Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 
The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Read Project

 73

 FINISHED 
There is a huge industrial and innovative need for more efficient and reliable damage inspection as well as for reducing the time and cost for aircraft infrastructure maintenance and especially C and D Checks without compromising the safety of passengers and goods transported. This reduction would increase the value for money for the European aerospace industries. Moreover, airline companies will ...
Read Project

 11

 FINISHED 
The main goal of this project is to establish a long-lasting collaboration and create a network of the research centres of excellence from Europe and Third Countries aiming at development of the Fullerene-based systems for oxidative inactivation of airborne microbial pathogens.This goal will be achieved by undertaken of joint research activities via collaboration of a multidisciplinary consortium ...
Read Project

 4

 FINISHED 
Adhesion of Microorganisms on hulls, Algae to the coated surface, is the precursor of later fixation of macro-organisms, which causes serious hydrodynamic problems.Research and innovative developments of environmental friend surface protection is the main goal of the present project. The basic idea concerns the modification of usual hulls by providing a new antifouling coating, by fixing covalentl ...
Read Project

 10

 FINISHED 

Demonstration of the WindFloat Technology (DEMOWFLOAT)

Start date: Jul 15, 2011, End date: Jul 14, 2014,

Consistent with industrial initiative of the SET Plan this project addresses the objective of a grid-connected multi-megawatt fully integrated offshore wind turbine hosted on a floating support structure. The Proposed Project is in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation ...
Read Project

 12

 FINISHED 
"The overall objective of ECO-REFITEC project is to IMPROVE THE COMPETITIVENES OF THE EUROPEAN SHIPYARDS AND SME’S INVOLVED IN SHIPBUILDING, SHIPREPAIR & RECYCLING.The project will help repair shipyards and ship operator to perform a refitting of existing fleet, through of technological development and new tools, helping shipping benchmark their performance, improving the retrofit processes and pr ...
Read Project

 13

 FINISHED 
"As pointed out in the White paper for European transport the aim of the European rail operators is to increase the market share of goods traffic from 8 % in 2001 to 15 % in 2020. The nightly time slots will play an important in this. Railway vibration annoyance and sleep disturbance in residential areas is a potential show stopper for this increase.Therefore the aim of Cargovibes is to develop a ...
Read Project

 11

 FINISHED 

Sustainable Peace Building (SPBuild)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

SPBuild is created and developed by a solid and dynamic network of 11 institutions (EDEN Network for Peace and Conflict) with a proven commitment and capacity to deliver high-quality training in the rapidly developing field of Peace and Conflict research. These universities have undertaken joint research, published, and jointly created a European Doctoral Enhancement Programme on Peace and Conflic ...
Read Project

 11

 FINISHED 

Fatigue Test (FatigueTest)

Start date: Mar 1, 2011, End date: Dec 31, 2013,

In reply to the call released by the CleanSky team, named “Fatigue test of sensor integrated CFRP aircraft panels with stiffeners – JTI-CS-2009-2-GRA-01-025”, a consortium has been assembled to perform this project.This consortium encompasses Optimal Structural Solutions Lda (www.optimal.pt) and ISQ – Instituto de Soldadura e Qualidade (www.isq.pt). Acting as as sub-contractor, and to guarantee th ...
Read Project

 2

 FINISHED 
"The basic concept of the present work is the definition of an effective repair method for large steel structures with defects. Two basic steel structural types will be dealt with in this work, namely marine structures and steel civil engineering structures. The objective of this project is to demonstrate that composite patch repairs can be environmentally stable and therefore, that they can be us ...
Read Project

 15

 FINISHED 
"The primary objective of the RISPECT project is to use ship structural inspection results (coating condition, corrosion, cracks and deformation) along with the calculated expected results to guide future inspections required to achieve a minimum structural reliability.This “probabilistic inspection planning” is not new but this project takes the method a stage further to use data from large numbe ...
Read Project

 11

 FINISHED 
"The European rail industry is showing signs of steady recovery after a long period of decline. The technological advances in train design have led to the manufacturing of faster, greener and more comfortable trains making rail transport a more attractive option for passengers in comparison with other means of transportation. The ever growing need for the society to employ more environmentally fri ...
Read Project

 13

 FINISHED 

Probabilistic Framework for Onboard Fire-Safety (FIREPROOF)

Start date: Jun 1, 2009, End date: Oct 31, 2012,

"The traditional fire safety regulations that apply to ship design have been widely described as inadequate in two ways. Firstly they do impose unnecessary and inapplicable constraints on novel designs. Secondly novel designs can have features that do not satisfy the premise of existing rules, thereby setting them free from fire safety rules by default, often leading to unsafe designs. In or ...
Read Project

 13

 FINISHED 
"Greener and more comfortable trains making rail transport a more attractive option for passengers in comparison to other means of transportation. The ever growing need for the society to employ more environmentally friendly transportation policies is expected to further underline the economic and societal role of rail transport in achieving sustainable mobility across Europe in the years to follo ...
Read Project

 10

 FINISHED 
"Corrosion damages and fatigue cracks are the main causes for structural failures of all surface transport products like ships, road tankers and railway tank cars. Examples are catastrophic ship accidents with a tremendous pollution of the maritime environment or fatal explosions during the use of transport vehicles. Although evolving defects have to be identified in time to enable appropriate rep ...
Read Project

 11

 FINISHED 
Wind energy is the most developed of a number of renewable energy technologies, with several thousands of wind turbines already operating or being planned for construction across Europe. Wind turbines can be deployed individually to power a single site or installation, but are most commonly grouped together as wind farms to provide power to the electricity grid. The energy output from wind turbine ...
Read Project

 15

 FINISHED 

SCAlable & ReconfigurabLe Electronics plaTforms and Tools (SCARLETT)

Start date: May 1, 2008, End date: Apr 30, 2012,

"The first generation of Integrated Modular Avionics (IMA1G) has been researched via European funded research projects; PAMELA, NEVADA and VICTORIA. This technology supported a revolutionary step away from federated architectures and their classical bespoke electronics to a modular architecture with common resources. IMA1G was introduced to the market on the A380, A400M and B787 aircraft. IMA1G re ...
Read Project

 39

 FINISHED 
"The contribution of the rail industry to the economic growth of the EU member states is widely acknowledged. Very recently, the European rail industry has started showing signs of recovery after a long period of steady decline. The technological advances in train design during the last few decades have led to the manufacturing of faster and more comfortable trains making rail transport a more att ...
Read Project

 11

 FINISHED 

SURTEC

Start date: Dec 31, 2002, End date: Jan 31, 2005,

O objectivo do projecto SURTEC é o de actuar no âmbito das interacções dos sistemas regionais de inovação e, deste modo, facilitar a absorção dos resultados de investigação no tecido socioeconómico local. Uma atenção especial será dado às Pequenas e Médias Empresas (PMES) a fim que possam registar um rápido crescimento económico.
Read Project

 7

 FINISHED 
El Proyecto GESTINN se plantea como una aportación de instituciones localizadas en regiones SUDOE al impulso de la innovación en las pequeñas y medianas empresas, a través de la introducción de procedimientos organizativos y sistemáticos en la propia actividad de innovación de las empresas; lo que se conoce como “gestión de la innovación”. Se trata de facilitar la innovación en la empresa, poniend ...
Read Project

 12