Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene...
Read Project

 37

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell...
Read Project

 27

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 

AffordabLe LIghtweight Automobiles AlliaNCE (ALLIANCE)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

6 of the European carmakers (DAIMLER, VW, TME, CRF, VOLVO, Opel), under the coordination of EUCAR, have joined forces to commonly address the high cost issue of innovations in vehicle lightweighting, having identified it as the major bottleneck towards their implementation in vehicle series and mass production. The AffordabLe LIghtweight Automobiles AlliaNCE (ALLIANCE) has the ambition to develop ...
Read Project

 17

 FINISHED 

aDverse wEather eNvironmental Sensing systEm (DENSE)

Start date: Jun 1, 2016, End date: May 31, 2019,

Current driver assistance systems are not all-weather capable. They offer comfort and safety in sound environmental conditions. However, in adverse weather conditions where the accident risks are highest they malfunction or even fail. Now that we are progressing towards automated cars and work machines, the requirements of fully reliable environment perception are only accentuated. The project is ...
Read Project

 16

 FINISHED 

PROactive Safety for PEdestrians and CyclisTs (PROSPECT)

Start date: May 1, 2015, End date: Oct 31, 2018,

The past decade has seen significant progress on active pedestrian safety, as a result of advances in video and radar technology. In the intelligent vehicle domain, this has recently culminated in the market introduction of first-generation active pedestrian safety systems, which can perform autonomous emergency braking (AEB-PED) in case of critical traffic situations. PROSPECT will significantly ...
Read Project

 18

 FINISHED 

Training goes Global

Start date: Oct 1, 2016, End date: Sep 30, 2018,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int...
Read Project

 11

 FINISHED 

Hydrogen For All of Europe (HY4ALL) (HY4ALL)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

"Despite major technological development and the start of commercial deployments of the fuel cells and hydrogen technology, the public awareness of FCH technologies has lagged behind this technical progress so far, restricting the appetite of potential customers and risking a lack of support from policymakers. To address this challenge, a consortium of leading experts has come together, combining ...
Read Project

 13

 FINISHED 

AUTomotive deRivative Energy system (AutoRE)

Start date: Aug 1, 2015, End date: Jul 31, 2018,

"The overall aim is to create the foundations for commercializing an automotive derivative fuel cell system in the 50 to 100 kW range, for combined heat and power (CHP) applications in commercial and industrial buildings. More specifically, the project has the following objectives:• develop system components allowing reduced costs, increased durability and efficiency • build and validate a first...
Read Project

 7

 FINISHED 

Looking at Europe II. More in action!

Start date: Jun 1, 2016, End date: May 31, 2018,

Student exchange project between German students and students of the institutions involved presented as a consortium. The partners are:* Salvador Allende Vocational Training School from Fuenlabrada. As coordinator of the Association. Brings experience from 2013 in European programs and its coordinator since 2011 in the exchange project with Mercedes Benz.* Humanejos Vocational Training School from...
Read Project

 2

 FINISHED 
PROJECT BACKGROUND:North Karelia municipal education and training consortium development work is based on 2016-2019 development strategy. International operations are specifically aimed at promoting the effectiveness of developing student's skills for working life, and contribute that the student will find his/her position in the labor market.By enabling staff´s and students mobility international...
Read Project

 27

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc...
Read Project

 47

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda...
Read Project

 13

 FINISHED 
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving the improvement of perception, decision and planning under adverse conditions is one of the main challenges to be addressed. Robus...
Read Project

 15

 FINISHED 
The ECOCHAMPS project addresses topic GV-4-2014, Hybrid Light and Heavy Duty Vehicles. The work will, in a single coordinated project, address all aspects of this topic and will be conducted by 26 partners representing the European automotive industry (OEMs (EUCAR), suppliers (CLEPA), ESPs and universities (EARPA)) including members of ERTRAC and EGVIA. The objective is to achieve efficient, compa...
Read Project

 28

 FINISHED 

Heavy Duty Gas Engines integrated into Vehicles (HDGAS)

Start date: May 1, 2015, End date: Apr 30, 2018,

The overall objective of HDGAS is to provide breakthroughs in LNG vehicle fuel systems, natural gas and dual fuel engine technologies as well as aftertreatment systems. The developed components and technologies will be integrated in up to three demonstration vehicles that are representative for long haul heavy duty vehicles in the 40 ton ranges. The demonstration vehicles will: a) comply with the ...
Read Project

 19

 FINISHED 

Hydrogen For Innovative Vehicles (HYFIVE)

Start date: Apr 1, 2014, End date: Sep 30, 2017,

HyFIVE is an ambitious European project including 15 partners who will deploy 185 fuel cell electric vehicles (FCEVs) from the five global automotive companies who are leading in their commercialisation (BMW, Daimler, Honda, Hyundai and Toyota).Refuelling stations configured in viable networks will be developed in three distinct clusters by deploying 6 new stations linked with 12 existing stations...
Read Project

 17

 FINISHED 

VILLAREJO IN EUROPE II

Start date: Sep 1, 2015, End date: Aug 31, 2017,

Nuestra Señora de la Victoria de Lepanto High School is located in Villarejo de Salvanés, Madrid, Spain. It is a small school which provides educational range of modules to the nearest and mainly rural population. Agriculture is the main activity in this location and the industrial sector is reduced. The school offers a range of educative modules related with Transport and Vehicle Maintenance, Me...
Read Project

 3

 FINISHED 

Formación Profesional en el Espacio Laboral Europeo. Segunda Edición

Start date: Sep 1, 2016, End date: Aug 31, 2017,

This second edition of the Vocational Training in the European workplace project, continues with the consortium model. The consortium is still coordinated by the Regional Centre for Innovation and Training “Las Acacias”, hereinafter CRIF Las Acacias, and there are nine officially credited Vocational Training Schools of the Autonomous Community of Madrid taking part . The realization of the plann...
Read Project

 17

 FINISHED 
Today trucks are designed and optimised towards a limited variance set of usage and for maximum payload. Future trucks-trailers are easily adaptable for each freight, load and mission. And, in the operation phase, the vehicle combination automatically adjusts itself to the actual driving environment (i.e. traffic situation, topology, and payload). This option has large potential to contribute to t...
Read Project

 14

 FINISHED 
AdaptIVe will enhance the performance and improve the acceptance of automated driving of cars and trucks. The project develops new and integrated automated functions to improve traffic safety by minimizing the effects of human errors and to enhance traffic efficiency by smoother flows and reduced congestion.The approach is based on a shared control concept, assuring proper collaboration between th...
Read Project

 32

 FINISHED 

Training goes Global

Start date: Jun 1, 2015, End date: May 31, 2017,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int...
Read Project

 10

 FINISHED 
FOT-Net Data is a Support Action for international co-operation that targets efficient sharing and re-use of global data sets. It continues European and international networking activities in the domain of Field Operational Tests (FOT).During the lifetime of the different FOTs carried out both at national and European levels, there is a crucial need for a networking platform allowing individual FO...
Read Project

 11

 FINISHED 

Analysis of MassIve Data STreams (AMIDST)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

The objective of AMIDST is to develop a toolbox providing a scalable framework that facilitates efficient analysis and prediction based on information captured in streaming data. The work includes developing and scaling up existing algorithms in order to make the AMIDST toolbox flexible and versatile enough as to cope with the needs and requirements of a wide variety of applications. The toolbox w...
Read Project

 8

 FINISHED 
The RobustPlaNet project aims at developing an innovative technology-based business approach that will drastically change the current rigid supply chain mechanisms and the current product-based business models into collaborative and robust production networks able to timely deliver innovative product-services in very dynamic and unpredictable, global environments. This technology-based business ap...
Read Project

 12

 FINISHED 
Modern societies are eagerly looking for the integration of mobility and their urban living area to enable reliable and safe transportation, better efficiency and cost, comfort and low emissions for the environment. The trends are obvious, however, providing a hybrid/electrical car is only one part of the full picture. The "standard" customer is still very reluctant to buy a full electrical vehicl...
Read Project

 17

 FINISHED 
New methods and tools for the design of production systems should be used in order to provide advanced services to the industry shop-floor personnel in terms of ergonomics, safety, efficiency, complexity management and work satisfaction. In the field of planning and verifying human-centred assembly workplaces, available simulation and sensor technologies should be further improved. In many cases,...
Read Project

 9

 FINISHED 
By bringing together 21 partners including 7 major carmakers, 7 major suppliers, 2 SME's and 5 academia / research centres, ALIVE will develop directly exploitable knowledge on materials and design concepts which offer a high potential for significantly reducing the weight of vehicles for affordable application to high productions volumes, focusing on next generation Electric Vehicles (EVs).Specif...
Read Project

 26

 FINISHED 

Automation and Robotics for EUropean Sustainabile manufacturing (AREUS)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

European Factories of the Future will have to be smart and green:• SMART: high performance, reconfigurable, adaptive and evolving factories based on robotic technologies ,• GREEN: reduced ecological footprint through a more efficient use, at factory level, of material and energy resources.Industrial Robotics is the strategic technology needed to keep the European Manufacturing leading edge, unfort...
Read Project

 12

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr...
Read Project

 70

 FINISHED 

Austauschprogramm für Auszubildende und Ausbilder

Start date: Jul 1, 2014, End date: Jun 30, 2016,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int...
Read Project

 5

 FINISHED 
ecoDriver addresses the need to consider the human element when encouraging "green" driving, since driver behaviour is a critical element in energy efficiency. The focus of the project is on technology working with the driver. The project aims to deliver the most effective feedback to drivers on green driving by optimising the driver-powertrain-environment feedback loop. It will carry out a substa...
Read Project

 16

 FINISHED 

DEvelopment platform for Safe and Efficient dRiVE (DESERVE)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

According to a recent forecast published by ABI Research , a fast growth of the market of Advanced Driving Assistance Systems (ADAS) is foreseen in the next five years. For example, in 2016 the overall annual market for Lane Departure Warning systems is expected to reach 22 million units/year (corresponding to 14,3 billion dollars). This market growth will be possible only through the reduction of...
Read Project

 28

 FINISHED 

CO2 REduction for long distance transport (CORE)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

"The project proposal CORE (CO2 REduction for long distance transport) is a collaborative large-scale integrating project for a call within FP7-SUSTAINABLE SURFACE TRANSPORT (SST)-2011-RTD-1. The project consortium consists of three truck manufactures in Europe, Volvo, Daimler and IVECO, together with 13 other partners in the automotive industry and universities.The objective is to demonstrate a s...
Read Project

 16

 FINISHED 

Replacement and Original Magnet Engineering Options (ROMEO)

Start date: Dec 1, 2012, End date: Nov 30, 2015,

Permanent magnets are vital components in an enormous number of domestic and industrial devices, and they are particularly crucial within the rapidly-developing renewable energy sector, where the motors for electric vehicles and the generators in wind turbines require strong magnets with the ability to operate at temperatures well over 100°C. Currently, these magnets are based on the rare earth el...
Read Project

 14

 FINISHED 
PHAEDRUS addresses the complete scope and objectives of Topic SP1-JTI-FCH.2011.1.8. A new concept and new technologies for a hydrogen retail refuelling system are developed.The major objective is to develop and validate a new concept for 70 MPa hydrogen refuelling retail stations by showing the applicability of electrochemical hydrogen compression technology in combination with a PEM electrolyser,...
Read Project

 10

 FINISHED 
Nowadays, mobile Internet is available almost everywhere. Nevertheless, the impact of this "ubiquitous Web access" has not arrived at road user information systems with a few exceptions for navigation systems or traffic monitoring. Making full use of the Internet availability can enable a whole range of new services and apps for road users, helping them to make their journey safer, more comfortabl...
Read Project

 15

 FINISHED 
"MATISSE aims to make a significant step forward in the capability of the automotive industry to model, predict and optimise the crash behaviour of mass produced Fibre Reinforced Polymer (FRP) composite structures, which will be extensively used in Alternatively Powered Vehicles. The ability to investigate crashworthiness of FRP vehicle structures by numerical simulation is crucial for these light...
Read Project

 11

 FINISHED 
In the next 20 years the number of small and light-weight full electric vehicles will substantially increase especially in urban areas. These Small Electric Vehicles (SEVs) shows distinctive design differences compared to the traditional car (e.g. no bonnets, vertical windscreens, outstanding wheels). Thus the consequences of impacts of SEVs with vulnerable road users (VRU) and other (heavier) veh...
Read Project

 11

 FINISHED 

Best Training for Green and Silent Mobility (GRESIMO) (GRESIMO)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

"Engineering for future mobility must be inspired by ecology and economy to enable green and silent vehicles. Current university based education is focusing on classical fields like mechanical engineering on one side with some aspects of Noise, Vibration & Harshness (NVH) and Light Weight Design (LWD) or like electrical engineering covering aspects of “Electrification” & “Hybridisation” on the oth...
Read Project

 9