Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Advanced Radio Astronomy in Europe (RadioNet)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Read Project

 29

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 
Humanity’s plans to further explore space require the development of bio-regenerative life support systems and in particular plant cultivation. Plants contribute to all major life support functions by producing food and oxygen, reducing carbon dioxide and recycling water and waste. Moreover, fresh crops also have a positive impact on crew psychological well-being. EDEN ISS aims to adapt, integrate ...
Read Project

 13

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
... region and the complete EO value chain with the overarching objective of establishing a multi-regional coordination network that will (i) support the effective integration of existing EO capacities (space/air-borne/in-situ monitoring networks, modelling and data exploitation skills, and past project experience), (ii) provide the interface for the engagement of the complete ecosystem of EO stakeho ...
Read Project

 20

 FINISHED 

Reaserchers' Night Project 2016-2017 in Israel (ERNI2016)

Start date: Jun 1, 2016, End date: Jan 31, 2018,

...l implementation of European Researchers' Night in Israel we will have:o Venues covering the whole country.o Involvement of the academic community including Israel Ministry of Science, Technology and Space (MOST), all major researchuniversities, leading collages and three science museums.o Awareness campaign at national level managed and funded by the Israel Ministry of Science, Technology and Spa ...
Read Project

 14

 FINISHED 
National Contact Points (NCPs) for Space provide support on Space funding under EU Framework programmes. In 2007 under FP7 the EU started funding an NCP Space network which was named COSMOS. This enabled the NCPs to benefit from each other’s experience and thus raise the level of the overall quality of their services. Additional services were established like a joint website and news service provi ...
Read Project

 24

 FINISHED 
The smooth functioning of the European economy and the welfare of its citizens depends upon an ever-growing set of services and facilities that are reliant on space and ground based infrastructure. Examples include communications (radio, TV, mobile phones), navigation of aircraft and private transport via GPS, and service industries (e.g. banking). These services, however, can be adversely affec ...
Read Project

 8

 FINISHED 

Learning Toxicology through Open Educational Resources

Start date: Sep 1, 2015, End date: Aug 31, 2017,

In “Bucharest Communication”, 2012, European Higher Education Area, Ministerial Conference, it was stated: “We reiterate our commitment to promote student-centred learning in higher education, characterised by innovative methods of teaching that involve students as active participants in their own learning”. This project (TOX-OER) faces this principle joining as partners Universities and research ...
Read Project

 7

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

...uration, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-critical embedded systems engineering in the areas of transportation (aerospace, automotive, and rail) and healthcare providing a critical mass of European technology providers.CRYSTAL perfectly fits to other ARTEMIS projects, sharing the concept of a reference technology pla ...
Read Project

 70

 FINISHED 
"The HIPOW Project aims to develop a holistic regime for protection of critical infrastructures against threats from electromagnetic radiation. The holistic regime will include guidance regarding hardening measures and robust architectures, a suggested risk management process applicable on organizational level, input to standards and guidelines applicable for critical infrastructures on national a ...
Read Project

 16

 FINISHED 

Advanced Radio Astronomy in Europe (RADIONET3)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

RadioNet is an I3 that coordinates all of Europe’s leading radio astronomy facilities in an integrated cooperation to achieve transformational improvement in the quality and quantity of the scientific research of European astronomers. RadioNet3 includes 27 partners operating world-class radio telescopes and/or performing cutting-edge R&D in a wide range of technology fields important for radio ast ...
Read Project

 29

 FINISHED 
Project in brief The rapid pace of urbanization in the Mediterranean area over the last decades have raised a series of issues mostly related to air quality, energy efficiency, waste recycling, pressure on natural resources, pollution and social welfare of urban inhabitants. While cities population will continue to grow in the next years, it is of fundamental importance to ensure the transition fr ...
Read Project

 12

 FINISHED 

European Researchers' Night 2014 and 2015 in Israel (ERNI2014)

Start date: May 1, 2014, End date: Oct 31, 2015,

...l implementation of European Researchers' Night in Israel we will have:o Venues covering the whole country.o Involvement of the academic community including Israel Ministry of Science, Technology and Space (MOST), all major research universities, leading collages and three science museums.o Awareness campaign at national level managed and funded by the Israel Ministry of Science, Technology and Sp ...
Read Project

 12

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 
"European Space industry demand for lighter and cheaper launcher transport systems. The proposed project DESICOS contributes to these aims by a new design approach for imperfection sensitive composite launcher structures, exploiting the worst imperfection idea efficiently: the Single Perturbation Load Approach. Currently, imperfection sensitive shell structures prone to buckling are designed accor ...
Read Project

 13

 FINISHED 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Read Project

 35

 FINISHED 

Terahertz Photonic Imager on Chip (TeraTOP)

Start date: Oct 1, 2011, End date: Jun 30, 2015,

The impressive developments in the field of electronic imaging based on CMOS Imagers have generated worldwide enormous business opportunities, with revenues of more than $4B in 2009 at the component level alone. Today such Imagers almost solely address the visible and near-infrared part of the electromagnetic spectrum. Many applications would profit from affordable and reliable Imagers for the ter ...
Read Project

 8

 FINISHED 
Description Digital preservation offers the economic and social benefits associated with the long-term preservation of information, knowledge and know-how for re-use by later generations. However, digital preservation has a great problem, namely that preservation support structures are built on projects which are short lived and is fragmente ...
Read Project

 33

 FINISHED 
In June 2008 the Space National Contact Points (NCPs) from 33 EU member states and FP7 associated countries started COSMOS, the “Cooperation Of Space NCPs as a Means to Optimise Services”. NCP networks had been established in other themes already, like IDEALIST, and proved a suitable instrument to interlink according NCPs. This led to added benefit e. g. through new services like specific partner ...
Read Project

 26

 FINISHED 

De-Orbiting of Satellites using Solar Sails (DEORBIT SAIL)

Start date: Mar 1, 2011, End date: Oct 31, 2014,

...titudes lower than 900 km for minisatellites (20 to 500 kg) if deorbiting time constraints of 25 years are being considered. Recent studies show an increasing probability of collisions between intact spacecraft and debris. If no countermeasures are taken, the number of debris particles will grow with a growth rate in the order of up to 5% per year. The historical practice of abandoning spacecraft ...
Read Project

 10

 FINISHED 
"The security of space assets are affected by the high-energy charged particle environment in the radiation belts. The controlling principal source and loss mechanisms in the radiation belts are not yet completely understood. During a geomagnetic storm the length of time during which space assets are in danger is determined by the loss mechanisms, particularly by relativistic electron precipitatio ...
Read Project

 12

 FINISHED 

Extended Non-Destructive Testing of Composite Bonds (ENCOMB)

Start date: Nov 1, 2010, End date: Apr 30, 2014,

"Even though composite materials are already used in the manufacturing of structural components in aeronautics industry a consequent light-weight design of CFRP primary structures is limited due to a lack of adequate joining technologies. In general, adhesive bonding is the optimum technique for joining CFRP light-weight structures, but difficulties in assessing the bond quality by non-destructive ...
Read Project

 15

 FINISHED 
"The proposed IDIHOM project is motivated by the increasing demand of the European aerospace industries to advance their CFD-aided design procedure and analysis by using accurate and fast numerical methods, so-called high-order methods. They will be assessed and improved in a top-down approach by utilising industrially relevant complex test cases, so-called application challenges in the general ar ...
Read Project

 21

 FINISHED 

Sea Border Surveillance (SeaBILLA)

Start date: Jun 1, 2010, End date: Feb 28, 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Read Project

 29

 FINISHED 
...ations, crust temperature, monitoring of electromagnetic field under, on, and above Earth surface, meteorological monitoring, including earthquake clouds and electrical charge distributions, near space monitoring, aimed to estimate Earth, Sun and space (cosmic rays) origins of variations, and biological precursors. For many variables well working monitoring exists (for example INTERMAGNET geomagne ...
Read Project

 9

 FINISHED 

Advanced Lattice Structures for Composite Airframes (ALaSCA)

Start date: Dec 1, 2010, End date: Nov 30, 2013,

...e structures fulfilling fundamental aspects of airworthiness.The idea behind the ALaSCA project is to perform a comprehensive investigation starting with the beneficial geodesic design well-proven in space technology and transferring it to composite aircraft fuselage designs. The main objectives of this research programme are: a) Maximum weight and cost reduction by using lattice designs for fusel ...
Read Project

 13

 FINISHED 

Israel Researchers' Night 2013 (IRN2013)

Start date: May 1, 2013, End date: Nov 30, 2013,

...ers which will run the event in 2013 are ALL of the universities in Israel, two of the leading collages and 2 science museum which one of them is the National Museum of Science, Technology & Space which will also coordinate the project.• The main theme for this year Researchers' Night event will be ""Space and us"" in conjunction with marking 10 years for the Columbia tragedy and the preservation ...
Read Project

 13

 FINISHED 

Casting of Large Ti Structures (COLTS)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

... aeroengine Ti casings and significant reduction of CO2 and of Ti raw material wastage incurred in current manufacturing processes. It will also lead to more application of light Ti structures in aerospace and space, thus weight and fuel reduction by making Ti structure commercially viable."
Read Project

 11

 FINISHED 
...rvational data collected and stored by former ionospheric satellite missions – their data mining with the aim to create the database of ionosphere waves catalogues. This is an urgent need of modern space science because its realization will help to improve considerably Space Weather nowcast and forecast and to promote the progress of actual today GMES and other applied studies, e.g., ionospheric m ...
Read Project

 8

 FINISHED 
... thus fundamental to improve Europe’s welfare. PASODOBLE will develop and demonstrate user-driven downstream information services for the public, regional and local air quality sectors by combining space-based and in-situ data with models in 4 thematic service lines: (1) Health community support for hospitals, pharmacies, doctors and people at risk, (2) public information for regions, cities, tour ...
Read Project

 22

 FINISHED 
"The carbon Environmental Service (CARBONES) will provide the first multi-decadal reanalysis of the global carbon cycle and a service to provide a rolling update of this analysis. This will include the "essential climate variables" (defined by the Global Climate Observing System) of atmospheric carbon dioxide, leaf area and biomass in various categories. No integrated reanalysis includes these cli ...
Read Project

 15

 FINISHED 
geoland2 intends to constitute a major step forward in the implementation of the GMES Land Monitoring Core Service (LMCS). The three components (Local, Continental and Global) of the LMCS are addressed. The goal of geoland2 is (i) to prepare, validate and demonstrate pre-operational service chains and products that will underpin the LMCS, and (ii) to propose and demonstrate a concrete functional o ...
Read Project

 54