Search for European Projects

27 European Projects Found

Searched on 125080 European Projects

 FINISHED 
RDEB is one of the most severe rare genetic skin diseases of children and adults characterized by skin blistering resulting from lack of expression of type VII collagen. There is no treatment for this life-threatening disease. In March 2009, we obtained the orphan drug designation for the Medicinal product: “Skin equivalent graft genetically corrected with a COL7A1-encoding SIN retroviral vecto ...
Read Project

 10

 FINISHED 
Main objective of the project is the demonstration and validation of an eco-innovative design of asphalt pavements based on the integration of more sustainable materials into its production cycle. This goal will be achieved by working on two asphalt mixtures’ main components, binders and aggregates. On the binder side, the aim is to replace almost the 100% of the bitumen by greener materials from ...
Read Project

 11

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 

HypErspectraL Imaging Cancer Detection (HELiCoiD)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

Starting with some specific types of cancers, this project will try to generalize the methodology to discriminate between healthy and malignant tissues in real-time during surgical procedures. Using the hyperspectral signatures of the healthy tissues and the same tissues affected by cancer, a mathematical model of how cancer affects to the hyperspectral signature will be derived. The research will ...
Read Project

 10

 FINISHED 

Kielikurssi ja opetusjakso ulkomaisessa aikuiskoulutusorganisaatiossa

Start date: Jul 1, 2014, End date: Jun 30, 2016,

In the incoming years a lot of reforms will be taking place in the Finnish upper secondary schools, therefore also Savonlinna upper secondary school for adults wants to develop its teaching practices and its employees’ competence to meet with the challenges of today’s society better. An oral part will be included in the new matriculation examination for languages and also the new curriculum will e ...
Read Project

 2

 FINISHED 
...vement plan. • Selected activities for the plan • Participants’ profile • Benefit to be obtained from the activities. The project presented by the Escuela Oficial de Idiomas de Madrid-Jesús Maestro is based on an analysis of the context in which its educational activities are carried out. The EOI Madrid-Jesús Maestro is a public institution of adult education where 22 languages are taught from ...
Read Project

 1

 FINISHED 

Improving therapy and intervention through imaging (TAHITI)

Start date: Apr 16, 2012, End date: Apr 15, 2016,

"The scientific objective of the programme is to design, develop, and validate new imaging technologies to improve the performance and safety of therapeutic and interventional procedures. Improving therapy and surgery planning will be approached using multimodal imaging strategies, lesion and dysfunctional tissue characterization, efficient segmentation and image fusion techniques. Image guided t ...
Read Project

 4

 FINISHED 

Detailed Anatomy of Galaxies (DAGAL)

Start date: Apr 1, 2012, End date: Mar 31, 2016,

We propose an ambitious network based on a combination of training through high-level astrophysical research and a comprehensive package of complimentary skills training. Our network exploits a unique data set: a combination of very deep mid-infrared imaging of over 2300 local galaxies which we are obtaining with the Spitzer Space Telescope, with ground- and space-based UV, optical, and radio data ...
Read Project

 6

 FINISHED 
This project addresses the design and development of permanent magnets without rare earths but consisting on hybrid nanostructures based on metals and metal ferrite oxides. The metallic nanostructures offers high magnetization values while the ferrite oxide one provides high anisotropy. We intend to design and process novel permanent magnets based on traditional hard ferrites and additional new m ...
Read Project

 12

 FINISHED 
As we move inextricably into a digital economy there is a looming crisis for a growing number of increasingly marginalized individuals. The accessibility technologies we have are meeting the needs of only some, at high cost, and will not work with many new technologies. The path and pace of technological change predestines these approaches to fail in the very near future. At the same time the inci ...
Read Project

 30

 FINISHED 
CloudCatalyst aims to provide useful tools to foster the adoption of Cloud Computing in Europe. CloudCatalyst will set up a cross-border advice and support service targeting two main groups:1) Software developers, researchers, start-ups, and other Cloud entrepreneurs interested in accelerating the development and deployment of Cloud Computing and internet services,2) End-users from large industrie ...
Read Project

 5

 FINISHED 
Policy dialogue in science, technology and innovation has become an important vehicle for Latin America participation in EU-FP7 and ICT is currently in the bilateral and bi-regional political agendas. To ensure continuity and enhance collaborative ICT research and innovation (R&I) in Horizon 2020, LEADERSHIP will support the evolving dialogues on EU-LAC cooperation in ICT, by providing input, both ...
Read Project

 11

 FINISHED 
The main objective of project e-GOTHAM is to implement a new aggregated energy demand model (based on the microgrid concept) in order to effectively integrate renewable energies sources, increase management efficiency by dynamically matching demand and supply, reduce carbon emissions by giving priority to green energy sources, raise energy consumption awareness by monitoring products and services ...
Read Project

 18

 FINISHED 

Test of Digital Services for Buildings Energy Efficiency (TEDS4BEE)

Start date: Feb 1, 2013, End date: Jul 31, 2015,

TEDS4BEE aims to run the Digital Service in the 16 buildings located in 5 countries. The Digital Service is EMMOS (Energy Management and Monitoring Operational System), that makes possible to collect, storage and analyse consumption data and other parameters that influences the energy consumption.The buildings where EMMOS will be implemented are:• Italy: University of Salento canteen in Lecce• Pol ...
Read Project

 11

 FINISHED 

Movilidad Personal EOI de Madrid-Jesús Maestro

Start date: Jul 1, 2014, End date: Jun 30, 2015,

The project presented by the Escuela Oficial de Idiomas de Madrid-Jesús Maestro is based on an analysis of the context in which its educational activities are carried out. The EOI Madrid-Jesús Maestro is a public institution of adult education and youth over 16 years teaching 22 languages from A1 to C1 of the CEFR levels. Students who attend courses are mainly university students, working professi ...
Read Project

 1

 FINISHED 

GLObal Robotic telescopes Intelligent Array for e-Science (GLORIA)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

GLORIA is an innovative citizen-science network of robotic telescopes, which will give free access and research to a virtual community via the Internet. The GLORIA partners will offer access to a growing collection of robotic telescopes via a Web 2.0 environment - 17 telescopes on 4 continents by the project's end.\nThe GLORIA partners can do this because most of the telescopes are already robotiz ...
Read Project

 14

 FINISHED 
"Concern about the growth of space debris, aggravated by the increase in the number of countries with direct access to space, made the SPA.2010.2.3-02 Call Topic suggest ""preventing generation of new debris and de-orbiting upper stages and spacecraft after mission completion"". The Project proposed involves Research and Technology Development of an efficient deorbit system, to be carried in the ...
Read Project

 7

 FINISHED 

European Clearing House for Open Robotics Development (ECHORD)

Start date: Jan 1, 2009, End date: Dec 31, 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Read Project

 105

 FINISHED 
Thanks to the developments in Medical Imaging Diagnosis is earlier than ever. Physicians have more information and insight. Care is less invasive and less painful for patients. Access to tests and treatments is easier as imaging procedures are available in convenient settings, such as independent imaging centers. In addition, patient outcomes— from fewer complications to saved lives—are dramatical ...
Read Project

 23

 FINISHED 
"The development of innovative 'Advanced Therapies' offers new approaches to tackle major diseases such as cancer, diabetes, Alzheimer or Parkinson. The progress made in the fields of 'Tissue Engineering' and 'Regenerative Medicine' (TERM) promises to deliver long awaited new solutions. They are recognized as potential sources for medical progress and significant economic growth where Europe shoul ...
Read Project

 16

 FINISHED 
DORIS_Net proposes a Downstream Observatory organised by Regions who are all members of NEREUS (Network of European Regions Using Space Technologies) and potentially users of GMES downstream services. The Downstream Observatory will facilitate links between both regional and European level GMES stakeholders. The regional users and service providers will be supported by dedicated interfaces as well ...
Read Project

 14

 FINISHED 

MULTI-SCALE COMPLEX FLUID FLOWS and INTERFACIAL PHENOMENA (MULTIFLOW)

Start date: Jan 1, 2009, End date: Dec 31, 2012,

"Understanding and controlling of interfacial phenomena in multiphase fluid dynamics remains one of the main challenges at the crossroad of Mathematics, Physics, Chemistry and Engineering. Examples include film flows, spreading and dewetting of (complex) liquids including suspensions, polymer solutions, liquid crystals, colloids and biofluids. Such systems are central for technological advances in ...
Read Project

 10

 FINISHED 
"This proposal offers to combine X-ray CT (XCT) and Fluorescence Molecular Tomography (FMT) into a hybrid, quantitative system and method. The project builds on state-of the-art knowledge that only recently became available in different European states as represented by the partners herein. In return it delivers the first such hybrid system worldwide. The system will operate by 1) co-registering ...
Read Project

 8

 FINISHED 

Researchers´ Night in Madrid 2010 (MADRIDRN)

Start date: May 1, 2010, End date: Nov 30, 2010,

The Researchers´ Night in Madrid 2010 is a project to be held in different locations in the Region of Madrid in the framework of the European Researchers´ Night, which involves the main Universities and Research Centres in the Region. It aims at bringing researchers closer to the public and at enhancing the public recognition of scientists, by presenting to the public relevant aspects of their wor ...
Read Project

 11

 FINISHED 
CoopAIR is an ambitious and innovative action supporting Latin American (LA) cooperation. It aims at deepening strategic RTD cooperation between Europe and LA by building, starting from what already exist a multinational and multistakeholder community that will involve a significant representation of the relevant RTD European and LA actors (researchers, companies, policy makers, users) and by iden ...
Read Project

 9

 FINISHED 
Over the last decades, minimally invasive surgery (MIS) has been proved to be a safer and less traumatic approach for patients. The rapid evolution of MIS technologies and procedures raises new demands for initial and lifelong surgical training. The skills involved in MIS require a demanding training period for surgeons, which must be accommodated to the limited time and resources available. Old m ...
Read Project

 5

 FINISHED 
The main objective of KTS project is to design, to develop and to validate a serious game and the supporting material in order to provide medical students and (novel) surgeons with an innovative ICT-based approach for training basic key psychomotor skills in minimally invasive surgery (MIS). The KTS serious game will be based on existing training tasks accomplished in a training box (denominated “ ...
Read Project

 6