Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Aggression is a basic physiological trait with important roles throughout evolution, both in defence and predation. When expressed in humans in the wrong context, aggression leads to maladjustment, social impairment and crime. Despite this, knowledge about aggression aetiology is limited and current treatment strategies are insufficient. Contingent to a subdivision into impulsive and instrumental ...
Read Project

 27

 FINISHED 
Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Read Project

 30

 FINISHED 
Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Read Project

 68

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 

FREVUE VALIDATING FREIGHT ELECTRIC VEHICLES IN URBAN EUROPE (FREVUE)

Start date: Mar 15, 2013, End date: Sep 14, 2017,

Eight of Europe’s largest cities, will demonstrate that electric vehicles operating “last mile” freight movements in urban centres can offer significant and achievable decarbonisation of the European transport system. Demonstrators will be deployed in Amsterdam, Lisbon, London, Madrid, Milan, Oslo, Rotterdam and Stockholm. The demonstrators have been designed to ensure FREVUE covers the breadth of ...
Read Project

 30

 FINISHED 
Buildings consume about 40% of total final energy in Europe, and those built before 1980 represent 95% of this energy consumption. The low renovation rate of building stock (1% per year) means that boosting energy efficient buildings’ retrofitting is the only way to reach EU’s “20-20-20” targets. The higher impact will be achieved through interventions in non-residential buildings, as their energy ...
Read Project

 22

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
Indoor Air Quality and emissions from building materials have been over the last decades a major challenge for scientists, industry and consumers. Traditional construction materials contribute to contaminants such as VOCs, formaldehyde, particulates and fibres. However, new eco-innovative building materials are able to provide a healthier indoor environment both by substituting source of contamina ...
Read Project

 22

 FINISHED 

Resilience-Increasing Strategies for Coasts - toolKIT (RISC-KIT)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

"Resilience-Increasing Strategies for Coasts – toolKIT (RISC-KIT) will deliver ready-to-use methods, tools and management approaches to reduce risk and increase resilience to low-frequency, high-impact hydro-meteorological events. The open-source and free-ware RISC-KIT tool kit will consist of ● a Coastal Risk Assessment Framework (CRAF) which - at the regional scale (100’s km) - can quickly asses ...
Read Project

 18

 FINISHED 
eDIGIREGION is a unique collaborative project that brings together a balanced blend of complimentary and experienced partners from four diverse regions. The sixteen (16) people involved in formulating this proposal are senior executives and decision makers in their respective organisations. These partners have embarked upon, are committed to, and have already demonstrated the power of transnationa ...
Read Project

 16

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
Recent advances in our understanding and forecasting of climate and climate change have brought us to the point where skilful and useful predictions are being made. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. Howeve ...
Read Project

 26

 FINISHED 
NIWE project will demonstrate a new production process able to decrease the embodied energy of the foundry products by over 25%, reducing drastically its carbon footprint. The demonstration will be performed in the aluminium, iron and steel sectors.The expected energy efficiency gains are due to a new furnace that, by means of a power transmission system based on induction, will allow a highly fle ...
Read Project

 10

 FINISHED 
MobilePass will focus on research and development towards technologically advanced mobile equipment at land border crossing points. This will allow border control authorities to check European, visa-holding and frequent third country travellers in a comfortable, fast and secure way. The mobile solution incorporates new technologies needed in mobile scenarios and embeds them in the actual border cr ...
Read Project

 12

 FINISHED 
Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Read Project

 19

 FINISHED 
The mouse shows great similarities in development, physiology and biochemistry to humans, which makes it a key model for research into human disease. The major challenges for mouse functional genomics in the 21st century are to:• Develop a series of mutant alleles for every gene in the mouse genome• Determine the phenotypic consequences of each mutation• Identify mouse models for the complete dise ...
Read Project

 24

 FINISHED 
The objectives are to:(i) improve our understanding of human activities impacts (cumulative, synergistic, antagonistic) and variations due to climate change on marine biodiversity, using long-term series (pelagic and benthic). This objective will identify the barriers and bottlenecks (socio-economic and legislative) that prevent the GES being achieved(ii) test the indicators proposed by the EC, an ...
Read Project

 25

 FINISHED 

WeSenseIT: Citizen Observatory of Water (WESENSEIT)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

WeSenseIt will develop a citizen-based observatory of water, which will allow citizens and communities to become active stakeholders in information capturing, evaluation and communication.We propose:(i) data collection: (a) a first “hard” layer consisting of low-cost, static and portable devices that sense and transfer water information when automatically monitored or when initiated by citizens fr ...
Read Project

 15

 FINISHED 

Federation for FIRE (Fed4FIRE)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Read Project

 43

 FINISHED 

European Medicines Research Training Network (EMTRAIN)

Start date: Oct 1, 2009, End date: Sep 30, 2016,

EMTRAIN is an essential element for the success of the IMI Education & Training (E&T) Call Topics in Europe (current and future). It will establish a pan-European platform of excellence for education and training covering the whole life-cycle of medicines from basic research through clinical development to pharmaco-vigilance. It will underpin the successful delivery of the current and future IMI-f ...
Read Project

 32

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
PhoxTrot is a large-scale research effort focusing on high-performance, low-energy and cost and small-size optical interconnects across the different hierarchy levels in Data Center and High-Performance Computing Systems: on-board, board-to-board and rack-to-rack. PhoxTrot will tackle optical interconnects in a holistic way, synergizing the different fabrication platforms (CMOS electronics, Si-pho ...
Read Project

 22

 FINISHED 
"Competitive manufacturing industry must be able to react to change and to understand the balance of possible options when making decisions on complex multi-faceted problems. Understanding how best to configure and re-configure a global production network, set against rapidly changing product-service requirements is one such complex problem area. This project aims to provide services that support ...
Read Project

 15

 FINISHED 
Description SME-suitable robots that assist in managing uncertainty by symbiotic Human-Robot-Interaction and embedded cognition Over two-thirds of European workers in manufacturing are employed in small and medium-sized enterprises (SMEs). While robots are able to carry out repetitive tasks to a h ...
Read Project

 26

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 

Total Diet Study Exposure (TDSEXPOSURE)

Start date: Feb 1, 2012, End date: Jan 31, 2016,

Total Diet Studies (TDS) allow getting information on real dietary exposure to food contaminants consumption (heavy metals, mycotoxins, POPs...) and estimating chronic exposure to pesticide residues in food and food additives intake. TDS consider total exposure from whole diets and are based on food contamination as consumed rather than contamination from raw commodities, thus ensuring a realistic ...
Read Project

 33

 FINISHED 
The SME E-COMPASS project offers real-time and on-demand web-based applications and services to SME e-commerce providers that they could not afford or do not have the business capacity for ordering customized applications from large IT and software providers.In an attempt to overcome time and scale limitations in these complex market conditions and threats for SME e-commerce providers, the SME E-C ...
Read Project

 13

 FINISHED 
The aims of the NanoMaster project are to reduce the amount of plastic used to make a component by 50% and hence reduce component weight by 50%, at the same time as imparting electrical and thermal functionality. This will be achieved by developing the next generation of graphene-reinforced nano-intermediate that can be used in existing high-throughput plastic component production processes.Graphe ...
Read Project

 14

 FINISHED 

Role Of Biodiversity In climate change mitigatioN (ROBIN)

Start date: Nov 1, 2011, End date: Oct 31, 2015,

To realise the full potential of tropical forests in climate change mitigation (CCM) & the provision of other ecosystem services in the face of ongoing global change we must improve our understanding of the relationships between biodiversity (BD) and the socio-ecological processes through which we respond & adapt to change.ROBIN will provide information for policy & resource use options under scen ...
Read Project

 12

 FINISHED 
GREENLION is a Large Scale Collaborative Project with the FP7 (topic GC.NMP.2011-1) leading to the manufacturing of greener and cheaper Li-Ion batteries for electric vehicle applications via the use of water soluble, fluorine-free, high thermally stable binders, which would eliminate the use of VOCs and reduce the cell assembly cost.GREENLION has 6 key objectives: (i) development of new act ...
Read Project

 19

 FINISHED 
Water supply involves many actors. While many management tools exist, they cannot intercommunicate and no framework is available for integrating all of them, preventing integrated water resources management to be fully achieved. WatERP will develop a web-based Open Management Platform (OMP), integrating intelligent systems through open interfaces, to enable water supply distribution chains to be m ...
Read Project

 11

 FINISHED 
Our knowledge of the causative links between subsurface processes, resulting unrest signals and imminent eruption is, today, wholly inadequate to deal effectively with crises of volcanic unrest. The VUELCO project consortium has come together for a multi-disciplinary attack on the origin, nature and significance of volcanic unrest from the scientific contributions generated by collaboration of ten ...
Read Project

 10

 FINISHED 

High Power, high Reliability offshore wind technology (HIPRWIND)

Start date: Nov 1, 2010, End date: Jun 30, 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Read Project

 22

 FINISHED 
The EVARILOS project addresses one of the major problems of indoor localization research: The pitfall to reproduce research results in real life scenarios suffering from uncontrolled RF interference and the weakness of numerous published solutions being evaluated under individual, not comparable and not repeatable conditions.Accurate and robust indoor localization is a key enabler for context-awar ...
Read Project

 5

 FINISHED 
ANIMALCHANGE will provide scientific guidance on the integration of adaptation and mitigation objectives and design sustainable development pathways for livestock production in Europe, in Northern and Sub-Saharan Africa and Latin America. ANIMALCHANGE will inform public policy development in EU27 and propose cooperation programs addressing smallholder livestock farming in selected developing count ...
Read Project

 25

 FINISHED 
Description TIMBUS extends traditional digital preservation approaches by introducing the need to analyse and preserve services, and by aligning preservation actions with business continuity management.A primary motivation for TIMBUS is the declining use of centralised in-house business processes. Based on the concept of software as a ser ...
Read Project

 12

 FINISHED 

Highly-complex and networked control systems (HYCON2)

Start date: Sep 1, 2010, End date: Nov 30, 2014,

ICT developments both enable and also enforce large-scale, highly-connected systems in society and industry. Knowledge to cope with these emerging systems is lacking. HYCON2 will stimulate and establish the long-term integration of the European research community, leading institutions and industry in the strategic field of control of complex, large-scale, and networked dynamical systems. It will i ...
Read Project

 30

 FINISHED 
The interest in bottom-up fabricated semiconductor nanowires (NWs) has been growing steadily in the last years due to their potential as basic building blocks of nanoscale devices and circuits. Investigations performed so far try to exploit three unique properties of NWs: First, they are the smallest dimension structures that allow optical guiding and electrical contacting simultaneously. Second, ...
Read Project

 12