Search for European Projects

18 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Virtualisation of the testing environment (VITE)

Start date: Nov 1, 2016, End date: Oct 31, 2018,

The VITE proposal is addressed to the call S2R-OC-IP2-02-2015-IT virtualization of testing environment. The main objective of VITE proposal is to reduce on-site tests for signalling systems leading to reducing overall testing costs. To achieve this main objective the work is organized in two main streams:First, to propose a testing framework by carefully analysing user’s needs and current situatio ...
Read Project

 11

 FINISHED 
Background Air pollution linked to the road transport sector is still one of the main environmental problems in European cities. The negative impact on human health has been widely demonstrated, and the improvement of air quality in highly populated areas is a policy priority. The EU Directive 2008/30/CE defines European air quality standards and seeks to ...
Read Project

 4

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 

Satellite Technology for Advanced Railway Signalling (STARS)

Start date: Feb 1, 2016, End date: Jan 31, 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Read Project

 18

 FINISHED 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Read Project

 48

 FINISHED 

Building EGNSS capacitY On EU Neighbouring multimodal Domains. (BEYOND)

Start date: Apr 1, 2015, End date: Mar 31, 2017,

The overall project concept consists of building capacity in the field of multi-modal applications, focussed mainly on aviation using EGNSS in different Eastern European and Mediterranean countries. These countries are located at boundaries of the EGNOS SOL coverage area with limited EGNSS experience; the projects will promote the development of multi-modal applications, building on the lessons le ...
Read Project

 19

 FINISHED 

Next Generation Train Control (NGTC)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Read Project

 21

 FINISHED 
INTERACTION proposes an evolution in airport operations towards a fully integrated and coordinated management of all the processes-passenger, baggage, freight and ramp operations-which are converging into the aircraft turnaround. The main needs are 3: increase time efficiency in each one of the airport processes and the turnaround itself in a coordinated way; reduce the environmental impact of the ...
Read Project

 14

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 

Standards Based Approach to Video Archive Search and Analysis (SAVASA)

Start date: Dec 1, 2011, End date: May 31, 2014,

The SAVASA project proposes the creation of a video archive search platform that allows authorised users to perform semantic queries over different, remote and non-interoperable video archives this project will exploit the current trends in computer vision, video retrieval and semantic video analysis. It is also a goal of the project to ensure that its results are capable of deployment in distribu ...
Read Project

 12

 FINISHED 

The 2050+ Airport (2050AP)

Start date: Sep 1, 2011, End date: Feb 28, 2014,

"This project will explore new airport concepts with radical and novel solutions to prepare airports for 2050 and beyond. It will build on the High Level Target Concepts (HLTC) from the Advisory Council for Aeronautics Research in Europe (ACARE) Strategic Research Agenda (SRA) 2. The SRA-2 underlines the importance of the air transport sector with respect to value added, Gross Domestic Product, jo ...
Read Project

 8

 FINISHED 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Read Project

 23

 FINISHED 

Turnaround Integration in Trajectory and Network (TITAN)

Start date: Dec 1, 2009, End date: Feb 28, 2013,

"The TITAN project will analyse the current Turnaround process to detect gaps and to study the influence of external actors, specially the effect of land-side process like passenger flow or baggage handling. A concept shall be defined for this improved process, which will be modeled and validated using the most appropriate platform. Using the validated concept, a decision-making support tool for t ...
Read Project

 11

 FINISHED 
"The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. AEROTRAIN will help meet the business sce ...
Read Project

 18

 FINISHED 
"The current interoperability approval process for new High Speed and Conventional railway vehicles in Europe is a very long and costly process. The Technical Specifications for Interoperability provide common regulations for the homologation of new rolling stock but do not directly eliminate the current burdens regarding new vehicle approval on each network. In this context, the pantograph/catena ...
Read Project

 16

 FINISHED 

INtegrated European Signalling System (INESS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Read Project

 31

 FINISHED 

Integrated Airport Apron Safety Fleet Management (AAS)

Start date: May 1, 2008, End date: Apr 30, 2011,

One of the main challenges in the apron area is that due to many different companies operating on an airport apron, each company brings in the vehicles and equipment it requires to sustain operation. This causes high levels of congestion in ramp areas, which increases the accident rate and the chances of vehicles and equipment being misused. By gaining telematic data on the running times of the va ...
Read Project

 14

 FINISHED 
"To develop adequate and well accepted security for mass transportation in Europe and the citizens affected by it, is a formidable task. The malicious threats, particularly those posed by terrorists, require a comprehensive approach: if security improvements are patchy, perpetrators are likely to find the loopholes left. With their open access points and interconnections, surface mass transportati ...
Read Project

 13