Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 

High-Resolution Solar Physics Network (SOLARNET)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

This project aims at integrating the major European infrastructures in the field of high-resolution solar physics. The following actions will be taken: (i) realise Trans-national Access to external European users; (ii) enhance and spread data acquisition and processing expertise to the Europe-wide community; (iii) increase the impact of high-resolution data by offering science-ready data and facil ...
Read Project

 32

 FINISHED 

Next Generation Train Control (NGTC)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Read Project

 21

 FINISHED 

Compound Semiconductors for 3D integration (COMPOSE3)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

COMPOSE3 aims to develop 3D stacked circuits in the front end of line of Complementary Metal Oxide Semiconductor (CMOS) technology, based on high mobility channel materials. The final objective is a 3D stacked SRAM cell, designed with gates length taken from the 14nm technology node. This technology will provide a new paradigm shift in density scaling combined with a dramatic increase in the power ...
Read Project

 10

 FINISHED 
Description In order to make robots achieve robust, adaptive, effective and natural performance of everyday manipulation tasks, it is not feasible to expect that programmers can equip the robots with plan libraries that cover such open-ended task spectrum competently. ROBOHOW.Cog targets at enabling autonomous robots to perform expanding set ...
Read Project

 9

 FINISHED 
The SMARTBLIND project aims at developing an Energy Efficient Smart Window including a hybrid film constituted of an electrochromic LC film and a photovoltaic film both printed on the same long-lasting flexible substrate. The realization process will be implemented thanks to electrochromic and photovoltaic inks especially formulated to be ink-jet printed.A reduction of the windows U-value down to ...
Read Project

 13

 FINISHED 

PhotoVoltaic European Research Infrastructure (SOPHIA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

The objective of the SOPHIA project is to strenghten and optimise research capabilities, mainly by coordinating efforts on important but precompetitive issues. Large research infrastructures working together will avoid the useless replication of a large number of small efforts. The SOPHIA project aims at pulling together the main European photovoltaic research infrastructures in order to provide t ...
Read Project

 22

 FINISHED 

Long-term performance of Engineered Barrier Systems (EBS) (PEBS)

Start date: Mar 1, 2010, End date: Feb 28, 2014,

The main aim of the project PEBS (Long-term Performance of the Engineered Barrier System) is to evaluate the sealing and barrier performance of the EBS with time, through development of a comprehensive approach involving experiments, model development and consideration of the potential impacts on long-term safety functions. The experiments and models cover the full range of conditions from initial ...
Read Project

 18

 FINISHED 
GROUND-MED project will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration sites of South Europe. As the SPF is determined not only by the heat pump unit, but by its operating conditions imposed to the heat pump by the ground heat exchanger and the heating/cooling system of the building as well, integrated systems incorporating the follow ...
Read Project

 24

 FINISHED 

Dissemination and uptake of FP water research results (WaterDiss2.0)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

The implementation of the Water Framework Directive is not a “Business-as-usual approach”, and needs new knowledge and know-how, but it is demonstrated that the actual connection between research and policy is not efficient.The concept of the project is to add an intermediate step after research, like a marketing team in the industry.This “step-further” will be developed closely with the stakehold ...
Read Project

 8

 FINISHED 
SUCCESS targets to develop a technology platform and best-practice design methods to enable the breakthrough of silicon mm-Wave SoCs for high-volume applications. Silicon technology (CMOS, SiGe) has made tremendous progress towards ever higher device cut-off frequencies. Nowadays all RF components for mm-Wave sensing applications up to 120 GHz can be realized in silicon. Silicon technology hence ...
Read Project

 9

 FINISHED 

COmpact MOdelling Network (COMON) (COMON)

Start date: Dec 1, 2008, End date: Nov 30, 2012,

"The goal of our Network is to address the full development chain of Compact Modeling (CM) of advanced CMOS and III-V technologies, from the technology level to the system level. Our mission is driven by the need to enhance scientific knowledge, transfer scientific and technological knowledge from academia to industry, to strengthen the European integrated circuit (IC) industry with powerful desi ...
Read Project

 16

 FINISHED 

Femtosecond Lasers for the generation of Ultrafast XUV pulses (FLUX)

Start date: Nov 1, 2008, End date: Oct 31, 2012,

"We propose a IAPP project bringing together three Academic teams that are involved in the development and application of attosecond techniques, and two Industrial partners that produce high intensity femtosecond laser equipment and diagnostics instrumentation. This project will lead to the realization of unique femtosecond amplifier systems and the development of new attosecond XUV and single/fe ...
Read Project

 5

 FINISHED 

Guardian Angels for a Smarter Life (Guardian Angels)

Start date: May 1, 2011, End date: Apr 30, 2012,

Guardian Angels (GA) are future zero-power, intelligent, autonomous systems-of-systems featuring sensing, computation, and communication beyond human aptitudes. GA will assist humans from their infancy to old age in complex life situations and environments. Zero-power reflects system-of-systems ability to scavenge energy in dynamic environments by disruptive harvesting techniques. The project prep ...
Read Project

 34

 FINISHED 

Superior Energy and Power Density Li-Ion Microbatteries (SUPERLION)

Start date: Sep 1, 2008, End date: Aug 31, 2011,

"On-board microbattery power is fast becoming essential in many of today’s emerging technologies. Down-scaling in the micro-electronic industry has far outpaced advances in small-scale electrical power supplies. The absence of on-board power is a hinder to advances in many critical areas: micro-electronic devices and biomedical micro-machines. However, nano-materials and -structures provide new re ...
Read Project

 9