Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Billions of years of evolution have made enzymes superb catalysts capable of accelerating reactions by several orders of magnitude. The underlying physical principles of their extraordinary catalytic power still remains highly debated, which makes the alteration of natural enzyme activities towards synthetically useful targets a tremendous challenge for modern chemical biology. The routine design ...
Read Project

 1

 FINISHED 
Background The Montseny brook newt (Calotriton arnoldi) is an endemic amphibian present only in the Montseny area and classified as “critically endangered” in the IUCN Red List. The population of this amphibian is estimated to be fewer than 1 500 adults. Moreover, its distribution area is small and fragmented, covering less than 8 km2. The newt specie ...
Read Project

 5

 FINISHED 

Erasmus Mundus Joint Master in Medical Imaging and Applications

Start date: Sep 1, 2015, End date: Aug 31, 2020,

...h the aim of achieving a more efficient diagnosis and treatment.Course durationTwo years (120 ECTS credits).Brief descriptionThe MAIA is a 2-years joint master degree coordinated by the University of Girona (UdG, Spain), offered together with the University of Bourgogne (uB, France) and the Università degli studi di Cassino e del Lazio Meridionale (UNICLAM, Italy) as partners; and with the Univers ...
Read Project

 3

 FINISHED 

REgenerative Stem cell therapy for STroke in Europe (RESSTORE)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

Stroke is the second leading cause of death in the world population. When not fatal, stroke often results in disability, due to motor and cognitive impairments, and secondary health problems affecting not only patients but also their families. Building on emerging preclinical and pilot clinical evidences, RESSTORE will focus on the clinical assessment of regenerative cell therapy to improve stroke ...
Read Project

 29

 FINISHED 
INNOQUA will accelerate the path to market of a modular set of innovative, patent protected, award winning and scalable fully ecological sanitation solutions that address wide market needs in rural communities, for agricultural industries, for sustainable home-builders or collective housing owners and for developing countries worldwide. The modular system is based on the purification capacity of b ...
Read Project

 20

 FINISHED 

Non-Noble Metal Catalysis - NoNoMeCat (NoNoMeCat)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Transition metal catalysts are formidable tools towards greener chemistry, allowing for low-waste, energy-efficient, and selective reactions. However, the noble metals (Ru, Os, Rh, Ir, Pd, Pt) that are currently most common in homogeneous catalysts suffer from high toxicity and environmental impact in addition to their scarcity and ensuing high cost. First-row metals (Mn, Fe, Co, Ni, Cu) are emerg ...
Read Project

 9

 FINISHED 
The Wider objective of CONSEA is to ensure Biodiversity Conservation & Environmental sustainability around the Mekong River Basin. CONSEA consortium aims to develop a strong education program on biodiversity conservation in SEA. In spite of socio-economic difficulties of Cambodia and Vietnam, these countries are located in biodiversity hotspots. These territories endowed of added value are under c ...
Read Project

 8

 FINISHED 

EUROPEAN MASTER IN TOURISM MANAGEMENT

Start date: Sep 1, 2015, End date: Aug 31, 2019,

...learn about policy instruments and management tools available for tourism policy and strategy design, with emphasis on environmental issues in tourism development. Spending the subsequent semester in Girona, Spain, students become competent in effectively implementing tourism with particular emphasis on the effective management of organizational networks, consumers, innovation processes and new to ...
Read Project

 3

 FINISHED 
...isations and disadvantaged learners and will ensure that these voices will be heard in the development and design of the RPL Mentor Facilitator programme. The Universities of Thessaloníki, Bacau and Girona will provide significant pedagogic weight to the design and development of the RPL Mentor Facilitator as well as their connections with the local and national labour market, communities and disa ...
Read Project

 5

 FINISHED 
Measurement campaigns have shown major discrepancies in buildings energy performance between planned energy demand and real energy consumption, while nowadays most of the newly constructed offices buildings are equipped with BMS systems, integrating a more or less extended measurement layer providing large amounts of data. Their integration in the building management sector offers an improvement c ...
Read Project

 23

 FINISHED 
This proposal is for a personalised decision support system for chronic disease management that will make predictions based on real-time data in order to empower individuals to participate in the self-management of their disease. The design will involve users at every stage to ensure that the system meets patient needs and raises clinical outcomes by preventing adverse episodes and improving lifes ...
Read Project

 7

 FINISHED 

Excelling LABUST in marine robotics (EXCELLABUST)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Laboratory for Underwater Systems and Technologies (LABUST) at the University of Zagreb Faculty of Electrical and Engineering (UNIZG-FER) in Croatia positioned itself in the last years as the regional leader in marine robotics: LABUST has the required technologies, people, infrastructure, and experience in field experiments. What LABUST is missing is research excellence that will allow it to fully ...
Read Project

 4

 FINISHED 
...o face future challenges and implement wastewater-related directives in practice. TreatRec, with the participationof two academic partners (ICRA-Catalan Institute for Water Research and University of Girona) and two non-academic (ATKINS and AQUAFIN) identifies several pertinent technological gaps and knowledge needs around which we have built a research programme. TreatRec involves equally academi ...
Read Project

 4

 FINISHED 

STRengthening MARritime Technology Research Center (STRONGMAR)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

INEST TEC is strongly committed to become a center of excellence in maritime technology and, in particular, deep sea technology. It is strategically located, with fast access to deep sea, it has been steadily building up its skills, capabilities and resources, and is presently in the process of implementing an open research infrastructure, thus preparing itself to become capable of providing servi ...
Read Project

 6

 FINISHED 
The project aims at modernization of Higher education methodologies with cooperation of EU experiences, by establishing well equipped center, which engage technology with teaching process and it will be used to train Professors, Lecturers, Trainers whom already exist in Partner countries and Trainees in best practices of ICT in education. The project aims to ensure that universities in Jordan and ...
Read Project

 15

 FINISHED 
The UNICAM project has been designed to enhance overall human health and ecosystem security posture of Cambodia (ME) by accelerating the availability of educational and training resources designed to improve the behavior, skills, and knowledge of every segment of the population. The main project objective is to enhance education quality and develop human resources through implementing comprehensiv ...
Read Project

 8

 FINISHED 
Recent studies at European level, show significant differences in the career and academic performance of children and youth in care in its various forms (residential care and foster care) compared to the general population. This happens paradoxically, despite the large investment in resources and professional involvement they gather.. Given the role of education in the social ascension, the failur ...
Read Project

 6

 FINISHED 

Education Material, Planning, Strategy and Tools for CLIL Education

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The project called "Education Material, Planning, Strategy and Tools for CLIL Education" was designed after the current analysis of needs at partners schools - which all have integrated language learning/teaching as a priority in its school strategy. The involved partners from Slovakia, Czech Republic, Lithuania, Spain and Turkey plan to implement interdisciplinary approaches towards traditional e ...
Read Project

 5

 FINISHED 

How to wIN the challenGE: internationalising EQF Level 5

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The general objectives of the project are to strengthen cooperation between the world of education and training and the world of work, to foster quality, innovation and internationalization of partner institutions and to establish transnational cooperation between education providers and regional/local authorities in charge of accreditation of training bodies, development of LLL and recognition o ...
Read Project

 10

 FINISHED 
...wicz University 5. Miejska Pracownia Urbanistyczna (Municipal Planning Office) (local public body) 6. Zakład Zagospodarowania Odpadów (Waste Management Company) (enterprise) SPAIN 7. University of Girona 8. Landscape Observatory (consortium, advisory body) 9. Girona Provincial Council (local public body) The main outputs of the project will be: a competence analysis of relevant and topical questio ...
Read Project

 9

 FINISHED 

Mind Safety- Safety Matters!

Start date: Sep 1, 2015, End date: Aug 31, 2018,

According to Eurostat (2009) Health problems related with working conditions affected 8,6% EU workers and 3,2% suffered an accident at work during the annual working time, (this means 7 million europeean workers). The continuous increase of young workers ( between 15 and 24 years ) in the world economy , raises special concerns in the safety and health. Younger workers are more likely to be vict ...
Read Project

 7

 FINISHED 

Pan Wales Vocational Learner Mobility 2016

Start date: Sep 1, 2016, End date: Aug 31, 2018,

Context/background of the projectCollegesWales is the national organisation that represents the 14 Further Education institutions in Wales. CollegesWales has employed a full time International Coordinator since November 2010 to engage the FE institutions in European funded projects. Initially, the job was funded for one year by the Welsh Government who specified that a key outcome was the submis ...
Read Project

 24

 FINISHED 
In order to train cooks and waiters able to work in famous restaurants with clients from all over the world, we wish to perpetuate the rewarding former placements within the establishments of our European partners.This is the reason why we would like to continue working in close collaboration with our old partners from the Catering Department of Gerona High School and Marina Restaurant Ltd, Malta ...
Read Project

 6

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
Background The Ter river reaches the Mediterranean sea in the municipality of Torroella de Montgrí. In the flood plain of the Ter estuary is a Natura 2000 network site centred on the La Pletera saltmarsh. The site is of high ecological importance due to the presence of brackish (salinity greater than freshwater but less than seawater) and hyperhaline (sa ...
Read Project

 4

 FINISHED 

THE SPUR - ETACEC 1618

Start date: Jun 1, 2016, End date: May 31, 2018,

The Spur is a project for the creation of a European cooperation network made up of seven cultural organisations that operate on a local and international scale as cultural operators, focusing above all on the field of the visual arts. It has two key objectives: A- To develop innovative projects for building the professional capacities and transnational mobility of creators, in particular visual a ...
Read Project

 7

 FINISHED 

Gdy mnie wspierasz , świat otwierasz.

Start date: Jun 1, 2016, End date: May 31, 2018,

Public Kindergarten No. 7 in Piła is a unit of the Municipality Piła. Kindergarten accordance with The Statute has organized four groups of 25 children. In ages between 3-6 years old (at latest to 8 years old - children deferred from compulsory school for various reasons, based on the opinion or judgment of Psychologists and Pedagogists). We are a team that can work together regardless of age and ...
Read Project

 7

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
"Biocatalysis is based on the application of natural catalysts for new purposes, for which the enzymes were not designed. Although the first examples of biocatalysis were reported more than a century ago, biocatalysis was revolutionized after the discovery of an in vitro version of Darwinian evolution called Directed Evolution (DE). Despite the recent advances in the field, major challenges remain ...
Read Project

 1

 FINISHED 
Through an innovative use of four key concepts (resilience, capability, active agency and negotiation) and primary data (life course interviews, vignette experiments), NEGOTIATE will deliver gender-sensitive comparative knowledge about consequences of early job insecurity. We move beyond the state-of-the-art by investigating the linkages across macro, meso and micro levels as mechanisms of early j ...
Read Project

 10

 FINISHED 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Read Project

 27

 FINISHED 

Copper Catalysis Applications (CatalApp)

Start date: Aug 1, 2016, End date: Jan 31, 2018,

An innovative methodology has been developed in the field of copper-catalyzed cross coupling catalysis, with the goal of developing more efficient and sustainable synthetic protocols used by Chemical and Pharmaceutical Industries.Successful research developed within the ERC-2011-StG-277801 project has led to discover new methodologies for sustainable catalytic transformations using copper catalyst ...
Read Project

 1

 FINISHED 

Natura 2000?: an opportunity for everyone (INFONATUR 2000)

Start date: Jan 1, 2013, End date: Dec 31, 2017,

Background The Natura 2000 network is still not widely known, and this lack of knowledge is one of the main negative factors affecting its maintenance. Neither the restrictions of the Natura 2000 network nor the opportunities and benefits for the rural population are well known by those directly affected – i.e. those who live in and use these sites and ...
Read Project

 4

 FINISHED 

European Academy for Marine and Underwater Robotics (ROBOCADEMY)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"The Robocademy ITN will establish a European training and research network to develop key skills and enabling technologies in underwater robotics for the scientific and economic exploration of the oceans(e.g. offshore oilfield of the future). Through the close collaboration of leading research institutes,academia, industry, and SMEs in robotics, marine technology, marine science, and offshore ind ...
Read Project

 10

 FINISHED 

PREservation FORMAts for culture information/e-archives (PREFORMA)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

Description Research Procurement for Digital PreservationMemory institutions are handling an increasing number of transfers of electronic documents and other media content for long term preservation. Preservation models are often inspired by ISO 14721:2003, known as “the OAIS model”, where transfers and preservation are built on informati ...
Read Project

 14

 FINISHED 
On the basis of recent PI’s findings, this project aims to take advantage of the Cu(I)/Cu(III) redox pair chemistry to perform a wide range of copper catalyzed organic transformations under very mild conditions, i.e. aryl-heteroatom cross coupling, aryl-halide exchange, aryl fluorination, and direct C-H functionalization reactions. The development of new sustainable methodologies alternative to Pd ...
Read Project

 1

 FINISHED 
WAKE-UP is an investigator-initiated, multicentre, randomised, double-blind, placebo-controlled trial designed to test efficacy and safety of MRI-based intravenous thrombolysis in patients with wake-up stroke. Every year 1.5 million patients suffer a stroke in the EU. Up to 20% of stroke patients wake up with stroke symptoms. Currently these patients are excluded from thrombolysis which is the onl ...
Read Project

 13

 FINISHED 
The ERC-funded project BIDECASEOX ERC-239910 has produced a series of chiral catalysts with broad applicability in various commercial fields associated with synthetic organic chemistry. These catalysts are based in earth abundant metals and activate hydrogen peroxide to perform asymmetric introduction of oxygen atoms into readily available and cheap non chiral organic molecules, producing highly v ...
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The growth of advanced composites in construction in recent years has been spectacular, doubling in size in the last 10 years. This expansion has been largely due to the use of Fibre Reinforced Polymer reinforcement in structural applications and, although the current economic climate has seen a slowdown of the general construction market, the demand of composite products within the European const ...
Read Project

 14