Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Atmospheric oxygen (O2) measurements have proven to be one of the most powerful tools to study the carbon cycle at global scale, quantifying the carbon dioxide (CO2) sink of terrestrial ecosystems and oceans. At ecosystem level, O2 is closely related to CO2 through photosynthesis and respiration, and is influenced by sources of nitrogen during plant uptake. O2 thus carries valuable information abo ...
Read Project

 3

 FINISHED 
We propose a European Training Network that will provide a total of 540 ESR-months of training in Monte Carlo event generator physics and techniques, and related applications in experimental particle physics.Monte Carlo event generators are central to high energy particle physics. They are used by almost all experimental collaborations to plan their experiments and analyze their data, and by theo ...
Read Project

 9

 FINISHED 
Our society in Europe is still under prepared for the demographic changing situation of an ageing population which began several decades ago. This is visible in the age structure of the population and is reflected by the fact that the population aged 65 years and over is increasing in every European country. The growth in the elderly population may be explained by increased longevity, but at the s ...
Read Project

 19

 FINISHED 

Synaptic dysfunction in Neurodegenerative Diseases (SYNDEGEN)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

...o study synapses are localized in isolated groups in different locations in the EU. Similar questions are being asked about the mechanisms of synaptic dysfunction in AD, PD and HD, but no one university or company has sufficiently broad knowledge and technical expertise required to study and develop therapies for synaptic dysfunction in these disorders. This training programme will be implemented ...
Read Project

 8

 FINISHED 

Nano Voltage Sensors (NVS)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

To understand how the brain works, tools need to be developed that will allow neuroscientists to investigate how interactions between individual neurons lead to emergent networks. Towards this goal, we will develop targetable voltage sensing nanorods that self-insert into the cell membrane and optically and non-invasively record action potentials at the single particle and nanoscale level, at mult ...
Read Project

 4

 FINISHED 
This ITN will train 10 ESRs to meet the urgent need for translation of Auditory Neuroscience into commercial and pharmaceutical products to treat hearing disorders including tinnitus. Tinnitus is the debilitating perception of imaginary sound that is often associated with hearing loss. This Liaison in Scientific Training for European auditory Neuroscience (LISTEN) is a consortium of top hearing sc ...
Read Project

 9

 FINISHED 
The European chemical industry faces some very serious challenges if it is to retain its competitive position in the global economy. The new industries setting up in Asia and the Near East are based on novel process-intensification concepts, leaving Europe desperately searching for a competitive edge. The transition from batch to continuous micro- and milliflow processing is essential to ensure a ...
Read Project

 9

 FINISHED 
European forests are expected to provide a broad range of ecosystem services (ES). This capacity is however threatened by the uncertainties of climate change, the complex dynamics of evolving global markets and the pressures for increased use of bioenergy. Such challenges cannot be effectively addressed with an uncritical regional or national commitment to traditional forest management models (FMM ...
Read Project

 21

 FINISHED 
Patients with cardiovascular risk factors, e.g. hypertension and obesity are at risk of developing heart failure with preserved ejection fraction (HFpEF), a highly prevalent disease in the elderly, mostly women population. There is currently no specific, defined treatment for HFpEF, beyond control of risk factors. Activation of cardiac and vascular Beta3-adrenergic receptors (B3AR) represents a ne ...
Read Project

 15

 FINISHED 
Traumatic Brain Injury (TBI) is a major cause of death and disability, leading to great personal suffering to victim and relatives, as well as huge direct and indirect costs to society. Strong ethical, medical, social and health economic reasons therefore exist for improving treatment. The CENTER-TBI project will collect a prospective, contemporary, highly granular, observational dataset of 5400 p ...
Read Project

 44

 FINISHED 
NEUTRINOS and DARK MATTER (DM) are the most abundant and also the most elusive building-blocks of nature because of their tenuous couplings to the ordinary matter we are made of. Each particle has a mirror image with identical mass and opposite charge: its antiparticle. What is the essential nature of particles and antiparticles? This is a most fundamental open question in science. The laws of phy ...
Read Project

 13

 FINISHED 
SIGN-HUB aims to provide the first comprehensive response to the societal and scientific challenge resulting from generalized neglect of the cultural and linguistic identity of signing Deaf communities in Europe. It will provide an innovative and inclusive resource hub for the linguistic, historical and cultural documentation of the Deaf communities' heritage and for sign language assessment in cl ...
Read Project

 13

 FINISHED 

Innovative Management of Genetic Resources (IMAGE)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

This aim of IMAGE is to enhance the use of genetic collections and to upgrade animal gene bank management. IMAGE will better exploit DNA information and develop methodologies, biotechnologies, and bioinformatics for rationalising animal genetic resources. It will demonstrate the benefits brought by gene banks to the development of sustainable livestock systems by: enhancing the usefulness of genet ...
Read Project

 28

 FINISHED 
Abstract 9Neuroimaging (NI) has enormous potential to improve the clinical care of patients with psychiatric disorders, but has yet to deliver. The PSYSCAN project will address this issue directly by developing a NI-based tool that will help clinicians resolve key clinical issues in the management of patients with psychotic disorders. Clinicians will use the tool to assess patients with a standard ...
Read Project

 24

 FINISHED 
INTCATCH will instigate a paradigm shift in the monitoring and management of surface water quality that is fit for global waters in the period 2020-2050. INTCATCH will do this by developing efficient, user-friendly water monitoring strategies and systems based on innovative technologies that will provide real time data for important parameters, moving towards SMART Rivers. The business model will ...
Read Project

 23

 FINISHED 

InvisiblesPlus

Start date: Feb 1, 2016, End date: Jan 31, 2020,

NEUTRINOS (Ns) and DARK MATTER (DM) are the most abundant particles in the universe. Their couplings to ordinary matter are so tenuous that they remained undiscovered -invisible- until very recently. N masses and DM constitute the first evidence ever of physics beyond the Standard Model of particle physics. The path to build the New Standard Model must confront the fundamental nature of the partic ...
Read Project

 14

 FINISHED 

DARIAH ERIC Sustainability Refined (DESIR)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Europe has a long and rich tradition as a centre for the arts and humanities. However, the digital transformation poses challenges to the arts and humanities research landscape all over the world. Responding to these challenges the Digital Research Infrastructure for Arts and Humanities (DARIAH) was launched as a pan-European network and research infrastructure. After expansion and consolidation, ...
Read Project

 18

 FINISHED 

Advanced BiomEdical OPTICAL Imaging and Data Analysis (BE-OPTICAL)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

Biomedical imaging is a research field that is producing ground breaking scientific discoveries that enhance the health and life quality of European citizens and have a huge economic impact. In order to maintain Europe’s leading position in the field, it is crucial to invest in the people who will lead R&D, and to promote the academic-private sector partnerships that will transfer the novel techno ...
Read Project

 9

 FINISHED 
Ageing is the major risk factor for idiopathic PARKINSON'S DISEASE (PD), the first motor neurodegenerative disorder (in EU 1% in 65+; about 4% in 80+). The most recent conceptualizations of ageing and PD indicate that they share basic mechanisms, e.g. accumulation of senescent cells and propagation phenomena such as inflammaging mirrored in PD by neuro-inflammaging in brain that foster a prion-lik ...
Read Project

 10

 FINISHED 
Information access on the Internet is exploding. Usage is shifting to multimedia applications, social networking and IoE. Cellular networks are moving to the next generation. Networking technology is shifting towards virtualization, with SDN and NFV likely to change the infrastructure landscape. The cloud concept is transforming the Internet to a network of data centers, with a communication model ...
Read Project

 7

 FINISHED 
The current healthcare systems are built around the traditional paradigm of patients suffering from a single acute illness. They are therefore largely unprepared to face the increasing demands for health services arising from the expansion of an older population with specific medical needs related to multiple chronic disorders. As a consequence, the medical conditions of a large and growing seg ...
Read Project

 27

 FINISHED 
...s multicentre clinical trial and assess our innovative therapeutic concept in this deadly disease. Our consortium consists of national clinical trial groups in gynaecological oncology and high-volume University centres as well as noted p53 scientists and 3 innovative SMEs. Since ovarian cancer is defined as a rare cancer a scale at the European level is crucial for the planned clinical trial."
Read Project

 20

 FINISHED 
Traditional valorisation approaches focus on linear processes: from academia to society. In order to bring valorisation to a higher level, all relevant actors need to cooperate in an equal setting: co-creation. Co-creation transcends boundaries, but it does not happen naturally. Therefore, the ACCOMPLISSH consortium, consisting of 14 universities from 12 countries (representing all the sub discipl ...
Read Project

 15

 FINISHED 
In 2013, as a response to rising inequalities, poverty and distrust in the EU, the Commission launched a major endeavour to rebalance economic and social policies with the Social Investment Package (SIP). RE-InVEST aims to strengthen the philosophical, institutional and empirical underpinnings of the SIP, based on social investment in human rights and capabilities. Our consortium is embedded in th ...
Read Project

 19

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Read Project

 39

 FINISHED 

Network for Cloud Computing Eco-System (CleanSky)

Start date: Sep 1, 2014, End date: Aug 31, 2018,

With the increasing demand for cloud computing services and rapid development and advances in data center techniques, cloud computing is moving from small data centers towards a large scale, highly efficient new computing infrastructure with low cost. The proposed CleanSky network is intended to provide a stimulating and structured platform for the training of young researchers, for the developmen ...
Read Project

 7

 FINISHED 

Open Access Infrastructure for Research in Europe 2020 (OpenAIRE2020)

Start date: Jan 1, 2015, End date: Jun 30, 2018,

OpenAIRE2020 represents a pivotal phase in the long-term effort to implement and strengthen the impact of the Open Access (OA) policies of the European Commission (EC), building on the achievements of the OpenAIRE projects. OpenAIRE2020 will expand and leverage its focus from (1) the agents and resources of scholarly communication to workflows and processes, (2) from publications to data, software ...
Read Project

 50

 FINISHED 
FrakRisk further develops the knowledge base for understanding, preventing and mitigating the potential impact of the exploration and exploitation of shale gas reserves found throughout Europe. This will include international experience, state of the art process understanding, state of the art modelling techniques and the further development of fully accepted risk assessment tools for site screeni ...
Read Project

 13

 FINISHED 

European Identity, Cultural Diversity and Political Change (EUINDEPTH)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

The strategic objective of the whole FP7 is to support research in all areas, including the Science in Society. The major goal of the Seventh Framework Programme for research and Technological Development is to keep the EU as a world leader. The European identity, cultural diversity and political changes could be the key issue in the encouragement of societal dialog on research policy, stimulating ...
Read Project

 8

 FINISHED 
Even in the simplest cells, the integration of proteins into a biological membrane is a complex process that is frequently coupled to ribosomal protein synthesis, and requires the coordinated actions of several additional cellular machines. The de novo recapitulation of such a complex process is well beyond the scope of our current technical abilities. Indeed, the techniques that are used to creat ...
Read Project

 8

 FINISHED 
Anthropogenic activities continue to impact the environment causing soil and ground water contamination in many regions and the effects are often persistent especially where heavy metals and radioactive substances have been released. Ecological problems can be particularly severe in the case of atomic power facilities and recent occurrences (Japan) indicate that the Chernobyl incident in 1986 was ...
Read Project

 4

 FINISHED 
"The goal of WATBIO is to use the power of next generation sequencing to develop an accelerated route for producing new germplasm with enhanced drought tolerance whilst maintaining biomass productivity and quality in water scarce, marginal environments unsuitable for food crops.This will be achieved for three non-food crops (Populus, Miscanthus and Arundo), suitable for growth on water scarce, mar ...
Read Project

 23

 FINISHED 
"TRUST aims at conducting CO2 injection experiments at scales large enough so that the output can be extrapolated at industrial scales. It relies on four sites: the heavily instrumented sites of Heletz (Israel, main site) and Hontomin (Spain), access Miranga (Brazil) and the emerging site in the Baltic Sea region. The objectives are to: carry out CO2 injection with different strategies, displaying ...
Read Project

 18

 FINISHED 
"Cell polarity and directed growth (tropism) are fundamental biological processes. Most fungi are dependent on these processes because they grow as polarised filaments called hyphae, whose growth and developmentare governed by physical and chemical cues from the environment. Such cues include surface-contact, light, nutrients, mating partners, host organisms, or ‘self’ hyphae from within the fung ...
Read Project

 13

 FINISHED 
VitriMetTech aims at educating a group of young researchers to implement methods for cutting edge research on new metallic glasses (e.g. Fe, Mg, Al, Ti-based), also in bulk form, and their amorphous/crystalline composites, for functional, bio-mechanical, chemical and structural micro-part applications. Transfer of results to industrial companies will boost innovation in a part of the Metal sector ...
Read Project

 12

 FINISHED 
An estimated 500.000 sudden cardiac deaths (SCD) occur each year in the European Union. Patients at risk for SCD may benefit from prophylactic treatment with an implantable cardioverter-defibrillator (ICD). ICD implantations have dramatically increased in recent years leading to multi-billion Euros of costs with significant regional disparities across Europe. Information on risks, benefits and cos ...
Read Project

 27

 FINISHED 

Erasmus+ Auslandspraktikum

Start date: Jun 1, 2015, End date: May 31, 2017,

For almost 15 years, the Educational Center for Health care of the TILAK GmbH has taken part in the exchange project "Leonardo-da-Vinci". The available programme is now the first among Erasmus+. The internship abroad has developed itself into a steady part of the educational offer. Starting in Autumn 2017, the education for health care and nursing will be an official institution (College). And ...
Read Project

 16

 FINISHED 

Innovative methodology for small populations research (InSPiRe)

Start date: Feb 1, 2014, End date: May 31, 2017,

The HEALTH.2013.4.2-3 call identifies a need for new or improved statistical methodology for clinical trials for the efficient assessment of safety and/or efficacy of treatment for small population groups. This project brings together international experts in innovative clinical trial design methodology in these specific areas along with key stakeholders including regulatory authorities, industry ...
Read Project

 9

 FINISHED 
Disorders of sex development (DSD) are a conglomerate of rare diseases with an estimated incidence of 1: 4500. The causes of DSD are mainly disorders with gonadal dysgenesis, decreased androgen synthesis or function in XY males or disorders with elevated androgen production in XX females. Decision on sex of rearing is difficult in some cases as the prenatal androgen imbalances result in ambiguous ...
Read Project

 17

 FINISHED 
A new approach is needed to ensure that the digital objects created today are available and useful for future generations of users. As scientific, engineering, and media assets and their related metadata are generated across different lifecycle phases, in a continually evolving environment, the concept of a fixed and stable "final" version becomes less relevant. The highly dynamic and complex digi ...
Read Project

 11