Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through ...
Read Project

 39

 FINISHED 

Fishfriendly Innovative Technologies for Hydropower (FIThydro)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The f ...
Read Project

 26

 FINISHED 

Waste Heat Recovery in Industrial Drying Processes (DRYficiency)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

The overall objective of the DRYficiency project is to lead energy-intensive sectors of the European manufacturing industry to high energy efficiency and a reduction of fossil carbon emissions by means of waste heat recovery to foster competitiveness, improve security of energy supply and guarantee sustainable production in Europe. The project addresses three sectors, namely brick, pet care/feed a ...
Read Project

 12

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 
MulitPACK will be the confidence building demonstrator for standardised integrated cooling & heating packages installed in high energy demanding buildings. The roll-out of new energy efficient plug-and-play units should reduce the specific energy consumption by more than 25 %, simultaneously reducing the total cost of ownership. A scientific-supported introduction of innovative packages, all parts ...
Read Project

 7

 FINISHED 

Marine Renewable Energy Research Infrastructure (MARINERGI)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

The objective of MARINERG-i is to become the leading internationally distributed infrastructure in the Marine Renewable Energy (MRE) sector. Its integrated nature and co-ordinated approach will accelerate the research development and deployment of offshore wind, wave, tidal and combined energy technologies and help maintain Europe as a global leader in this industry. In addition MARINERG-i wil ...
Read Project

 13

 FINISHED 
The improvement of energy efficiency across European industry is crucial for competitiveness. So far, the measures for improvement of energy efficiency have been directed at primary production processes. In this project, we will address the improvement of energy efficiency in industrial water circuits: auxiliary electric motor driven systems with high optimisation potential. The European manufactu ...
Read Project

 6

 FINISHED 
Supermarkets comprise various technical disciplines: buildings, heating-, cooling- and ventilations systems. Over one million supermarkets across Europe require ca. 4% of the total electricity. New integrated technologies for more efficient supermarkets are now available and efficiency improvements up to 30% have already been demonstrated. These heating and cooling technologies offer in the mid-te ...
Read Project

 11

 FINISHED 
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co ...
Read Project

 22

 FINISHED 

CO2 capture from cement production (CEMCAP)

Start date: May 1, 2015, End date: Oct 31, 2018,

The European cement industry has committed itself to contributing to climate protection measures and therefore to curbing its CO2 emissions. CO2 capture technologies, although an essential part of all CO2 reduction scenarios, are not yet ready for large-scale deployment in the cement industry. Hence, the primary objective of CEMCAP isTo prepare the ground for large-scale implementation of CO2 capt ...
Read Project

 15

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 
ECCSEL aims at gaining recognition as a world-class research infrastructure based within leading European Carbon Capture and Storage (CCS) institutions and knowledge centres. It will be due for registration in 2015, forming a legal entity allocating efforts and resources to selected scientific and technological aspects of the CCS chain. ECCSEL will enable high-ranking researchers and scientists fr ...
Read Project

 14

 FINISHED 
"Power system reliability management means to take decisions under increasing uncertainty (for instance, related to renewable generation). It aims to maintain power system performance at a desired level, while minimizing the socio-economic costs of keeping the power system at that performance level. Seven TSOs (Belgium, Bulgaria, Czech Republic, Denmark, France, Iceland, Norway), together with ele ...
Read Project

 20

 FINISHED 
The scientific targets of the EUROSUNMED project are the development of new technologies in three energy field areas, namely photovoltaics (PV), concentrated solar power (CSP) and grid integration (GI), in strong collaboration with research institutes, universities and SMEs from Europe in the north side of the Mediterranean sea and from Morocco and Egypt from the south of the sea. The focus in PV ...
Read Project

 18

 FINISHED 
The OBJECTIVES of this proposal are as followsa) to define a subsequent initiative, referred to as the Pilot Case, providing a model for establishing a European CO2 infrastructure project, targeting a gateway transferring CO2 from source to sink. The gateway will form the first leg of a cross-border network, allowing multiple sources and multiple sinks.b) to make profound assessments of the substa ...
Read Project

 7

 FINISHED 
Chemical-looping combustion (CLC) has unique potential for reducing energy and cost penalty for CO2 capture, as it avoids the costly gas separation of other CO2 capture technologies. Early deployment is seen in natural gas steam generation, where gas-to-steam efficiency penalty with CLC is below 1%-point compared to 15%-points with amine scrubbing and 8%-points with oxyfuel combustion, all for 95% ...
Read Project

 17

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
The science of complex systems distinguishes linear from non-linear dynamics. Simpler systems can often be satisfactory described by linear models, but complex systems require non-linear models that can capture more of the characteristics of such systems, such as thresholds, feedback loops, avalanche effects, and irreversibility. Linear systems can be validated by aligning models to the past and u ...
Read Project

 17

 FINISHED 

Support to the European CCS Demonstration Project Network (CCS-PNS)

Start date: Mar 21, 2012, End date: Mar 20, 2016,

...e provides an extensive body of expertise in CCS, expertise in facilitations, and extensive experience in project knowledge sharing and data analysis. The offering will be further supported by IFPEN, SINTEF and TNO, three major research organisations in the field of CCS, and who have expertise on the whole CCS chain. In line with the CCS Project Network Knowledge Sharing Protocol, knowledge sharin ...
Read Project

 4

 FINISHED 
Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Read Project

 28

 FINISHED 
"IMPACTS - The impact of the quality of CO2 on transport and storage behaviour will underpin the realisation of the EU CCS European Industrial Initiative implementation plan by developing knowledge and technology needed for Carbon Dioxide Capture, Transport and Storage (CCS) pilots and large-scale demonstrations. IMPACTS is linked to demonstration projects, and will therefore benefit from realisti ...
Read Project

 12

 FINISHED 
Offshore Renewable Conversion systems are mostly at the pre-commercial stage of development. They comprise wave energy and tidal stream converters as well as offshore wind turbines for electrical generation. These devices require research to be undertaken at a series of scales along the path to commercialization. Each technology type is currently at a different stage of development but each one al ...
Read Project

 29

 FINISHED 

WindScanner.eu - The European WindScanner Facility (WINDSCANNER)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The future high rate of deployment of renewable energy will require a substantial increase in the installed wind power capacity towards 2020 and beyond, in fact this demand corresponds approximately to the installation of one large turbine every hour for the next decade. This is a substantial “grand challenge” as outlined in the Strategic Energy Technology Plan (SET-Plan) from 2009, which is the t ...
Read Project

 10

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 

High Power, high Reliability offshore wind technology (HIPRWIND)

Start date: Nov 1, 2010, End date: Jun 30, 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Read Project

 22

 FINISHED 
The key objective of the EcoGrid EU project is to demonstrate efficient operation of a distribution power system with high penetration of many and variable renewable energy resources. The demonstration will take place on the Danish island Bornholm with more than 50 % of electricity consumption from renewable energy production.A real-time market concept will be developed to give small end-users of ...
Read Project

 17

 FINISHED 
The proposed project constitutes the second part of a preparatory project aimed at forming a new distributed research infrastructure devoted to world-class experimental research pertaining to CCS. The project will bring the new research infrastructure up to the level of legal and financial maturity. Pursuant to this endeavour, a consortium has been established to provide the techno-economic, legal ...
Read Project

 15

 FINISHED 
"AFTER project addresses the challenges posed by the need for vulnerability evaluation and contin-gency planning of the energy grids and energy plants considering also the relevant ICT systems used in protection and control.Project emphasis is on cascading events that can cause catastrophic outages of the electric power systems.The main addressed problems are related to high impact wide spread mul ...
Read Project

 14

 FINISHED 

Future Deep Sea Wind Turbine Technologies (DeepWind)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

The hypothesis of this project is that a new wind turbine concept developed specifically for offshore application has potentials for better cost efficiency than existing offshore technology. Based on this hypothesis the objectives are: i)to explore the technologies needed for development of a new and simple floating offshore concept with a vertical axis rotor and a floating and rotating foundation ...
Read Project

 12

 FINISHED 
The present project provides the necessary support to the EEGI Team gathering, in a structured and organised way, a team of top level players (research centres, SMEs, universities, in close coordination with ENTSO-e and EDSO for SG) to design in a coordinated way with both TSOs and DSOs a set of accompanying activities to make sure that the EEGI will pass through the critical 2012-2014 period (pre ...
Read Project

 13

 FINISHED 
"The objective of the FRISBEE (Food Refrigeration Innovations for Safety, consumers’ Benefit, Environmental impact and Energy optimisation along the cold chain in Europe) project is to provide new tools, concepts and solutions for improving refrigeration technologies along the European food cold chain. At all stages the needs of consumer and European industry will be considered.The project will de ...
Read Project

 26

 FINISHED 
"Hydrogen is an important energy carrier as a viable future clean transport fuel. H2-fuelled vehicles are affordable, infrastructure investments are manageable and H2 and electric mobility are required to meet future CO2 emission targets. Plans are made to implement H2-refuelling infrastructure in Germany followed by roll-out over Europe by 2015. Logistically, liquid H2 appears the only viable opt ...
Read Project

 8

 FINISHED 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Read Project

 29

 FINISHED 

Thermal Systems Integration for Fuel Economy (TIFFE)

Start date: Jun 1, 2009, End date: Mar 31, 2013,

"The project is devoted to the development of an innovative Integrated Vehicle Thermal System based on the integration of vehicle thermal systems to improve the on board thermal management and the energy efficiency. The major project contents are:- Dual loop air conditioning: one loop to transfer the cooling power and one loop to reject the heat- Two-levels temperature heat rejection system: one ...
Read Project

 6

 FINISHED 
The ECCSEL consortium teams up selected Centres of Excellence on CCS across Europe (Norway, Poland, France, Italy, Germany, Spain, Greece, UK, Netherlands and Switzerland). The mission is to develop (i.e. build and operate) a European distributed, goal-oriented, integrated Research Infrastructure, to:• Provide a dynamic scientific foundation to respond systematically to the urgent R&D needs in CCS ...
Read Project

 15

 FINISHED 

Large-scale CCS Transportation infrastructure in Europe (COCATE)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

"All ongoing projects on CO2 transport are focusing on CO2 coming from power plants having their own CO2 capture process. No single project considers multiple different smaller sources. The technical problems involved are different, due to the multiple combination of fumes and CO2 mixtures; further, the need of a low pressure pooling network adds additional complexity to the problem. The objective ...
Read Project

 10