Search for European Projects

7 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Autonomic Service-Component Ensembles (ASCENS)

Start date: Oct 1, 2010, End date: Mar 31, 2015,

Description Future software-intensive systems, such as sensor networks, power grids, satellite and robot swarms, will generally exhibit a number of characteristic features:Massive numbers of nodes, nodes with complex behavior, or complex interactions between nodes.Operation in open and non-deterministic environments with variable network top ...
Read Project

 17

 FINISHED 
LABOHR aims to develop Ultra High-Energy battery systems for automotive applications making use of lithium or novel alloy anodes, innovative O2 cathode operating in the liquid phase and a novel system for harvesting O2 from air, which can be regenerated during their operative life without need of disassembling. LABOHR has 5 key objectives: (i) development of a green and safe electrolyte chemistry ...
Read Project

 11

 FINISHED 

Car multi propulsion integrated power train (CASTOR)

Start date: Jun 1, 2010, End date: Nov 30, 2013,

The main objective of CASTOR is to integrate an innovative distributed propulsion system on fully electrical vehicles. Future electrical propulsion concepts demand more efficiency and less complexity with great functionality, high robustness and light weight and need to run in a wide ambient temperature range.CASTOR is aimed at:•Energy saving of 10 - 20% in respect to present propulsion systems•Co ...
Read Project

 7

 FINISHED 

interactIVe

Start date: Jan 1, 2010, End date: Nov 30, 2013,

The interactIVe project addresses the development and evaluation of next-generation safety systems for Intelligent Vehicles, based on active intervention. Safety technologies have shown outstanding capabilities for supporting the driver in hazardous situations. Despite their effectiveness, currently available systems are typically implemented as independent functions. This results in multiple expe ...
Read Project

 32

 FINISHED 

Optimized Fuels for sustainable transport in Europe (OPTFUEL)

Start date: Jan 1, 2009, End date: Dec 31, 2012,

OPTFUEL undertakes a first large scale demonstration of the Biomass to Liquid (BtL) production chain from biomass via gasification and fuel synthesis to the final fuel in the consumer car. BtL production will be demonstrated in an industrial size plant environment (15000 t/a). All production chain components from biomass provision up to market introduction of final consumer fuels containing BtL wi ...
Read Project

 11

 FINISHED 

Automotive Fuel Cell Stack Cluster Initiative for Europe (Auto-Stack)

Start date: Jan 1, 2010, End date: Sep 30, 2011,

While the supply base for materials and components in Europe is well advanced and competitive, stack integration is lagging behind due to massive investment requirements and risks associated with commercialization. The project aims to develop approaches to address the critical barriers for substantial improvement of collaboration between major stakeholders and establishing a solid business model f ...
Read Project

 15

 FINISHED 

PRE-DRIVE

Start date: Jul 1, 2008, End date: Sep 30, 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ ...
Read Project

 27