Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

SENSors and Intelligence in BuLt Environment (SENSIBLE)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The goal of this project is to develop novel information sensing research and innovation approaches for acquiring, communicating and processing a large volume of heterogeneous datasets in the context of smart buildings, by building an international, inter-disciplinary and inter-sectoral collaboration network through research and innovation staff exchanges and seamless exchange of ideas, expertise, ...
Read Project

 8

 FINISHED 

Knowledge FOr Resilient soCiEty

Start date: Oct 15, 2016, End date: Oct 14, 2019,

WBR needs to improve the resilience to hazards are recognized as needs for experts capable to improve regional capacity/cooperation in risk prevention and response.In 3-year 7 curricula will be modernized/developed/implemented at WBC HEIs:4 Disaster Risk Management & Fire Safety Engineering (DRM&FSE) academic master programs/modules (MP), DRM&FSE PhD program (DP), Protection Engineering vocational ...
Read Project

 14

 FINISHED 
The Transportation sector employs over 10 million persons in the EU today. At the same time, Transport is a social sector that is rapidly developing, changing and being influenced to the maximum extent by the development of automation, electrification and greening of transport, among others, thus facing problems in staffing its several domains with appropriate and qualified personnel. This fact, m ...
Read Project

 21

 FINISHED 
The ERAdiate project is aimed at unlocking and strengthening the research potential and promoting excellence of the University of Zilina (UNIZA) as well as of the Zilina region in the field of Intelligent Transport Systems (ITS). Systematic development of human resources, effective exploitation of unique research infrastructures and advanced transformations of the institution steered towards enhan ...
Read Project

 1

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Competency Based Inland Waterway Transport Education & Training

Start date: Sep 1, 2016, End date: Feb 28, 2019,

... be part of one of the multiplier events. The project partners will be:STC-Group: coordinatorCeronav, RomaniaUniversitatea din Craiova, Ingineria si Managementul Sistemelor Tehnologice - IMST, RomaniaZilinska Univerzita v Ziline, SlovakiaSchiffer-Berufskolleg RHEIN, GermanyStichting Dunamare Onderwijsgroep, Maritieme Academie Harlingen, NetherlandsFor the project management we will make use of Pr ...
Read Project

 6

 FINISHED 
The establishment of good governance will effectively secure the confidence of the industry to use the Interoperability Framework (IF) semantic technologies that will be established under the IP4 Shift2Rail program. The objective of the Governance of the IF for Rail and Intermodal Mobility (GoF4R) project is to define sustainable governance for the IF that will create the right conditions to intro ...
Read Project

 16

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Read Project

 34

 FINISHED 
For Europe to remain at the forefront of scientific and technological development, the current shortage of persons trained in these fields at secondary and higher education has to be overcome. While some progress has been made in increasing enrolment in Science, Technology, Engineering and Mathematics (STEM) programs in most European countries as stipulated by the Lisbon Objectives, the most press ...
Read Project

 7

 FINISHED 
The CaBilAvi consortium proposes a team of complementary skills, mixing experienced staff (GNSS Center of Excellence, Pildo Labs, Aeroclub de Sabadell, Amezen, CATC) with rightly connected partners in the EGNOS emerging countries (Univ of Prague, Univ of Zilina, VUD, F-Air, DSA) to increase the EGNOS usage rate by capacity building. Associated partners (CAA of Czech Republic, Slovakia, Bosnia-Herz ...
Read Project

 13

 FINISHED 

Innovative ICT Solutions for the Societal Challenges

Start date: Sep 1, 2015, End date: Aug 31, 2017,

Fast proliferation of information and communication technologies (ICT) caused certain negative side effects for society (e.g., increased energy usage or CO2 emmisions). However, "innovation in ICT"and especially "innovation with ICT" offer potential solutions for some of the biggest societal challenges (e.g., reports "Smart 2020" and "Smarter 2020" by Global e-Sustainability Initiative). These are ...
Read Project

 11

 FINISHED 

Green Solutions for Business and Industry

Start date: Sep 1, 2014, End date: Aug 31, 2017,

Social, political and economic demand for sustainable solutions forces organizations to balance the impact of their activities on environment and to develop sustainable strategies for their product and service offerings, supply chains, manufacturing and transport, among other business related issues. The project Green Solutions for Business and Industry aims at sharing good practices in Green Busi ...
Read Project

 6

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

VET learners and staff mobilities 2016

Start date: Jun 1, 2016, End date: May 31, 2017,

This project builds on a previous eight-year experience with mobility program at our school, through which students and staff get priceless professional and personal experience by completion of training program at the workplaces of our foreign partners.In this project, we plan to realize 47 mobilities, out of which 41 are designed for students and 6 for teachers. The project comes out of signific ...
Read Project

 11

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The RAIN vision is to provide an operational analysis framework that identifies critical infrastructure components impacted by extreme weather events and minimise the impact of these events on the EU infrastructure network. The project has a core focus on land based infrastructure with a much wider consideration of the ancillary infrastructure network in order to identify cascading and inter-relat ...
Read Project

 16

 FINISHED 

Air Transport Network – Next Generation (AIRTN-NEXTGEN)

Start date: Dec 1, 2013, End date: Nov 30, 2016,

The action will continue the network established under previous AirTN projects enlarging it to create a platform of networking and communication between national organisations and governmental institutions supporting research and innovation in the EU Member States and Associated Countries to the EU Framework Programme in the field of Aviation (e.g. Aeronautics and Air Transport - AAT).The successf ...
Read Project

 10

 FINISHED 

Regional Anaesthesia Simulator and Assistant (RASimAs)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Description RASimAs: Simulating anaesthesia outcomeA better outlook for those about to undergo surgery or have a child: The RASimAs project is working on a virtual reality simulator for doctors who are performing regional (or spinal) anaesthesia. This tool supports prediction and avoidance of possible complications during regional anaesth ...
Read Project

 11

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: May 31, 2016,

Erasmus+ mobility of students and teachers is an important part of activities of the University of Žilina (UNIZA) and it significantly contributes to internationalization of education and development of international cooperation of all university workplaces. The University management is interested in increasing the number of participants and quality in accordance with the Erasmus Charter, the Eras ...
Read Project

 1

 FINISHED 

Community Based Comprehensive Recovery (COBACORE)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

The Community Based Comprehensive Recovery (COBACORE) project aims to support common needs assessment and recovery planning efforts in complex multi-sectorial, multi-stakeholder crisis environments by building upon the community as an important source of information and capabilities. COBACORE aims to help bridge the so-called collaboration gap: failure of collaboration through insufficient informa ...
Read Project

 9

 FINISHED 
Circulating tumor cells (CTCs) are isolated tumor cells disseminated from the site of disease in metastatic or primary cancers, including breast, prostate, and lung cancer. CTCs can be identified and counted in the peripheral blood of patients. The biological analysis of CTCs using lab-on-chip technologies effectively diagnose the disease, determine personalized therapies, and adjust treatments in ...
Read Project

 1

 FINISHED 

European Transport Network Alliance (ETNA PLUS)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

The European Transport Network Alliance-ETNA Plus-is a 3 year coordination action that will build upon the activities and knowledge acquired in the ongoing project European Transport NCP Alliance (ETNA) with a new and wider approach reflecting the new political context and the priority given to Europe 2020 and to the Horizon 2020 objectives. It will also take advantage of the positive results of T ...
Read Project

 22

 FINISHED 

Bridging East West for Aerospace REsearch (BEWARE)

Start date: Oct 1, 2013, End date: Sep 30, 2015,

The BEWARE project has set a mission to increase the participation of the aeronautical organisations in Framework Programme which are not yet involved at the level of the size of their respective aeronautics sector. The general objective of the BEWARE project is to support potential coordinators and potential partners in future R&D projects in the field of Aeronautics and Air Transport of Horizon ...
Read Project

 12

 FINISHED 
The European Coordinating Body in Maths, Science and Technology Education (ECB) is a large-scale strategic response to the FP7 call to reinforce links between science education and science and technology careers in the private sector through reinforcing the partnership industry/education.The overall aim of the ECB is to increase young Europeans’ interest in mathematics, science and technology (MST ...
Read Project

 29

 FINISHED 

Air Transport Net (AirTN) (AirTN)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

The AirTN ERA-Net was established under FP6 as a network of Member States whose ministries and agencies manage public funded national research activities and programmes in Aeronautics and Air Transport. The results from AirTN in FP6 are prerequisites for the implementation of joint activities to enhance co-operation and coordination of national and regional research programmes. AirTN in FP7 will s ...
Read Project

 25

 FINISHED 

SEcurity REsearch Ncp network – phase 2 (SEREN 2)

Start date: Apr 1, 2011, End date: Dec 31, 2013,

"This proposal has been elaborated to continue the work undertaken in the former project SEcurity REsearch Ncp network – phase I (SEREN I), therefore the activities foreseen in this proposal are built upon the outcomes reached previously by the network.The Security National Contact Points (NCPs) network is still at an early stage and its members were quite recently appointed as NCPs, as compared t ...
Read Project

 28

 FINISHED 

Selective Antibodies Limited Immuno Assay Novel Technology (SALIANT)

Start date: Sep 1, 2010, End date: Dec 31, 2013,

SALIANT aims to develop a hand-held device for real-time analysis of trace levels of explosives, chemicals and drugs. The key innovation is a positive detection lateral-flow test for small molecules that is highly sensitive and simple to use making it ideally suited to deployment by First Responders at crime scenes and terrorist incidents. Lateral flow immunodiagnostics has long offered the promis ...
Read Project

 11

 FINISHED 
Project VEL-Wagon will be a key milestone for the efficiency of intermodal freight wagons since it will demonstrate that fewer elements and less dead weight can result in the same or even more transport output. Coherently, the project will design a versatile platform element for a multipurpose function and intermodal use that will bring about an important gain of flexibility, accessibility and eff ...
Read Project

 4

 FINISHED 

Behavioral Modeling for Security in Airports (BEMOSA)

Start date: Sep 1, 2009, End date: Nov 30, 2012,

"BEMOSA will contribute significantly to the overall European objective of eliminating hazards of hostile action in the air transport system. To do so it will develop a dynamic and realistic model of social behaviour and security decision making during security threats in airports. These objectives will be accompanied by advancing the state-of-the art in behavioural modelling by direct, multi-face ...
Read Project

 11

 FINISHED 

Transport Research Market Uptake (Market-up) (Market-up)

Start date: Oct 1, 2010, End date: Sep 30, 2012,

The concept behind this project becomes clearer when one understands the needs of a good market uptake of a research result. The purpose of a market uptake is to make research generated and scientific and technological developments accessible to private organisations. These stakeholders are then encouraged to develop the technology further into new products, processes, materials, or services that ...
Read Project

 9

 FINISHED 
Contribute to improve the competitivenes and performance of Czech – Slovakia region (Moravskosliezsky, Zilinsky) by advisory activities, education and exchange of knowledge between facults, business association and businessmans in support and introdution of new managing procedure and inovative processes ...
Read Project

 2

 FINISHED 
The aim of project is transfer of newest technologies from universities to small and midlle businessmans by creating common inivation center, which is created by background of both universities, which includes skilled experts Achievements: The main objective of the proj ...
Read Project

 2

 FINISHED 
Project is aimed to improve the protection of enivornemnt, follows the actions of consultation centres on two universities by actions aimed to aplication Achievements: The main objective of the project was to build on work already established counseling centers biomass ...
Read Project

 2

 FINISHED 

ASSET – Aeronautic Study on Seamless Transport (ASSET)

Start date: Jun 1, 2008, End date: Nov 30, 2011,

"Airport ground processes still conceal a considerable potential for improvement of time efficiency. Recent studies from Eurocontrol Performance Review Commission prove that insufficient punctuality in air transport results mainly from variance in off-block times. This leads to poor predictability and sizeable inefficiencies throughout the whole air transport system. Aim of proposed project is to ...
Read Project

 15

 FINISHED 

CERADA – Central European Research And Development Area (CERADA)

Start date: Mar 1, 2009, End date: Apr 30, 2011,

"Partners in the project represent and focus on the strong industrial sector in the cross-border region of Czech and Slovak Republic nad Poland, which is transport devices sector (automotive and aircraft) with a strong background in material research. The purpose of the project is: - The recognized need of more effective supporting system of the R&D sector, focused on the significant, traditional ...
Read Project

 13

 FINISHED 
Faced with a trend towards increasing freight transport, a global market that is constantly growing and the need for a resource-saving transport system, it is mandatory that European transport policy shifts the balance between all transport systems.`Intelligent MegaSwapBoxes for Advanced Intermodal Freight Transport’ (TelliBox) as an all-purpose loading unit will actively promote the EU’s objectiv ...
Read Project

 10

 FINISHED 
The strategic objective of the Star-Net transport is to increase the participation of surface transport-related SMEs in the surface transport programe. The aim of the Star-Net transport project is to be the first step towards the formation and development of a consolidated structure for support of SMEs in Europe for participation in Sustainable Surface Transport activities, building on the knowled ...
Read Project

 16

 FINISHED 
"U-STIR defines the know-how and technologies addressing Europe’s surface transport problems beyond 2050. A lead user centred approach will stimulate the development and capture of radical new technological concepts. Local connecting offices will analyse deficits and establish activities reaching out for fundamentally new solutions for the mobility and transport demands, improving environmental, e ...
Read Project

 8

 FINISHED 
Support the existing relations between universities in designing and assessment of wooden construction by improvement of educating system, exchange of skills of employees on conferences, seminars and workshops and by publishing of articles Achievements: For the research ...
Read Project

 2