Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene...
Read Project

 37

 FINISHED 
“Bringing flexible organic electronics to pilot innovation scale” (PI-SCALE) is a highly needed response to bridge the gap which exists today between promising laboratory scale results of highly efficient flexible OLED modules and mass manufacturing of high value-added products. The project will integrate existing European infrastructures into a “European flexible OLED pilot line”, which will oper...
Read Project

 14

 FINISHED 

PROactive Safety for PEdestrians and CyclisTs (PROSPECT)

Start date: May 1, 2015, End date: Oct 31, 2018,

The past decade has seen significant progress on active pedestrian safety, as a result of advances in video and radar technology. In the intelligent vehicle domain, this has recently culminated in the market introduction of first-generation active pedestrian safety systems, which can perform autonomous emergency braking (AEB-PED) in case of critical traffic situations. PROSPECT will significantly ...
Read Project

 18

 FINISHED 

MOVE - MObility to improVE 2016

Start date: Sep 1, 2016, End date: Aug 31, 2018,

The results of previous mobility projects in which many ATEC's trainees had the opportunity to have a formative experience at several Volkswagen Group industrial plants abroad, show clearly and unequivocally the advantages that this type of activities have for its participants and to others, that indirectly use their results.MOVE 2016 project is part of ATEC's innovation strategy and intends to co...
Read Project

 8

 FINISHED 

Pilot Optical Line for Imaging and Sensing (POLIS)

Start date: Jan 6, 2014, End date: Jan 6, 2018,

The KET pilot line project POLIS is aimed at maintaining and furthering the innovation capability of CMOS image and optical sensors in Europe. An existing ST CMOS high volume production line, unique in Europe, will serve as the basis of the proposed project. The strategy behind POLIS lies in the development of specific technological modules and to implement them at pilot line level on the existing...
Read Project

 20

 FINISHED 

MOVE 2015 - MObility to ImproVE 2015

Start date: Jun 1, 2015, End date: May 31, 2017,

The results of previous mobility projects in which many ATEC's trainees had the opportunity to have a formative experience at several Volkswagen Group industrial plants abroad, show clearly and unequivocally the advantages that this type of activities have for its participants and to others, that indirectly use their results. MOVE 2015 project is part of ATEC's innovation strategy and intends to c...
Read Project

 6

 FINISHED 

Nová země, nová zkušenost aneb jak se vyrábí auta u sousedů 2

Start date: Jun 1, 2015, End date: May 31, 2017,

The "New country, new experience – how cars are produced in the neighbouring countries 2" project has evolved on the basis of fulfilling the 2014-2018 school strategy. Among the main goals are above all gaining new experience and development of current specialist knowledge not only of the students but also of the teachers. Another goal of this project is internationalization of students and teac...
Read Project

 8

 FINISHED 
High Pressure Die Casting (HPDC) of light alloys and Plastic Injection Molding (PIM) are two of the most representative large-scale production-line in manufacturing field, which are strategic for the EU-industry largely dominated by SMEs. Due to the high number of process variables involved and to the non-sinchronisation of the process control units, HPDC and PIM are most "defect-generating" and ...
Read Project

 18

 FINISHED 
With the mobility project "Workplace Europe - Practical Work-Experience and Job-Placement Intercurltural and Language Competencies IV", in cooperation with the Erasmus+, we are offering 55 interns the possibility of a three-month foreign-assignment with one of our european partner businesses, during the timeframe of July 2014 to June 2016. The interns offer business and technical backgrounds. The...
Read Project

 13

 FINISHED 

MOVE - MObility to improVE 2014

Start date: Sep 1, 2014, End date: May 31, 2016,

The results of previous mobility projects in which many ATEC's trainees had the opportunity to have a formative experience at several Volkswagen Group industrial plants abroad, show clearly and unequivocally the advantages that this type of activities have for its participants and to others, that indirectly use their results. MOVE 2014 project is part of ATEC's innovation strategy and intends to c...
Read Project

 4

 FINISHED 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq...
Read Project

 25

 FINISHED 
The FlowAirS proposal is collaborative training research network. It will be focused on the generation, propagation and reduction of sound in flow ducts for transport, buildings and power generation. There is a real need for a European-wide training in this field: the FlowAirS general objective is to train by research a new generation of young researchers with multi-disciplinary skills and able to...
Read Project

 12

 FINISHED 

Nová země, nová zkušenost aneb jak se vyrábí auta u sousedů

Start date: Aug 25, 2014, End date: Aug 24, 2015,

The project was called "New country, new experience, or how to make cars with neighbours" and was based on the school strategy for the years 2014-2018. The main objective of the project was to create new professional competencies and enhance new ones for 23 students in the fields of electronical engineering mechanic, electrician - heavy, machinist and Autotronik. Another objective was the intern...
Read Project

 5

 FINISHED 
The objective of the DRIVE C2X Integrated Project is to carry out comprehensive assessment of cooperative systems through Field Operational Tests in various places in Europe in order to verify their benefits and to pave the way for market implementation. This general objective is split into four major technical objectives:\n•Create a harmonised Europe-wide testing environment for cooperative syste...
Read Project

 36

 FINISHED 

Advanced Intelligent Machine Adaptive Control System (AIMACS)

Start date: Aug 1, 2010, End date: Jul 31, 2013,

"Current machining technologies and practices have many inefficiencies. Numerous unpredictable machining variables often cause overload and unstable conditions and catastrophic damage to the machine tool system. In addition, this results in frequent disruptions in production that can often be excessive, leading to considerable losses in productivity, capital and energy resources. In an effort to p...
Read Project

 10

 FINISHED 
The European automotive industry and their component manufacturers are facing the biggest shift in their history. The transition from combustion engines to electric drives (e-vehicle) requires pro-duction facilities that can initially deal with low and varying production volumes and can quickly be up-scaled to large numbers at need. LOCOBOT provides a solution to this problem by developing a flexi...
Read Project

 10

 FINISHED 
The project uttermost objective is to foster and strengthen the primacy of Future European Manufacturing by defining the next generation Virtual Factory Framework. The VFF will promote major time and cost savings while increasing performance in the design, management, evaluation and reconfiguration of new or existing facilities, supporting the capability to simulate dynamic complex behaviour over ...
Read Project

 29

 FINISHED 

Implementation of Virtual Testing in Safety Regulations (IMVITER)

Start date: Apr 1, 2009, End date: Jun 30, 2012,

"Computer aided engineering is a routinely used technology for the design and testing of road vehicles, including the simulation of their response to an impact and the prediction of the risk of injuries sustained by the potential victims. But, so far, the release of a vehicle on the market still depends on the verification of the product compliance with safety standards through a series of type ap...
Read Project

 15

 FINISHED 
The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems.Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment ...
Read Project

 32

 FINISHED 

ONTOlogies meet business RULEs (ONTORULE)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

The objective of ONTORULE is to enable the right people to interact in their own way with the right part of their business application: different people with different requirements and background, ranging from business executives to IT developers, have to interact in different ways with different aspects of a business application, to use, control and manage it. We believe that this can be achieved...
Read Project

 9

 FINISHED 

PRE-DRIVE

Start date: Jul 1, 2008, End date: Sep 30, 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ...
Read Project

 27