Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Blood-based biomarkers such as Circulating Tumor Cells (CTCs), circulating free tumor DNA (cfDNA) and microRNAs (miRNAs) have the potential to improve the development of personalized medicines for cancer patients. This is of particular importance when biopsies of the primary tumor or metastases are not accessible (e.g. at early disease stages or in minimal residual disease) or possible and the ass ...
Read Project

 34

 FINISHED 
The main objective of this proposal is to develop reliable GaN-based power devices and systems for high and medium power electronics targeting industrial and automotive applications and bringing the GaN power devices another step towards the wide usability in the energy saving environment to further tap the full potential which this new material brings along.This proposal addresses two subjects, o ...
Read Project

 11

 FINISHED 

Machine Learning for Personalized Medicine (MLPM2012)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"Over the last decade, enormous progress has been made on recording the health state of an individual patient down to the molecular level of gene activity and genomic information – even sequencing a patient’s genome for less than 1000 dollars is no longer an unrealistic goal. However, the ultimate hope to use all this information for personalized medicine, that is to tailor medical treatment to th ...
Read Project

 11

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

ALLIER MOBILITE PLUS

Start date: Jul 1, 2014, End date: Jun 30, 2016,

Our three vocational schools have made International Openness a key priority in their school project. Working together in a consortium for the second year,all three schools want ,with the 'ALLIER MOBILITY PLUS'project,to improve students' employability chances through work placements in European companies and to enhance the European dimension of their schools by receiving young people from Europea ...
Read Project

 13

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 
During the last century, significant scientific progress has more than doubled the average lifetime of developed countries inhabitants. This amazing result is the indirect consequence of X-rays discoveryin 1901, of antibiotics in the late 20s, of advances in surgery with the first heart transplant in the late 60s, to name just a few representative examples. In the new millennium, eHealth will like ...
Read Project

 11

 FINISHED 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Start date: Oct 1, 2011, End date: Oct 31, 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Read Project

 28

 FINISHED 

Transformative, Adaptive, Responsive and enGaging EnvironmenT (TARGET)

Start date: Jan 1, 2009, End date: Oct 31, 2012,

There is a need to reduce the knowledge worker "time-to-competence". The main aim is to develop a new genre of TEL environment that supports rapid competence development within the domains of innovation and project management.The TARGET environment consists of a learning process supported by the TARGET platform, consisting of a main core of a serious game. Here, the learner is presented with compl ...
Read Project

 22

 FINISHED 
...tional cooperation, by linking the EC funded Health-e-Child project with leading institutions such as the American College of Cardiology, Johns Hopkins University, Technical University of Munich, and Siemens Corporate Research. Sim-e-Child is an extension of the Health-e-Child platform that:•Interconnects the Health-e-Child database with new data from two prospective US multicenter studies•Enhance ...
Read Project

 9

 FINISHED 

Organic LED Lighting in European Dimensions (OLED100.eu)

Start date: Sep 1, 2008, End date: Aug 31, 2011,

The overall goal of OLED100.eu is to develop all the necessary technologies forming the basis for efficient OLED applications for the general lighting industry in Europe. The European Council has agreed to cut at least 20% in CO2 emission by 2020. Recent studies conducted by the JRC of the EC show a huge potential for saving energy by better energy efficiency. Still, some citizens are not aware t ...
Read Project

 15

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22

 FINISHED 
The OPTIMIX project will focus on studying innovative solutions enabling enhanced video streaming in an IP based wireless heterogeneous system, based on cross layer adaptation of the whole transmission chain.To achieve this goal, it is proposed to develop a scheme including all elements of major importance in a point to multi point video streaming chain, in particular video coding, networking mo ...
Read Project

 9