Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 

VIMSEN: Virtual Microgrids for Smart Energy Networks (VIMSEN)

Start date: Feb 1, 2014, End date: Jan 31, 2017,

The subsidy feed in tariff policy, which has recently been adopted for accelerating renewable energy investments, cannot be retained as a sustainable business model for the future smart energy grid. This is mainly because this policy increases the energy cost, especially when the amount of the energy generated by renewable sources is not negligible compared to that generated by traditional ones, a ...
Read Project

 8

 FINISHED 
The current requirements of the Post Combustion CO2 Capture (PCC) technology are: a) Reducing the parasitic energy load, b) Effectively addressing corrosion, c) Faster absorption/stripping rates, d) Less viscosity and less use of water, e) Confronting the problem of solvent degradation and volatility. These problems pose stimulating challenges for the synthesis of new solvents, aided by detailed m ...
Read Project

 10

 FINISHED 
INERTIA will introduce the Internet of Things/Services principles to the Distribution Grid Control and DSM Operations. It will provide an overlay network for coordination and active grid control, running on top of the existing grid and consisting of distributed and autonomous intelligent Commercial Prosumer Hubs. This way, it will address the present "structural inertia" of DG by introducing more ...
Read Project

 11

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 
A new technology towards breakthrough innovation in solvent based post-combustion CO2 capture for enhanced energy efficiency, improved cost effectiveness and increased process sustainability and environmental benefits is developed. Advances in the identification of highly performing solvents and solvent blends in CO2 absorption, the design of innovative separation equipment internals, and the deve ...
Read Project

 12

 FINISHED 

Research into Impacts and Safety in CO2 Storage (RISCS) (RISCS)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

...sed expertise, enabling us to assess both northern and southern European impacts scenarios, onshore and offshore. To maintain a full external perspective on the research, from both scientific and public acceptance viewpoints, we have enlisted leading CCS experts from CSLF partner countries, two NGOs, the IEA GHG programme and industry."
Read Project

 23

 FINISHED 
...nt and protection of the water resources of the project area recognized. 2. Cross-border communication among partners and among stakeholders of both countries established and awareness of the general public regarding sustainable water management raised. 3. Cross-border cooperation among the project competent authorities of the two sides of Aoos/Vjosa River Basin improved.4. Capacity of the compete ...
Read Project

 5

 FINISHED 
PowerUp aims to develop the Vehicle-2-Grid (V2G) interface, involving a full development cycle of physical/link-layer specification, charging control protocol design, prototyping, conformance testing, field trials, and standardisation. Its results will ensure that FEVs smoothly integrate into emerging smart-grid networks. Thereby the efficiencies resulting from robust grid operation may be achieve ...
Read Project

 11

 FINISHED 
The DEBCO project responds to the need for further operational experience in high share biomass co-firing using different type of fuels. The project aim to demonstrate and assess, on a long term basis, the advanced and innovative co-firing techniques that are capable of achieving higher shares of biomass up to 50% more on a thermal basis. These objectives will be achieved through a programme of r ...
Read Project

 18

 FINISHED 

South-East European TSO Challenges (SEETSOC)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

...ured with the participation of two TSOs and two academic institutions from EU neighboring countries. The results/products of the project that are in electronic form (software, data) will be publicly available (open source) to researchers and businesses for further development and implementation.
Read Project

 16

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 

Mobile Energy Resources in Grids of Electricity (MERGE)

Start date: Jan 1, 2010, End date: Dec 31, 2011,

Electric power systems are facing a major new challenge (and hence opportunity): future massive integration in the electric grid of electric plug-in vehicles (EV). Distribution and transmission grids and power system architectures still follow planning rules and procedures defined for the traditional operational paradigm. Therefore, it is necessary to identify and prepare solutions for the operati ...
Read Project

 16

 FINISHED 
Current smart house/energy technologies treat home and working environments as effectively consisting of isolated and passive individual units. This severely limits achieved energy efficiency, as it ignores the potential delivered by homes, offices, and commercial buildings seen as intelligent networked collaborations. Thus, the SmartHouse/SmartGrid project introduces a holistic concept for smart ...
Read Project

 8

 FINISHED 
Nowadays, wind power has an increasing share in the electricity generation mix in several European countries. Due to the intermittent nature of wind, the large-scale integration of wind power causes several difficulties in the management of a power system. Often, a high level of reserves is allocated to account for wind power variability, thus reducing the benefits from the use of wind energy.Toda ...
Read Project

 22

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22

 FINISHED 
Designing ICT for managing the smart grids with integrated microgrids is a challenge that cannot be won by a single utility, industry or country. It requires collaboration of all Stakeholders, in an interdisciplinary approach that brings together experiences from the different countries with their different situations and from different viewpoints, in order to contribute to a scalable system that ...
Read Project

 24