ON is a coordination and support action to steer the implementation of smart meteringsolutions throughout Europe by effectively collecting the most successful experiences in thefield and highlighting the conditions that enabled their development. On the basis of thelessons learned the goal of Meter-ON will be to provide to any stakeholder an openinformation platform with clear recommendation ...
Read Project

 5

 FINISHED 

Wireless Smart Distributed end System for Aircraft (WILDCRAFT)

Start date: Oct 1, 2012, End date: May 31, 2014,

"WILDCRAFT proposes the design, development and testing of a proof-of-concept demonstrator of a Wireless Sensor Network (WSN) aimed at applications in the aerospace industry. The continuous pressure on aircraft manufacturers to produce better and more secure aircrafts has led to increasing costs in maintenance and monitoring procedures that are being performed at given time intervals to assess the ...
Read Project

 3

 FINISHED 
"The call SST.2011-2.5.1 in the transport topic, enclosed in the area of Interoperability and Safety proposed the “Harmonisation of freight and passenger Rolling Stock approval tests for electromagnetic compatibility (EMC)”.In that context, TREND project has the objective to progress beyond the state of the art, addressing this situation by means of the design of a test setup and a test procedure ...
Read Project

 8

 FINISHED 
Specyficzne warunki klimatyczne (duże opady śniegu) i degradacja infrastruktury technicznej na całym pograniczu polsko-słowackim powodują podobne zagrożenia bezpieczeństwa. Mosty, hale przemysłowe czy np. magazyny narażone są na drgania i przeciążenia, powodujące m.in. niebezpieczeństwo ich zawalenia (np. pod naporem śniegu). Dotychczas na pograniczu nie monitorowano zagrożeń konstrukcji wielkoga ...
Read Project

 3

 FINISHED 
"New aeronautical engine designs strive the manufacturers to use new processes which permit to add specific features such as stiffeners, often leading to weight or lead time saving. Electron Beam Melting (EBM) process is potential candidate but is not yet fully understood and controlled because of its lack of maturity. Case studies show that the waste of raw material is reduced by up to 40% when u ...
Read Project

 3

 FINISHED 
Energy storage is recognised as a key element for energy networks in the near future. Regarding short-term power delivery and high duty cycle applications, such as stabilization of grids, traction networks and drive-trains of hybrid or full-electric vehicles, it is widely accepted that the use of energy storage systems (ESS) can lead to energy savings. This kind of networks needs ESS capable of st ...
Read Project

 7

 FINISHED 

Intelligent Sanitary Unit for Disabled and Elderly People (ISU-DEP)

Start date: Nov 1, 2010, End date: Apr 30, 2013,

"The project ISU-DEP aims at increasing autonomy of older people and bedridden persons, supporting care givers and restoring dignity and self-esteem in the most sensitive area of personal hygiene. The project will develop a mobile system of sanitary components for improving hygiene, care-provision and quality of life consisting of four main components: • A mobile bed-side toilet (commode) which of ...
Read Project

 6

 FINISHED 
The project uttermost objective is to foster and strengthen the primacy of Future European Manufacturing by defining the next generation Virtual Factory Framework. The VFF will promote major time and cost savings while increasing performance in the design, management, evaluation and reconfiguration of new or existing facilities, supporting the capability to simulate dynamic complex behaviour over ...
Read Project

 29

 FINISHED 
Land Use and Land Cover are amongst the most important geographic information themes today because they are essential for many applications areas.Unfortunately, despite the initiatives which have already been carried out and others that are being carried out at present moment, there is no valid data harmonization model for the Land Cover and Land Use datasets, taking into account both the data cat ...
Read Project

 9

 FINISHED 

Knowledgable SErvice Robots for Aging (KSERA)

Start date: Feb 1, 2010, End date: Jan 31, 2013,

We propose research and development of a Knowledgeable Service Robot for Aging (KSERA) that will serve several related purposes for elderly persons in general and those with pulmonary disease in particular. Specifically KSERA provides (1) a mobile assistant to follow and monitor the health and behavior of a senior, (2) useful communication (video, internet) services including needed alerts to care ...
Read Project

 7

 FINISHED 

Long Lasting Memories (LongLastingMemories)

Start date: Jun 1, 2009, End date: Mar 31, 2012,

Description A unified solution for cognitive and physical health and autonomous living for senior citizens.Long Lasting Memories (LLM) is an EU project aiming at an integrated ICT platform which combines state-of-the-art cognitive exercises with physical activity in the framework of an advanced ambient assisted living environment. By comb ...
Read Project

 12

 FINISHED 
Conocimiento e innovación son motores del crecimiento económico sostenible. Generar un entorno innovador que integre a personas y organizaciones, productos y servicios, procesos y mercado, son factores clave para mejorar la calidad de vida y crear empleo. El proyecto pretende crear una mayor vinculación entre centros tecnológicos y empresas para impulsar una economía del conocimiento, y un mercado ...
Read Project

 3

 FINISHED 

Digital Humans for Ergonomic design of products (DHErgo)

Start date: Sep 1, 2008, End date: Nov 30, 2011,

Ergonomic evaluation of a product requires building up a physical mock-up or a prototype, having a group of experts or a representative sample of users to test it and to give their discomfort feeling. This is an expensive and time-consuming process. Digital Mock-Ups together with Digital Human Models, are more and more used in the early phase of product design for reducing the product development ...
Read Project

 11

 FINISHED 

Cezhraničná Poľsko - slovenská inovačná a technologická sieť

Start date: Aug 31, 2009, End date: Oct 30, 2011,

Hlavným cieľom projektu Poľsko - slovenská inovačná a technologická sieť (akronym CITNET) je vytvorenie funkčnej Poľsko – slovenskej inovačnej a technologickej siete, ktorá bude integrovať spoločné poznatky a znalosti a rozvíjať tak súčasné inovačné trendy v Európskej únii. Projekt Poľsko - slovenská technologická a inovačná sieť bude výrazným prínosom pre sociálny a ekonomický rozvoj cezhraničné ...
Read Project

 5

 FINISHED 

CERADA – Central European Research And Development Area (CERADA)

Start date: Mar 1, 2009, End date: Apr 30, 2011,

"Partners in the project represent and focus on the strong industrial sector in the cross-border region of Czech and Slovak Republic nad Poland, which is transport devices sector (automotive and aircraft) with a strong background in material research. The purpose of the project is: - The recognized need of more effective supporting system of the R&D sector, focused on the significant, traditional ...
Read Project

 13