Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Automated Urban Parking and Driving (UP-Drive)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Automation of individual transport systems is considered an up-and-coming prospect with the potential of greatly mitigating many of the challenges associated with intensified urbanization, while at the same time offering additional benefits for the citizens and drastically increasing overall street safety. However, due to the lack of maturity of involved key technologies and persisting legal limit ...
Read Project

 5

 FINISHED 

Demand Response in Block of Buildings (DR-BOB)

Start date: Mar 1, 2016, End date: Feb 28, 2019,

The aim of the DR-BOB project is to demonstrate the economic and environmental benefits of demand response in blocks of buildings for the different key actors required to bring it to market. To achieve its aim the DR-BOB project will:• Integrate existing technologies to form the DR-BOB Demand Response Energy Management solution for blocks-of-buildings with a potential ROI of 5 years or less. • De ...
Read Project

 10

 FINISHED 
The overall aim of the AMaTUC project is to boost the scientific excellence and innovation capacity in additive manufacturing of the Technical University of Cluj-Napoca (TUCN) and its high-quality Twinning partners for the benefit of the automotive industry and personalised products markets. To achieve this aim, the 3 year project will build upon the existing strong research and innovation base of ...
Read Project

 4

 FINISHED 
The mission of ESPESA project is to strengthen the research activity and to implement a Technology Transfer&Innovation Management strategy at Centre for Applied Research in Electrical Engineering and Sustainable Development (CAREESD), established in 2010 within Technical University of Cluj-Napoca. The project will reinforce the research potential of the Centre by improving/enhancing the expertise, ...
Read Project

 7

 FINISHED 
The project idea is based on the observation that the state of the healthcare system in Kyrgyzstan is suboptimal and education regarding the operation of advanced medical equipment (such as diagnostic devices) is poor. Even the Kyrgyz Ministry of Healthcare admits that expensive medical equipment located at public hospitals cannot be operated because personnel (medical doctors and technical staff) ...
Read Project

 10

 FINISHED 

Universal Nanotechnology Skills Creation and Motivation Development

Start date: Oct 1, 2016, End date: Sep 30, 2018,

The objective of this Project consists of development of education materials (cirruculum, e-learning materials, mobile applications, guide , and course book preparation), and bringing together students of applied sciences and Professional nanotechnology scientists together, through workshops and seminars, where scientists will share their knowledge and applications. The guide and information relat ...
Read Project

 7

 FINISHED 
The problem we want to address is the quality of learning of our students in the transition between higher education and work. Education programmes contain internships at companies. The benefit for the student varies depending on the supervisors' interests and skills. Large companies tend to offer better guidance than small companies, which means that students get different value from their intern ...
Read Project

 6

 FINISHED 
... Bielsko-Biala (Poland). Other involved partners are: Warsaw University of Technology (Poland), Friedrich-Alexander-Universitat Erlangen Nurnberg (Germany), Universita Degli Studi di Padova (Italy), Universitatea Tehnica Cluj-Napoca (Romania), University of Huddersfield (UK), Interstaatliche Hochschule fur Technik Buchs NTB (Switzerland), Ecole Normale Superieure de Cachan (France), and Volkswage ...
Read Project

 9

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The objective is to provide a novel methodology and a comprehensive ICT solution for collaborative design of product-services (Meta Products) and their production processes. The effective extension of products with new services in different sectors (automotive, home appliances, automation equipment etc.) will be achieved by means of Ambient Intelligence (AmI) technology, Lean and Eco-design princi ...
Read Project

 16

 FINISHED 

ADvanced Electric Powertrain Technology (ADEPT)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The goal of the ADEPT program is to produce a virtual development environment for E-propulsion systems and to train and establish a multi-disciplinary research network. The ADEPT program will raise the profile and to improve career perspectives for 12 ESRs, and 2 ERs, offering a high-quality structured consortium providing personalized training opportunities in E-propulsion systems and in compleme ...
Read Project

 12

 FINISHED 

Meeting of Energy Professional Skills (MEnS)

Start date: Mar 1, 2015, End date: Aug 31, 2017,

MENS is a project conceived in order to provide an enhance the NZEB skills of building managers such as engineers and architect through a series of accredited training activities developed by 9 universities and 3 market players. MENS aims: - To increase the knowledre and skills of at least 1800 building managers (engineers, architects) in NZEB design and construction, out of which 50% would be wom ...
Read Project

 13

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Read Project

 34

 FINISHED 
High current coated conductors (CC´s) have high potential for developing electrical power applications and very high field magnets. The key issues for market success are low cost robust processes, high performance and a reliable manufacturing methodology of long length conductors. In recent years EU researchers and companies have made substantial progress towards these goals, based on vacuum (PLD) ...
Read Project

 22

 FINISHED 
Due to the replacement of engine-driven loads with electric power units, the electrical power requirements of a modern car has been rising rapidly during the last decades and are expected to continue to rise. As the power limitations of the storage systems and car alternators are rapidly being approached, different solutions have been searched for addressing this challenge. The research was orient ...
Read Project

 2

 FINISHED 
Advanced automotive system design and development requires a multidisciplinary and intersectoral approach connected to the integration of new powertrain concepts, such as electric and hybrid ones. This approach involves knowledge concerning the NVH issues, and/or electric motor, associated power electronics to control motor speed and torque, the transaxle that transfers the mechanical energy to t ...
Read Project

 4

 FINISHED 
Despite the ongoing efforts on energy efficiency improvements,, the lower energy consumption per data centre does not compensate the cumulative increasing energy demand, due to the combined action of increasing load density in the computer room and rising digitization of human activities. Hence data centres are consuming increasing amount of energy, with a negative impact on the environment and on ...
Read Project

 11

 FINISHED 

Advanced Reluctance Motors for Electric Vehicle Applications (ARMEVA)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

To enable a large scale adoption of EVs, a new generation of electric drive systems is needed to reduce dependency on rare earth materials, while improving energy efficiency, power density, safe operation and reducing manufacturing/recycling costs. ARMEVA will develop a new rare-earth-material free generation of advanced reluctance motors.The goal of ARMEVA is to achieve similar power density and ...
Read Project

 8

 FINISHED 
NoGAP bridges the gap between research and innovation and contributes to taking advantage of the innovation potential of SMEs based on a better cooperation with researchers, transferring and using knowledge resulting from research. The overall objective of the project is to reinforce cooperation with Eastern Partnership countries to develop a “Common Knowledge and Innovation Space” on societal cha ...
Read Project

 14

 FINISHED 

Technology Transfer in Computing Systems (TETRACOM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Read Project

 33

 FINISHED 
Programme’s background: The school turns the experience of previous successful programmes that took place in Romania to advantage, with excellent results in the field of labour market for the graduates who were trained as well as the professional development of the participant teachers. The contact with the partners came to terms in October 2014 and the context of the training programme was imprin ...
Read Project

 3

 FINISHED 

Plug And Navigate ROBOTS for smart factories (PAN-Robots)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

Today, product processing and packaging have often reached a high degree of automation, in which energy consumption, agile manufacturing and product customization are well addressed. On the other hand transportation of raw materials and final products from/to storage and shipment points usually requires the use of manually operated forklifts. However, automation and optimization should be applied ...
Read Project

 8

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The establishment of closer international cooperation to share and develop research on globally sustainable Waste Electrical and Electronic Equipment (WEEE) management is timely and significant. This GREENet project is aimed at teaming up multi-disciplinary research teams from the EU and China to enhance the knowledge base and achieve research synergies as integrated technical solutions in the rel ...
Read Project

 5

 FINISHED 
IASON Project has the ultimate goal to establish a permanent and sustainable Network of scientific and non-scientific institutions, stakeholders and private sector enterprises belonging in the EU and third countries located in two significant areas: The Mediterranean and the Black Sea regions. The main focal points of the project will be the usage and application of Earth Observation (EO) in the f ...
Read Project

 14

 FINISHED 
The objectives of this proposal are the following:-Increase efficiency and effectiveness of innovation processes of local beneficiaries of SME instrument and SMEs with significant innovation activities and high potential for internationalisation;-Facilitate SME’s access to consulting services for innovation management to address bottlenecks to creation of economic impact;-Support innovative SME’s ...
Read Project

 6

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 

Speech synthesis that improves through adaptive learning (SIMPLE4ALL)

Start date: Nov 1, 2011, End date: Oct 31, 2014,

The Simple4All project will create speech synthesis technology that learns from data with little or no expert supervision and continually improves itself, simply by being used.In order to be accepted by users, the voice of a spoken interaction system must be natural and appropriate for the content. Using the same voice for every application is not acceptable to users.But creating a speech synthesi ...
Read Project

 5

 FINISHED 
UCONNECT is aligned with the current steady growth in the interest of concretization of Smart Cities, centred at solving the connectivity needs for Smart Public Transportation Systems to provide Smart Services, both for the transport itself, the asset that most importantly influences the overall efficiency of a city, and for citizens, the main asset in a city.Enhancing the transport sector will re ...
Read Project

 6

 FINISHED 
The objective of the DRIVE C2X Integrated Project is to carry out comprehensive assessment of cooperative systems through Field Operational Tests in various places in Europe in order to verify their benefits and to pave the way for market implementation. This general objective is split into four major technical objectives:\n•Create a harmonised Europe-wide testing environment for cooperative syste ...
Read Project

 36

 FINISHED 
The overall aim of the AdM-ERA project is to integrate the Central Metallurgical Research and Development Institute (CMRDI) into the European Research Area (ERA), by developing cooperation with European research and innovation organisations in its 2 strongest research topics: A) Additive Manufacturing of Ti and CoCr alloys based prostheses, and B) Additive Manufacturing of biocompatible ceramic ma ...
Read Project

 5

 FINISHED 
"The MARKET IT objective is to demonstrate the viability of applying advanced web semantic technologies to SMEs innovation processes. MARKET IT will start from the results achieved in the project TECH-IT-EASY (FP7 Research for the Benefit of SMEs - Grant Agreement number 232410) ended on the 31st of July 2011. The results of TECH IT EASY consist in a prototype information system able to support el ...
Read Project

 5

 FINISHED 
The Network of Excellence HighTech Europe facilitates the implementation of high-tech processing at industrial scale via strongly connected regional knowledge transfer chains consisting of basic-applied science centres (12 in total), industry federations (4), Innovation Relay Centre (1) and SMEs (5). Its main aim is to identify, develop and demonstrate potential, cost-efficient, innovations to be ...
Read Project

 23

 FINISHED 

Medical Devices Design in Cardiovascular Applications (MeDDiCA)

Start date: Sep 1, 2009, End date: Aug 31, 2013,

We propose an innovative, multi-disciplinary and multi-centre Marie Curie Initial Training Network; “MeDDiCA” (Medical Devices Design in Cardiovascular Applications) focused on Cardiovascular Engineering and Medical Devices. MeDDiCA Early Stage Researchers will build a career in cardiovascular engineering founded on both “skills for life” (communication skills, research and project management, IP, ...
Read Project

 9

 FINISHED 

Initiative for Globus in Europe (IGE) (IGE)

Start date: Oct 1, 2010, End date: Apr 30, 2013,

In order to continuously support the European computing infrastructures and to exploit possible synergies, it is of crucial importance to coordinate the European Globus activities, drive forward the developments according to the requirements of the European users and to strengthen the influence of the European developers in the Globus Alliance. Topics like security or privacy, data privacy protect ...
Read Project

 11

 FINISHED 
The Black Sea Catchment is internationally known as one of ecologically unsustainable development and inadequate resource management, which has led to severe environmental, social and economic problems. EnviroGRIDS @ Black Sea Catchment aims at building the capacities of regional stakeholders to use new international standards to gather, store, distribute, analyze, visualize and disseminate crucia ...
Read Project

 30

 FINISHED 
The project uttermost objective is to foster and strengthen the primacy of Future European Manufacturing by defining the next generation Virtual Factory Framework. The VFF will promote major time and cost savings while increasing performance in the design, management, evaluation and reconfiguration of new or existing facilities, supporting the capability to simulate dynamic complex behaviour over ...
Read Project

 29

 FINISHED 

Green Active Management of Energy in IT Service centres (GAMES)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

The vision of the GAMES project is for a new generation of energy efficient IT Service Centres. With the unprecedented digitisation of business and government processes across Europe, energy efficiency of IT Systems and IT Service Centres is dramatically emerging as one of the most critical environmental challenges to be dealt with. A first yet partial answer to the energy challenges is offered by ...
Read Project

 8