Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"SOLUTIONS will deliver a conceptual framework for the evidence-based development of environmental and water policies. This will integrate innovative chemical and effect-based monitoring tools with a full set of exposure, effect and risk models and assessment options. Uniquely, SOLUTIONS taps (i) expertise of leading European scientists of major FP6/FP7 projects on chemicals in the water cycle, (i ...
Read Project

 41

 FINISHED 
European water utilities face many problems related to their 3,5 million km’s of distribution networks. Large parts of water distribution networks have to be rehabilitated requiring investments of € 20 billion/year. Prioritization and optimization of investments is needed urgently. In many countries, water quality needs improvement in order to reduce health risks and resources for water production ...
Read Project

 21

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 
Nanotechnology is a key enabling technology. Still existing uncertainties concerning EHS need to be addressed to explore the full potential of this new technology. One challenge consists in the development of methods that reliably identify, characterize and quantify nanomaterials (NM) both as substance and in various products and matrices. The European Commission has recently recommended a definit ...
Read Project

 30

 FINISHED 
The concept of PolyGraph is to develop new production techniques which will deliver industrial-scale quantities of graphene-reinforced thermosetting polymers, suitable for use in a number of key applications where improvements are needed in the strength, stiffness, toughness, electrical conductivity and thermal properties; such as fibre-reinforced composite resins, coatings and adhesives.The ultim ...
Read Project

 14

 FINISHED 
Drug development in TB requires new integrated methods to transition the novel combination regimens needed to shorten first-line therapy and combat multi-drug resistance. Although new agents are emerging, the path to registration of such regimens remains uncertain while capacity for pivotal trials is limited. Selection and optimization of drug combinations for development depends on preclinical sy ...
Read Project

 23

 FINISHED 
EURenOmics will integrate several established consortia devoted to rare kidney diseases with eminent need and potential for diagnostic and therapeutic progress (i.e. steroid resistant nephrotic syndrome, membranous nephropathy, tubulopathies, complement disorders such a haemolytic uraemic syndrome, and congenital kidney malformations). The Consortium has access to the largest clinical cohorts asse ...
Read Project

 29

 FINISHED 
Currently the aerobic bio-catalytic oxidation reaction is the one that would have the biggest impact on the future uptake of industrial biotechnology in Europe. Chemical oxidation is both hazardous and has high environment impacts. Many oxidative bio-catalytic reactions and transformations have been identified in academic laboratories but only a very small number have been applied by industry to o ...
Read Project

 12

 FINISHED 
Buildings consume about 40% of total final energy in Europe, and those built before 1980 represent 95% of this energy consumption. The low renovation rate of building stock (1% per year) means that boosting energy efficient buildings’ retrofitting is the only way to reach EU’s “20-20-20” targets. The higher impact will be achieved through interventions in non-residential buildings, as their energy ...
Read Project

 22

 FINISHED 

Accelerated Checkpoint Design Integration Test and Evaluation (XP-DITE)

Start date: Sep 1, 2012, End date: Jul 31, 2017,

The aim of the XP-DITE project is to develop, demonstrate and validate a comprehensive, passenger centred approach to the design and evaluation of integrated security checkpoints (CPs) at airports. The approach encompasses a variety of different types of requirements, relating to security, airport operations and societal aspects. An ethical framework will be defined which enables designers and op ...
Read Project

 15

 FINISHED 
Synthetic biology (SynBio) offers huge potential for applications in energy, health and the environment. It also brings with it various challenges such as regulatory issues of biosafety, biosecurity and intellectual property rights, as well as potential environmental and socio-economic risks in developing countries. As yet, however, there is scant public knowledge about the technology. It is thus ...
Read Project

 29

 FINISHED 

SUSTAINABLE NANOTECHNOLOGIES (SUN)

Start date: Oct 1, 2013, End date: Mar 31, 2017,

SUN (Sustainable Nanotechnologies) is the first project addressing the entire lifecycle of nanotechnologies to ensure holistic nanosafety evaluation and incorporate the results into tools and guidelines for sustainable manufacturing, easily accessible by industries, regulators and other stakeholders. The project will incorporate scientific findings from over 30 European projects, national and inte ...
Read Project

 38

 FINISHED 
The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Read Project

 73

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 

Dynamic Management of Physically Coupled Systems of Systems (DYMASOS)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The well‐being of the citizens in Europe depends on the reliable and efficient functioning of large interconnected systems, such as electric power systems, air traffic control, railway systems, large industrial production plants, etc. Such large systems consist of many interacting components, e.g. generation plants, distribution systems, and large and small consumers. The subsystems are usually ma ...
Read Project

 12

 FINISHED 
Late-onset Alzheimer’s disease (LOAD) is a neurodegenerative disorder that currently affects 2% of the population in industrialized countries; the risk of LOAD increases in individuals beyond the age of 70 and it is predicted that the incidence of LOAD will increase 4-fold within the next 50 years which may cause a great socioeconomic problem. Early diagnosis and evidence-based interventions that ...
Read Project

 5

 FINISHED 
Be Wiser examines organisation and technical research challenges in some of Europe’s best known RTD regions. The technology focus is on wireless internet security; while the organisational challenge is to more effectively utilise Triple Helix clusters in regional innovation processes. This approach will strengthen Europe’s position in wireless rollout and address the challenges set out in the Digi ...
Read Project

 14

 FINISHED 
"The aim of this work is to develop an innovative TEC for avionic application with maturity level TRL5, low power consumption and high efficiency and a combination of thermoelectric materials and energy harvesting techniques. The work will be based on the experience gained in previous works of the research team, concerning marine (ECOMARINE) and avionic (RENERGISE) environments and it will investi ...
Read Project

 3

 FINISHED 
The main objectives of FUTUREVOLC are to establish an integrated volcanological monitoring procedure through European collaboration, develop new methods to evaluate volcanic crises, increase scientific understanding of magmatic processes and improve delivery of relevant information to civil protection and authorities. To reach these objectives the project combines broad European expertise in seism ...
Read Project

 27

 FINISHED 

The Open Pharmacological Concepts Triple Store (OPEN PHACTS)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

Drug discovery is data-hungry and all major pharmaceutical companies maintain extensive in-house instances of public data alongside internal. Analysis and hypothesis generation for drug-discovery projects requires assembly, overlay and comparison of data from many sources, requiring shared identifiers and common semantics. Expression profiles need to be overlaid with gene or pathway identifiers an ...
Read Project

 32

 FINISHED 

Integrated non-CO2 Greenhouse gas Observing System (INGOS)

Start date: Oct 1, 2011, End date: Dec 31, 2015,

InGOS will support and integrate the observing capacity of Europe for non-CO2 greenhouse gases (NCGHG: CH4, N2O, SF6, H2 and halocarbons). The emissions of these gases are very uncertain and it is unknown how future climate change will feedback into the land use coupled emissions of CH4 and N2O. The NCGHG atmospheric abundances will increase further in the future and the emissions of these gases a ...
Read Project

 39

 FINISHED 
The Gene2Farm project will address the needs of the cattle industry, in particular of the SMEs and end users, for an accessible, adaptable and reliable system to apply the new genomic knowledge to underpin sustainability and profitability of European cattle farming. Gene2Farm will undertake a comprehensive programme of work from statistical theory development, through genome sequencing, to address ...
Read Project

 19

 FINISHED 
The COSMOS project will address the assessment needs of the cosmetics industry by delivering an integrated suite of computational tools to predict the effects of long-term exposure to cosmetic ingredients in humans, thus reducing the need for repeated dose toxicity testing in animals. To achieve this, individual modules comprising: (new) databases, thresholds of toxicological concern (TTC), in sil ...
Read Project

 15

 FINISHED 

TRANSLATIONAL RESEARCH AND PATIENT SAFETY IN EUROPE (TRANSFoRm)

Start date: Mar 1, 2010, End date: Nov 30, 2015,

TRANSFoRm will develop rigorous, generic methods for the integration of Primary Care clinical and research activities, to support patient safety and clinical research via:1.\tRich capture of clinical data, including symptoms and signs rather than just a single diagnosis. A generic, dynamic interface, integrated with electronic health records (EHR), will facilitate both diagnostic decision support ...
Read Project

 25

 FINISHED 
PV CROPS addresses 3 key objectives of the call topic:1) Improvement of performance, reliability and lifetime2) Cost reduction of PV systems3) Better integration of PV into gridThe 2 first objectives lead to a lower Levelized Cost of Energy, LCoE. So, the main objectives of PV CROPS are:1- Reduction of 30% of the LCoE of PV to achieve 0.14-0.07 €/kWh by 2020 and 0.20–0.09 €/kWh by 2015 and an incr ...
Read Project

 12

 FINISHED 
There are 600,000 beekeepers in the European sector, mainly SME family-owned companies. The revenue generated by this industry is more than €400M in Europe. However, the European Union has a net negative trade-balance in bee products, mainly honey, producing only 54% of its demand (the EU imports from cheaper producers, namely Argentina and China). However, despite its importance and the obvious p ...
Read Project

 9

 FINISHED 
RationaleThe inability of pre-clinical studies to predict clinical efficacy is a major bottleneck in drug development. In severe asthma this bottleneck results from: a lack of useful and validated biomarkers, underperforming pre-clinical models, inadequate and incomplete sub-phenotyping, and insufficient disease understanding.HypothesisThe use of biomarker profiles comprised of various types of hi ...
Read Project

 42

 FINISHED 

Smart Urban Freight SolutIONs (SmartFuSION)

Start date: Apr 1, 2012, End date: Sep 30, 2015,

The SMARTFUSION public-private partnership (PPP) will build upon existing urban freight development strategies of three demonstration regions and to demonstrate smart urban freight solutions on co-operative and sustainable city distribution in urban interurban supply chains. Leading idea is to introduce the concept of the European Green Car Initiative in the last mile operations, introduce innovat ...
Read Project

 16

 FINISHED 
The general objective of Hyproline is to strengthen the competitiveness of the European industry by introducing manufacturing methods, which will allow companies to 1) reduce time-to-market and number of rejects, 2) make more customized and innovative products with a higher market value, and 3) make products > 20% more accurate with considerable savings (>30%) in consump-tion of waste metal, fluid ...
Read Project

 6

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 

Eddy CUrrent Brake Compatibility (ECUC)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

The ECUC (Eddy-Current Brake Compatibility) project's objective is to prove that linear eddy-current brake (ECB) is a very effective and applicable solution for increasing the braking capacity of new high speed trains and solving the concerns raised by infrastructure managers by proposing concrete and realistic solutions to overcome the drawbacks that ECB have experienced on some lines.This propos ...
Read Project

 9

 FINISHED 

Semantic Interoperability for Health Network (SemanticHealthNet)

Start date: Dec 1, 2011, End date: May 31, 2015,

SemanticHealthNet will develop a scalable and sustainable pan-European organisational and governance process for the semantic interoperability of clinical and biomedical knowledge, to help ensure that EHR systems are optimised for patient care, public health and clinical research across healthcare systems and institutions.Through a clinically-driven workplan, exemplified in cardiovascular medicine ...
Read Project

 18

 FINISHED 
EFACTS (the European Friedreich’s Ataxia Consortium for Translational Studies) assembles a body of expertise to adopt a translational research strategy for the rare autosomal recessive neurological disease, Friedreich’s ataxia (FRDA). FRDA is a severely debilitating disease that leads to loss of the ability to walk and dependency for all activities. Some patients have cardiomyopathy that can cause ...
Read Project

 15

 FINISHED 
While nanotechnology was originally limited to small areas of a few cm2, the quest for lower costs has been the latest years the drive for developing processes utilising larger substrate sizes at increasing throughputs. A typical example is the flat panel display industry where the push to larger gen size and faster processing has resulted in a significant cost reduction. The next challenge here i ...
Read Project

 18

 FINISHED 
MASELTOV recognises the major risks for social exclusion of immigrants from the European information society and identifies the huge potential of mobile services for promoting integration and cultural diversity in Europe. Mobile – everywhere/everytime - persuasive assistance is crucial for more efficient and sustainable support of immigrants. MASELTOV researches and develops novel ICT instruments ...
Read Project

 17

 FINISHED 
In all industrial sectors, Non Destructive Evaluation techniques play a critical role for ensuring structures reliability, plant safety and increasingly also for ensuring quality and efficiency of products and processes. The emerging use of numerical simulation is a major trend in the field with tremendous potential benefits in terms of costs reduction, enhanced diagnosis reliability and consequen ...
Read Project

 20

 FINISHED 

Highly-complex and networked control systems (HYCON2)

Start date: Sep 1, 2010, End date: Nov 30, 2014,

ICT developments both enable and also enforce large-scale, highly-connected systems in society and industry. Knowledge to cope with these emerging systems is lacking. HYCON2 will stimulate and establish the long-term integration of the European research community, leading institutions and industry in the strategic field of control of complex, large-scale, and networked dynamical systems. It will i ...
Read Project

 30

 FINISHED 
The overall objective of ADVANCE is the development of a unified tool-based framework for automated formal verification and simulation-based validation of cyber-physical systems. Unification will be achieved throughthe use of a common formal modelling language supported by methods and tools for simulation and formal verification. An integrated tool environment will provide support for construction ...
Read Project

 7

 FINISHED 
In 2008 a WHO report on microbial safety in fresh produce prioritised leafy green vegetables as the highest priority in terms of fresh produce safety from a global perspective. It is critical that effective decontamination steps are in place to ensure consumer protection and confidence in fresh produce. There is thus a requirement to ensure microbiological safety during production of minimally pro ...
Read Project

 11

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43