Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This proposal sprang from European scientists in both academia and industry who identified a common challenge: setting up a training frame to educate the next generation of imagers in complex biological systems (healthy & pathological), so they are able to master all major aspects of this competitive field and bring important innovations to universities and companies.The long-term goal of any init ...
Read Project

 11

 FINISHED 
Sustainability of energy systems goes through high penetration of renewable energy with huge volumes of electricity to transmit over long distances. The most advanced solution is the HVDC Supergrid. But fault currents remain an issue even if DC circuit breakers have emerged. These are not satisfying, whereas Superconducting Fault Current Limiters (SCFCLs) using REBCO tapes bring an attractive solu ...
Read Project

 14

 FINISHED 
"As clearly stated in report no. 10/2014 "Noise in Europe 2014" by the European Environment Agency, noise pollution is a major environmental health problem in Europe, yet the lack of comparable common assessment methods causes significant inconsistencies in exposure estimates of people affected by noise. However, in the past few years building acoustics has been influenced by evolution issues in t ...
Read Project

 7

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 

High level Integrated SEnsor for NanoToxicity Screening (HISENTS)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The HISENTS vision is to address the problem of the dearth of high-quality tools for nano-safety assessment by introducing an innovative multimodular high throughput screening (HTP) platform including a set of individual modules each representing a critical physiological function connected and integrated in a hierarchical vectorial manner by a microfluidic network. The increase of the capacity to ...
Read Project

 11

 FINISHED 
NEWTON is a large scale initiative to develop, integrate and disseminate innovative technology-enhanced learning (TEL) methods and tools, to create new or inter-connect existing state-of-the art teaching labs and to build a pan-European learning network platform that supports fast dissemination of learning content to a wide audience in a ubiquitous manner. NEWTON focuses on employing novel technol ...
Read Project

 14

 FINISHED 
The aim of the project is to develop acoustics course for engineers with elements of gamification that enable specialist from rail, machinery and automotive industry to build improvement in the fields of vibroacoustics, through essential knowledge base and vocational competence across partner countries. These courses will provide a source of expertise on acoustic issues in terms of specific needs ...
Read Project

 5

 FINISHED 
Although there is a large body of knowledge available on soil threats in Europe, this knowledge is fragmented and incomplete, in particular regarding the complexity and functioning of soil systems and their interaction with human activities. The main aim of RECARE is to develop effective prevention, remediation and restoration measures using an innovative trans-disciplinary approach, actively inte ...
Read Project

 30

 FINISHED 

Management - Innovation - Development

Start date: Oct 15, 2015, End date: Oct 14, 2018,

Central Asian universities could become those sites where the interest of different stakeholders – potential employers, government and youth could meet each other. An innovation and research is what modern society asks for. Creation of the Youth Centre will allow young people who usually don’t have appropriate knowledge, experience and funds to start their own business or develop any project to do ...
Read Project

 15

 FINISHED 
Establishment and development of a new Master on “ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENT BUILDINGS” in 3 RU and 2 AM Universities with affiliation of other 2 RU Universities, according to features and learning outcomes delivering graduates environmental and “green buildings” technological issues’ skills. 1. Curricular reform: to implement an effective curricular development oriented towards ...
Read Project

 20

 FINISHED 

strEngthening National researcH And iNnovation Capacities in viEtnam

Start date: Oct 15, 2015, End date: Oct 14, 2018,

ENHANCE is a structural project that will operate at a macro level targeting the Vietnamese HE system (R&I management and implementation). Thanks to a complementary consortium involving 6 of the most relevant VIET HEIs with geographical balance, 3 EU HEIs with huge experience in R&I and international cooperation and the participation of MOET and MOST (HE and S&T authorities). The project is in lin ...
Read Project

 11

 FINISHED 

Future Mathematics

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Mathematical skills are a prerequisite in technical studies and mathematics lays the basis for understanding different engineering disciplines. However, various studies have shown that the lack of mathematical proficiency already causes problems in engineering mathematics’ and other courses in European HEIs (high drop-out rates, lower graduation rates, lack of basic knowledge etc.). Mathematics is ...
Read Project

 4

 FINISHED 
The project is focused on enhancement of an access to higher education for students with special needs in line with the Erasmus+ aim to support the equity and inclusion of all people in education. The objective of our project is systematic development, testing, and examination of effective inclusive methodology to ensure access for under-represent groups in HE, in particular through student-centre ...
Read Project

 4

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The key objective of PowerBase “Enhanced substrates and GaN pilot lines enabling compact power applications” is to ensure the availability of Electronic Components and Systems (ECS) for key markets and for addressing societal challenges, aiming at keeping Europe at the forefront of the technology development, bridging the gap between research and exploitation, creating economic and employment grow ...
Read Project

 40

 FINISHED 
OSIRIS project, a Research and Innovation Action (RIA), aims at improving substantially the cost effectiveness and performance of gallium nitride (GaN) based millimetre wave components. The project proposes to elaborate innovative SiC material using isotopic sources. This material will offer thermal conductivity improvement of 30% which is important for devices dissipating a lot of power, in parti ...
Read Project

 9

 FINISHED 
The aim of INSPIRATION is to adopt a funder and end-user demand-driven approach to establish and promote the adoption of the knowledge creation, transfer and implementation agenda for land use, land-use changes and soil management in the light of current and future societal challenges. Main objectives are: • Formulate, consult on and revise an end-user oriented strategic research agenda (SRA), • S ...
Read Project

 22

 FINISHED 
The Project will extend the implementation of the Roadmap established and endorsed under Pillar I Build Up Skills project in Slovakia and the Czech Republic to middle and senior level professionals. These Roadmaps identified key measures for setting up a national qualification and training scheme and other measures for ensuring development of skills essential for the field of buildings to contribu ...
Read Project

 9

 FINISHED 

Training in Embedded Predictive Control and Optimization (TEMPO)

Start date: Feb 1, 2014, End date: Jan 31, 2018,

"TEMPO addresses the needs of European companies and society for embedded control technology, through training on cutting edge research in the rapidly emerging inter-disciplinary field of embedded predictive control and optimization. The key objectives are:- to expand the scientific and technical knowledge platform for Embedded Predictive Control and Optimization in Europe;- to exploit this platfo ...
Read Project

 12

 FINISHED 

Towards Indium free TCOs (INREP)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The goal of INREP is to develop and deploy valid and robust alternatives to indium (In) based transparent conductive electrode materials as electrodes. In-based materials, mainly ITO, are technologically entrenched in the commercial manufacture of components like LEDs (both organic and inorganic), solar cells, touchscreens, so replacing them with In-free transparent conducting oxides (TCOs) will r ...
Read Project

 15

 FINISHED 

Innovation and Commercialisation in the NMP thematic area (INCOMERA)

Start date: Jan 15, 2014, End date: Jan 14, 2018,

Towards Europe 2020, European Commission adopted a comprehensive innovation strategy to enhance Europe's capacity to deliver smart, sustainable and inclusive growth. This strategy concerns the so called concept of Smart Specialization Strategy.By itself, sounds a challenging task, but it is of crucial importance, especially for less advanced regions. According to this concept, each region must set ...
Read Project

 23

 FINISHED 
The ITN RegPol² - Socio-economic and Political Responses to Regional Polarisation in Central and Eastern Europe centers on new patterns of regional disparities between metropolised core regions and the remaining parts of Central and Eastern European countries (CEE). Such spatial patterns have become a striking feature of the current settlement system of these countries and have lately fuelled conc ...
Read Project

 8

 FINISHED 
The project GRAIL has been build with 15 partners from 9 different countries with the aim of finalising the solutions given previously to the valorization of glycerol and transform then in valuable products in a biorefinery approachThe overall concept of GRAIL project is the use, exploitation and further development of the state of the art in the field of bio-based products from glycerol and the d ...
Read Project

 16

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Slovak-Austrian-German-Alliance for Vocational Education and Training

Start date: Sep 1, 2015, End date: Aug 31, 2017,

Project SAGA for VET Based on analyses of unoccupied work positions for particular professions, of registered unemployed suitable for requalification in these professions, of the opportunities for VET in these professions, the partners have selected 6 educational programs relevant for this project. Since these educational programs are well covered in AT and DE, the main aim of the SAGA for VET pro ...
Read Project

 6

 FINISHED 
The project is proposed in accordance with document Education and Training in Europe 2020 which highlights that “ Foreign languages skills can enhance the employability of young people”. This initiative totally fits the target groups of our project which are primary and secondary students. Moreover, the recommendations outlined in Rethinking Education include new criteria of learning foreign lang ...
Read Project

 6

 FINISHED 
Project consortium 4 European countries, 3 technical universities, 2 industrial companies (SME), 4 vocational secondary schools and IT training organizations. Motivation The project reacts to the decreased interest in studying at secondary schools providing education in electrical and information engineering, as well as in the related fields. Our motivation is to contribute to higher attractivenes ...
Read Project

 9

 FINISHED 
The project finds its rationale in the needs of training and education providers, students, production companies, ngos and the European Commission. The need for the ethical training of employees has already formally been acknowledged by the European Commission claiming to integrate CSR in the skills and competences of managers and employees. These are regarded as key elements in terms of individu ...
Read Project

 9

 FINISHED 
In 2009, the European Union identified Key Enabling Technologies (KETs) for their potential impact in strengthening Europe’s industrial and innovation capacity [COM(2009)512 final]. In particular, KETs were recognized, as playing increasingly vital role in developing the required industrial and technological base indispensable for the delivery of smart, sustainable and inclusive European Growth [S ...
Read Project

 7

 FINISHED 

YounGO

Start date: Feb 1, 2016, End date: Jun 30, 2017,

European youth faces the challenge of employability. Some 4.7 million young Europeans are unemployed according to the latest Eurostat estimates that at the last publication June 30, 2015, the countries with the highest youth unemployment rate are: Spain (53.2%), Greece (52.4%), Croatia (45.5%), Italy (42.7%), Cyprus (36%) and Portugal (34.7%). The International Labour Organisation (ILO) has warned ...
Read Project

 7

 FINISHED 
"The entire project of cooperation with Russia titled “Strengthening of Cooperation and Exchange for Nuclear Education and Training between the European Union and the Russian Federation” consist of two parallel projects on the EU side and the Russian side. The objectives of the entire project are:- based on the achievements of the FP7 ENEN-RU project, to further define a common basis for effective ...
Read Project

 11

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
During our life’s, both privately and professionally, we exposed to a multitude of hazardous situations. And most of the time we are not (timely) aware of the dangerous situation. One of these silent killers is definitely carbon monoxide poisoning. There is a direct societal need for home and building automation (HABA) systems equipped with ultra-sensitive, reliable gas sensors (for hazardous gase ...
Read Project

 21

 FINISHED 
Europe’s strengths are based on the deep knowledge and market position in automotive industry, industrial electronics industry and leading know how for More-than-Moore based embedded system. It is of vital interest for the electronics manufacturers in Europe to have fast access to reliable prototypes of electronic devices as well as competitive advanced manufacturing of such devices made in Europe ...
Read Project

 26

 FINISHED 
"The proposal addresses each of the three elements of the so-called 'knowledge triangle', i.e. research, innovation and education. The proposed programme is based partly on nationally funded multidisciplinary (Photonics, Nanoelectronics, Chemistry, Materials Science) projects that have been recently awarded to the partners from Academia and is designed to provide added value from the obvious syner ...
Read Project

 4

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
The aim of MANUNET II is to cooperate among regions and countries around Europe with fruitful calls in the field of Manufacturing, to ensure that MANUNET II suits perfectly in ERA and, finally, to propose a sustainable cooperation structure for a very long term frame.In order to enhance this impact, the extension that will cover MANUNET II is going to be longer than MANUNET CA, having included mor ...
Read Project

 19

 FINISHED 
The Center of Excellence SlovakION aims to become Eastern Europe’s leading research centre for ion beam and plasma technologies in materials engineering and nanotechnology. Based on cutting-edge research and closely integrated in an international network of research facilities, SlovakION’s holistic approach to innovation transfer and its close interaction with the regional industry will contribute ...
Read Project

 7

 FINISHED 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq ...
Read Project

 25

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1