Search for European Projects

20 European Projects Found

Searched on 125080 European Projects

 FINISHED 
ALTAIR’s strategic objective is to demonstrate the feasibility of a new cost effective and reliable space launch system for the access to Low-Earth Orbit (400-1000 km) of small satellites ranging from 50 to 150 kg. The ALTAIR launch system aims to be the expected answer to the needs of small satellites users, providing an affordable and adapted access to space service, without the constraints of c ...
Read Project

 8

 FINISHED 
REMAGHIC is focused on contributing to Europe’s rare earth recovery and magnesium recycling technologies, improving the efficiencies of these processes and advancing the technology readiness levels for a new generation of industrial processes that will produce new low cost competitive alloys for a wide variety of sectors across Europe’s manufacturing value chain. The project motivation lies on the ...
Read Project

 10

 FINISHED 

Aeroelastic Gust Modelling (AEROGUST)

Start date: May 1, 2015, End date: Apr 30, 2018,

Encounters with atmospheric turbulence are a vitally important in the design and certification of many manmade structures such as aircraft and wind turbines. Gusts cause rapid changes in the flow about the structures which leads to rigid and flexible unsteady responses. Knowledge of aircraft/gust interactions is therefore vital for loads estimation during aircraft design as it impacts on control s ...
Read Project

 13

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 
"Due to strong competitiveness and considerable increasing of techno-logical demand in terms of performance and reliability of constituting components, aircraft manufacturers are constantly urged to invest in innovative design technologies so as to reduce aircraft development costs and delivery time. Moreover, manufacturing restrictive quality constraints and the limits imposed to industrial budge ...
Read Project

 9

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 

Wings of the future (FUTUREWINGS)

Start date: Jun 1, 2013, End date: Jul 31, 2015,

The project moves starting from a very simple concept: let us think of an airplane as a great body with its end structures that could have the possibility to change their shape as they had internal nerve endings and muscles.The aerodynamic shape of aircraft lifting surfaces must change during the flight, owing to the aerodynamic requirements of the different maneuvers (ascent and descent operation ...
Read Project

 4

 FINISHED 

RECEPTivity and amplitude-based transition prediction (RECEPT)

Start date: Feb 1, 2011, End date: Apr 30, 2015,

... of 12 organisations from 4 different member states (Sweden, Italy, France Germany) and one of International Cooperation Partner Countries, Russia. It contains 3 aircraft manufacturers (Airbus, SAAB, Piaggio), 5 research organisations (CIRA, DLR, FOI, ITAM, ONERA) and 4 universities (Kungliga Teknika Högskolan, Università di Genova, Università di Salerno, Universität Stuttgart). Participation of i ...
Read Project

 12

 FINISHED 
"Aeronautics is a key asset for the future of Europe, but nowadays the industry has to face the challenge of “More Affordable, Safer, Cleaner and Quieter” while at the same time accounting for a demand that will triple over the next 20 years. WASIS project aims to rise to this challenge with the development of a composite fuselage structure based on the lattice stiffening concept, optimizing geome ...
Read Project

 14

 FINISHED 
Aviation has dramatically transformed society over the past 100 years. Fast and efficient transportation has essentially been “shrinking the planet” and changing the landscape in terms of financial and societal conditions. The growth of air traffic over the past 50 years has been spectacular, and will continue in the future. This anticipated growth carries along challenges and opportunities in va ...
Read Project

 4

 FINISHED 

Advanced In-flight Measurement Techniques 2 (AIM²)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

"Flight tests of new or modified aircraft are a necessary part of the design process and provide the final validation of the full scale aircraft design. Flight testing for certification is a critical phase as all trials proving compliance with specifications and regulations must be completed in the shortest possible time, while maintaining high quality standards in the certification process. Usual ...
Read Project

 10

 FINISHED 
"Today, advanced composites use either layers of plies impregnated with resin (pre-pregs) to form a laminate, or Liquid Composites Moulding (e.g. RTM) of dry textiles. Prepreg composites give superior mechanical properties due to toughened resins and high fibre content, but suffer from high material costs, limited shapeability, complex, expensive and time consuming manufacturing, and limited mater ...
Read Project

 15

 FINISHED 
"DeSiReH focus on both, the numerical design tools and the experimental measurement techniques for cryogenic conditions, with the objective to improve the industrial design process for laminar wings in terms of product quality, efficiency, and development cost reduction. The work focuses on the design of high lift devices. DeSiReH addresses the following quantified objectives which will make a sig ...
Read Project

 21

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 

Small Air Transport - Roadmap (SAT-Rdmp)

Start date: Jan 1, 2011, End date: Mar 31, 2013,

The Small Air Transport (SAT) focuses on the new mode affordable, accessible, energy effective component of Air Transport System. It fills niche between Surface and Scheduled Air Transport.This future SAT system will provide a wide choice of transportation mode - and the wider use of small aircraft, served by small airports, to create access to more communities in less time.The goal of the propos ...
Read Project

 14

 FINISHED 

Smart High Lift Devices for Next Generation Wings (SADE)

Start date: May 1, 2008, End date: Oct 31, 2012,

"All aerodynamic concepts for significant reduction of drag such as laminarisation require slim high-aspect-ratio wings. However, state-of-the-art high lift systems will suffer from the reduced construction space and do not cope with the required surface quality. Thus, SADE (Smart High Lift Devices for Next Generation Wings) develops suitable 'morphing' high lift devices: The seamless 'smart leadi ...
Read Project

 13

 FINISHED 

EXTreme ICing Environement (EXTICE)

Start date: Jun 1, 2008, End date: May 31, 2012,

"More recent aircraft incidents and accidents have highlighted the existence of icing cloud characteristics beyond the actual certification envelope defined by the JAR/FAR Appendix C, which accounts for an icing envelope characterized by water droplet diameters up to 50 μm (so-called cloud droplet). The main concern is the presence of super-cooled large droplets (SLD) such as freezing drizzle, in ...
Read Project

 14

 FINISHED 

Aerodynamic loads estimation at extremes of the flight envelope (ALEF)

Start date: May 1, 2009, End date: Apr 30, 2012,

"ALEF's objective is to enable the European aeronautical industry to create complete aerodynamic models of their aircraft based on numerical simulation approaches within the respective development processes. I.e. ALEF will kick-off a paradigm shift from greater confidence in experimentally measured loads data to greater confidence in computational results. Beyond the scope of ALEF this paradigm sh ...
Read Project

 20

 FINISHED 

Self reconfigurable intelligent swarm fixtures (SwarmItFIX)

Start date: Oct 1, 2008, End date: Jan 31, 2012,

A step beyond flexible/reconfigurable fixtures for higher continuous adaptation of production resources respect to production objectives and technical conditions in the knowledge-based factory is achievable today by synergic convergence of the NMP themes of flexible fixtures, parallel robots and new/smart materials with the ICT themes of robot swarms with networked embedded control. Today’s smarte ...
Read Project

 6