Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Federation for FIRE Plus (Fed4FIREplus)

Start date: Jan 1, 2017, End date: Dec 31, 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Read Project

 24

 FINISHED 
End-user and societal acceptance is critical to the success of the IoT large scale pilots. U4IoT combines complementary RRI-SSH expertise encompassing social and economic sciences, communication, crowdsourcing, living labs, co-creative workshops, meetups, and personal data protection to actively engage end-users and citizens in the large scale pilots. It will: • Develop toolkit for LSPs end-user e ...
Read Project

 9

 FINISHED 

Facility for Large-scale Adaptive Media Experimentation (FLAME)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

The Future Media Internet (FMI) will be driven by evolving existing over-the-top (OTT) solutions towards a stronger integration with emerging programmable communication and computing infrastructures to address consumer demand for personalised, interactive, mobile and localised media experiences. Creating a trusted platform that brings together technology, creative sectors and consumers in the deve ...
Read Project

 11

 FINISHED 

Orchestration and Reconfguration Control Architecture (ORCA)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

ORCA offers experimentation facilities to promote wireless innovation in several market segments, including manufacturing, automotive industry, healthcare, ambient assistant living, public events, home automation, and utilities. Within the manufacturing market, for instance, application requirements vary from very low latency, up to real-time 3D video-driven interaction between collaborative robot ...
Read Project

 8

 FINISHED 
The QV-LIFT project aims at building the foundation of the Ground Segment Technology for the future Q/V band Terabit SatCom systems. This ambitious task will be undertaken developing core hardware and software technologies addressing urgent physical to network level needs. QV-LIFT intends to demonstrate a TRL6 for all the technologies developed and, significantly, integrating them in a realistic s ...
Read Project

 9

 FINISHED 
The main goal of the FIREHUB2020 project is to transform the current FIRE scenario into a dynamic, collaborative, and participatory Innovation ecosystem capable of more effectively supporting and coordinating activities across the whole FIRE/FIRE+ context. The main idea is to guarantee continuity by building on top of the results and major achievements previous FIRE CSAs (FIRE WORKS, FIRE STATION, ...
Read Project

 7

 FINISHED 

EU-China study on IoT and 5G (EXCITING)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

Europe and China are at the forefront of technological advances in areas related to the Future Internet (especially 5G and IoT). While both parties share common technological objectives, there is still room for improvement in what concerns bilateral co-operation. As a result, the main purpose of EXCITING is to support the creation of favourable conditions for co-operation between the European and ...
Read Project

 15

 FINISHED 

Bringing FIWARE to the NEXT step (FI-NEXT)

Start date: Dec 1, 2016, End date: Nov 30, 2018,

Digital technologies underpin innovation and competitiveness across a broad range of market sectors. A key technology to boost such innovation and competitiveness is represented by the full and wide adoption of Open Service Platforms. In fact, they will allow increased competition and market penetration because they should be built on top of royalty-free open specifications, adopting open source r ...
Read Project

 16

 FINISHED 

Creating high impact for CAPS (ChiC)

Start date: Jun 1, 2016, End date: Nov 30, 2018,

ChiC is a game-changing Coordination and Support Action aiming at maximizing the impact of the ICT-10 2015 projects and transforming CAPS in an Innovation Ecosystem. The consortium brings together well-experienced partners which can count on the lessons learned and the network acquired in on-going FP7 CSAs (in the CAPS field and beyond): this sound foundation will make us move the CAPS Programme o ...
Read Project

 3

 FINISHED 

A FIWARE-based SDK for developing Smart Applications (SmartSDK)

Start date: Sep 1, 2016, End date: Aug 31, 2018,

...nology (HOPU, UBI), and Future Internet researchers from Mexico (CECISE, CENIDET, INAOE) under the experienced guide of R&D consultancy specialist and key promoter of FIWARE internationalization (MARTEL) are a unique asset for ensuring SmartSDK success.
Read Project

 9

 FINISHED 
FIWARE Mexico aims at enhancing FIWARE-driven collaboration between EU and Mexico, based on the adoption, deployment and improvement of FIWARE in Mexico as a framework that will open up new horizons for future cooperation in the ICT domain. The Mexican FIWARE Lab node operated by INFOTEC is part of the FIWARE infrastructure, which facilitates the use of the FIWARE platform for local innovative pla ...
Read Project

 7

 FINISHED 

Scalable and Secure Infrastructures for Cloud Operations (SSICLOPS)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The SSICLOPS project will focus on techniques for the management of federated private cloud infrastructures, in particular cloud networking techniques (within software-defined data centres and across wide-area networks). Key deliverables from the project will include a meta data description language for workloads, resources and policies, a flexible scheduling system using meta data, workload-speci ...
Read Project

 14

 FINISHED 

architectuRe for an Internet For Everybody (RIFE)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

RIFE addresses the major societal challenge of providing affordable Internet access to those who cannot afford it by solving the technological challenge to increase the efficiency of the underlying transport networks and the involved architectures and protocols. The RIFE solution will harness unused transmission capacity, combined with placing content caches and service functionality closer to the ...
Read Project

 8

 FINISHED 

elastic WIreless Networking Experimentation (eWINE)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

The elastic Wireless Networking Experimentation (eWINE) research project will realize elastic networks that can scale to a high number of users in a short timespan through the use of an agile infrastructure (intelligent software and flexible hardware), enabling: (1) dynamic on-demand end-to-end wireless connectivity service provisioning, (2) elastic resource sharing in dense heterogeneous and smal ...
Read Project

 10

 FINISHED 

Euro-5G (EURO 5G)

Start date: Jul 1, 2015, End date: Sep 30, 2017,

The primary objective of the Euro-5g project is to facilitate effective and efficient co-operation and integration between all projects of the 5G-PPP, the European Commission, The 5G-Infrastructure Association, Networld2020 ETP, related projects from EUREKA, and related national initiatives to maximize the European momentum towards, and benefits from, the future 5G integrated, ubiquitous and ultra ...
Read Project

 10

 FINISHED 
ABSTRESS applies combined, integrated systems biology and comparative genomics approaches to conduct a comprehensive study of the gene networks implicated in the interaction of drought stress and Fusarium infection in legumes. It uses Medicago truncatula as a model to rapidly identify characteristics for introgression into elite pea varieties and a field test of their performance against existing ...
Read Project

 15

 FINISHED 

User-Centric Networking (UCN)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Description The UCN project introduces User Centric Networking, which is a communication new paradigm leveraging user information at large, to deliver novel user-centric connected media services.The explosion of information available online and the ubiquity of connected media devices are rendering existing content recommendation and conte ...
Read Project

 11

 FINISHED 
While several studies recognized Europe as a leader in different research fields and as valid competitor to other world areas in many research fields, the status of affairs as regards commercialization of research results is lacking beyond to benefit European industry and European citizens. In the last three years, for the first time in EU Framework Programmes, Enterprises and Research institution ...
Read Project

 7

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

EU CHINA future Internet common Activities and Opportunities (ECIAO)

Start date: Aug 1, 2013, End date: Jul 31, 2015,

In 2010 an EU-China expert group was established. The main area studied by this group was the "Internet of the Future", the "Internet of Things" and also the protocols to be defined and deployed. Particular attention was dedicated to IPv6 deployment as difficulties have been identified, both in Europe and in China. Societal aspects and cooperation in research were also addressed.The expert group m ...
Read Project

 7

 FINISHED 
CI-FIRE will support a broader and deeper coordination and integration of Future Internet Research Experimentation (FIRE) activities on EU and Member State level in order to enable the sustainable use of FIRE facilities.To this purpose, CI-FIRE will analyse the sustainability potential of European FIRE facilities, develop an innovation business framework template, and perform an analysis of the us ...
Read Project

 6

 FINISHED 

Leone: From global measurements to local management (LEONE)

Start date: Sep 1, 2012, End date: Apr 30, 2015,

The Leone project is a 30-month long STREP targeting "Future Networks" within the 7th Framework programme. The project addresses "Novel Internet architectures, management and operation frameworks".The goal of the Leone project is to research and develop an innovative network management framework that has two novelties:• It is focused on Quality of Experience: Probes sited alongside end use ...
Read Project

 10

 FINISHED 
SMEs are developing new applications and services, which could benefit from testing facilities. There are number of FIRE testbeds, which have been developed and are ongoing in the European research community. The goal of the FUSION project is to bring SMEs that have needs in testing new applications together with these FIRE testbeds. The FIRE facilities will at their turn benefit from the specific ...
Read Project

 4

 FINISHED 
The INFINITY Support Action will have a positive impact on the success of the FI-PPP programme. Through collaboration with organisations across Europe, INFINITY will capture and communicate information about available infrastructures and any interoperability requirements and issues. INFINITY will document any usage-related operational constraints and seek to identify and foster federation opportun ...
Read Project

 14

 FINISHED 
The future Internet will be characterised by a pervasive diffusion of devices with heterogeneous capabilities and resources. Users will carry personal mobile devices (smartphones, PDAs, cameras) bundling several wireless interfaces, supporting computationally intensive tasks, and powerful tools to produce multimedia content. Other types of devices with networking capabilities will be also availab ...
Read Project

 8

 FINISHED 
The Internet has evolved from a technology-centric core network to a user- and content-centric network that must support millions of users creating and consuming content. It must accommodate new services with new requirements and cope with heterogeneous network technologies. The momentum is moving toward the end user who is now capable of creating, storing, and delivering content and services. FIG ...
Read Project

 13

 FINISHED 
FIRE STATION provides the globally known FIRE (Future Internet Research and Experimentation) Initiative with an active hub that matches, guides and co-ordinates demand for - and offering of - experimentation facilities in the context of future networks and services. The heterogeneous and modular field of Future Internet Research and Experimentation with its national and international stakeholder g ...
Read Project

 8

 FINISHED 

IPv6 Deployment Support (6DEPLOY-2)

Start date: Sep 1, 2010, End date: Feb 28, 2013,

The overall purpose of the 6DEPLOY-2 project is to (i) support the deployment of IPv6, in Europe and developing regions, (ii) sustain the wealth of 6DEPLOY training material (e-learning package with subtitles in national languages, presentation material, exercises, etc.), and (iii) create a catalyst of global IPv6 expertise through the installation of strategically-placed sustainable IPv6 training ...
Read Project

 12

 FINISHED 

Networking innovations Over Virtualized Infrastructures (NOVI)

Start date: Sep 1, 2010, End date: Feb 28, 2013,

NOVI (Networking innovations Over Virtualized Infrastructures) research concentrates on efficient approaches to compose virtualized e-Infrastructures towards a holistic Future Internet (FI) cloud service. Resources belonging to various levels, i.e. networking, storage and processing are in principle managed by separate yet interworking providers. NOVI will concentrate on methods, information syste ...
Read Project

 13

 FINISHED 

European Biotechnologies Common Tools (BIO-CT)

Start date: Mar 1, 2009, End date: Aug 31, 2011,

"This project deals with the necessity in the EU to build a system that enables entrepreneurs or academia Technology Transfer Offices to achieve, in the best conditions of rapidity and cost effectiveness, the Industrial Proof of Concept (I-PoC) that enables a real economic valorization of Research achievements (Scientific Proof of concept-Sci-PoC). This early stage development is considered world ...
Read Project

 7

 FINISHED 

Nano Data Centers (NANODATACENTERS)

Start date: May 1, 2008, End date: Apr 30, 2011,

The project proposes a radical solution to data hosting and delivery for the Internet of the future. The current data delivery architecture is "network centric", with content stored in data centers connected directly to Internet backbones. This approach has multiple drawbacks among which complexity of deploying data centers, power consumption, and lack of scalability are the most critical. The ECH ...
Read Project

 11

 FINISHED 
The FEDERICA project has the following main objectives:- Support research experiments on new Internet architectures and protocols,- Create a versatile, scalable, European wide "technology agnostic" infrastructure, separated from the production networks, but with the possibility to interoperate,- Be open to host researchers hardware and applications,FEDERICA adopt the paradigm that "the infrastruct ...
Read Project

 20

 FINISHED 

IPv6 Deployment Support (6DEPLOY)

Start date: Mar 1, 2008, End date: Oct 31, 2010,

The purpose of the 6DEPLOY project is to support the deployment of IPv6 in (i) e-Infrastructure environments, thereby improving the use of existing research infrastructures for all fields of science and technology, (ii) FP7 projects, (iii) developing countries (Africa, Latin America, Asia and Eastern Europe), and (iv) more-commercial environments in Europe.6DEPLOY exploits the expertise and high q ...
Read Project

 13

 FINISHED 
GEYSERS vision is to qualify optical infrastructure providers and network operators with a new architecture, to enhance their traditional business operations. Optical network infrastructure providers will compose logical infrastructures and rent them out to network operators; network operators will run cost-efficient, dynamic and mission-specific networks by means of integrated control and managem ...
Read Project

 20