Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 

GALAXY: Gut-and-liver axis in alcoholic liver fibrosis (GALAXY)

Start date: Jan 1, 2016, End date: Dec 31, 2021,

Alcohol overuse is an important societal challenge with annual healthcare costs of over €22 billion in Europe. Alcohol is the main cause of liver cirrhosis, which is the 5th and 7th most common cause of life years lost in respectively Eastern and Western Europe. Cirrhosis is considered irreversible but its precursor, liver fibrosis, is reversible when detected before disease progression. GALAXY pr ...
Read Project

 12

 FINISHED 
SafeCOP (Safe Cooperating Cyber-Physical Systems using Wireless Communication) will establish a safety assurance approach, a platform architecture, and tools for cost-efficient and practical certification of cooperating cyber-physical systems (CO-CPS).SafeCOP targets safety-related CO-CPS characterized by use of wireless communication, multiple stakeholders, dynamic system definitions, and unpredi ...
Read Project

 29

 FINISHED 
Allergy is the most prevalent chronic inflammatory disease, having great socio-economic impact. Chronic lifelong dependency on symptomatic drugs is an expensive reality for the vast majority of allergy sufferers. Allergen-specific immunotherapy is the only causal and effective treatment targeting the underlying immune mechanism in a more cost-effective way. Yet, long treatment duration and risk of ...
Read Project

 10

 FINISHED 
The FAST project aims at the development of safe and effective treatment of food allergies. It targets persistent and severe allergy to fish and fruit. Besides persistence and severity, this choice is based on prevalence and the importance of these foods for a healthy diet. Classical allergen-specific immunotherapy (SIT) for treatment of food allergy using subcutaneous injections with food extract ...
Read Project

 19

 FINISHED 
Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Read Project

 46

 FINISHED 
Europe is facing a rapidly growing threat from Type 2 diabetes mellitus (T2D), which is undoubtedly associated with an unhealthy diet and a more sedentary lifestyle. Evidence is accumulating that gestational diabetes mellitus (GDM) may be playing a role in this process. Thus it provides a significant opportunity for preventing future T2D. Not only is GDM prevalence on the rise, but intrauterine ex ...
Read Project

 18

 FINISHED 

Adopting Hospital Based Health Technology Assessment in EU (AdHopHTA)

Start date: Sep 1, 2012, End date: Nov 30, 2015,

The use of HTA as a part of the decision-making process at national, regional, and international levels has evolved considerably over the past 35 years. However, still an important number of good-value innovative HTs never reach clinical practice while, in many instances, others with no significant added value actually do. This situation can be effectively overcome by approaching HTA at hospital l ...
Read Project

 11

 FINISHED 

Mechanisms of the Development of ALLergy (MEDALL)

Start date: Dec 1, 2010, End date: May 31, 2015,

Causes explaining the epidemic of IgE-associated (allergic) diseases are unclear. MeDALL (Mechanisms of the Development of Allergy) aims at generating novel knowledge on mechanisms of allergy initiation, in particular in childhood. To understand how a complex network of genetic and environmental factors leads to complex allergic phenotypes, a novel stepwise, large and integrative translational app ...
Read Project

 24

 FINISHED 

COLLaboration for INnovation (COLLIN)

Start date: Sep 30, 2012, End date: May 30, 2014,

COLLIN soll die begonnene Kollaboration aus dem Projekt ROBIN (ROBotics – Innovations in Healthcare) zwischen dem Odense Universitetshospital (OUH) und dem Universitätsklinikum Schleswig-Holstein (UKSH) in eine längerfristige Partnerschaft leiten und das initiierte Netzwerk pflegen und weiter ausbauen. Das mittelfristige Ziel dabei ist es, die Grenzregion als Standort für innovative Technologien i ...
Read Project

 2

 FINISHED 
The aim of MARINE FUNGI is the demonstration of sustainable exploitation of marine natural resources providing appropriate culture conditions for the underutilised group of marine fungi, thus enabling efficient production of marine natural products in the laboratory and also in large scale cultures, avoiding harm to the natural environment. The focus of MARINE FUNGI are new anti-cancer compounds T ...
Read Project

 14

 FINISHED 
...en nach Nierentransplantation eine lebenslange Therapie, um den Verlust des transplan-tierten Organs zu vermeiden. Als Kooperationspartner haben die nephrologischen Kliniken am Universitets-hospital Odense und der Universitätsklinik Kiel gemeinsam ein Projekt konzipiert, um die Versorgung von Patienten nach Nierentransplantation nachhaltig zu verbessern. Durch ein neues wissenschaftliches Verfah-r ...
Read Project

 2

 FINISHED 
"Current interventional treatment of acute myocardial infarction (AMI) focused on re-establishing cardiac reperfusion has significantly improved clinical outcome by reducing infarct size and mortality due to cardiac ischemia.It is now recognized that events triggered at reperfusion also result in cell death and may account for as much as 50% of the infarct volume, this being termed ischemia-reperf ...
Read Project

 18

 FINISHED 

Health Games

Start date: Aug 30, 2010, End date: May 30, 2013,

Das Projekt verfolgt das direkte Ziel, zwei bis vier Prototypen für Gesundheitsspiele mit geschäftlichem Potenzial zu schaffen. Im Gesundheitswesen sollen Spiele die Online-Kommunikation mit Patienten verbes-sern, reale Situationen und Körperfunktionen simulieren und die Rehabilitation fördern. Möglichkeiten der optimalen Zusammenarbeit zwischen der Spiele-/IT-Branche und klinischen Partnern im Hi ...
Read Project

 4

 FINISHED 

INnovations for healthcare (ROBIN ROBotics)

Start date: Aug 6, 2009, End date: Oct 30, 2012,

Der potentielle ökonomische und gesellschaftliche Nutzen der Verwendung von Robotertechnologie in der Medizin (Healthcare Robotics) ist enorm, die bisherige Verwendung dieser Technologie auf beiden Seiten der Grenze steht dazu leider in keinem Verhältnis. Dies zu ändern ist Ziel des Projektes. Während der däni-sche Partner über einige reife innovative Lösungen verfügt, kann der deutsche Partner du ...
Read Project

 2

 FINISHED 

Clinical Continuity by Integrated Care (Homecare)

Start date: Apr 1, 2009, End date: Mar 31, 2012,

Our comprehensive approach to clinical continuity by integrated care (IC) across the secondary-primary interface departs from a preliminary literature review selecting frequent chronic conditions (CC) as stroke, COPD and HF as our focus areas. However, within each of these areas IC is a small activity, still, requiring more basic research. As IC for these different CC are based on the same patient ...
Read Project

 13

 FINISHED 
• BackGround to the ProposalEFLTHO (European Framework for Lean Training in Healthcare operations) will focus on transfer of LEAN training developed as a result of the Development of Innovation project Lean Across Europe (LeanXEur –project number LdV 153116) to Health Operations. Lean, as a concept, is concerned with Efficiency. The LEAN approach involves the systematic elimination of all non-valu ...
Read Project

 9