Search for European Projects

19 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
Support for development and integration of Cyber-Physical Systems is seen as essential for the future. As the embedded world meets the Internet world there will be an increasing number of interacting systems with strong connectivity utilised in both society and in industry. Platforms4CPS targets the transport, manufacturing, energy and health sectors. Europe is a world leader in the area of time-c ...
Read Project

 8

 FINISHED 
The here proposed DIMAP project focuses on the development of novel ink materials for 3D multi-material printing by PolyJet technology. We will advance the state-of-the art of AM through modifications of their fundamental material properties by mainly using nanoscale material enhanced inks. This widens the range of current available AM materials and implements functionalities in final objects. The ...
Read Project

 13

 FINISHED 

Futuring European Industry (FUTURING)

Start date: Sep 1, 2016, End date: Feb 28, 2018,

FUTURING aims at contributing to define the strategy for the re-industrialization of Europe, by focusing on the role of Research and Innovation within the framework of other dimensions – Economy, Society, Environment, Globalization, geopolitics– and incoming paradigms such as Circular Economy.It explores 2030 future scenarios, concerning EU Industry, through the use of foresight and other Policy I ...
Read Project

 12

 FINISHED 

2016: Fit for Future=Fit for Europe

Start date: Jun 1, 2016, End date: May 31, 2017,

About 9 apprentice in a dual apprenticeship will take part for respectively four weeks in the project "2016: Fit for Europe = Fit for Future" of Festo AG & Co. KG. They will composed of commercial and technical apprentice. The commercial apprentice includes the occupation industrial clerk. The technical apprentice includes the occupations industrial mechanics, mechatronic technicians, draftsmen, t ...
Read Project

 3

 FINISHED 
The RobustPlaNet project aims at developing an innovative technology-based business approach that will drastically change the current rigid supply chain mechanisms and the current product-based business models into collaborative and robust production networks able to timely deliver innovative product-services in very dynamic and unpredictable, global environments. This technology-based business ap ...
Read Project

 12

 FINISHED 

2015: Fit for Future=Fit for Europe

Start date: Jun 1, 2015, End date: May 31, 2016,

About 9 apprentice in a dual apprenticeship took part for respectively four weeks in the project "2014:Fit for Europe = Fit for Future" of Festo AG & Co. KG. They will composed of commercial and technical apprentice. For them the stay abroad is very important because Festo AG & Co. KG is a global company, so English is a very important language. English is the base and the requirement in mostly ev ...
Read Project

 3

 FINISHED 

2014: Fit for Future=Fit for Europe

Start date: Jul 1, 2014, End date: Jun 30, 2015,

About 10 apprentice in a dual apprenticeship will take part for respectively four weeks in the project "2014:Fit for Europe = Fit for Future" of Festo AG & Co. KG. They will composed of commercial and technical apprentice. The commercial apprentice includes the occupation industrial clerk. The technical apprentice includes the occupations industrial mechanics, mechatronic technicians, draftsmen, t ...
Read Project

 2

 FINISHED 
The objectives of the “Socially sustainable manufacturing for the Factories of the Future” –SO SMART are to:• Develop a socially sustainable ecosystem assessment framework, including guidelines to describe scenarios and a set of indicators needed in order to evaluate them, under the perspectives of economic and social sustainability.• Define and validate a future vision for socially sustainable Fo ...
Read Project

 6

 FINISHED 
The European industry in the 21st century is facing the major challenge of responding to the needs created by the profound society changes of the past decades. Simultaneously it must increase its global competitiveness while creating more sustainability, wealth and jobs in Europe. Whilst the European excellence in fundamental research is widely acknowledged, the clear mechanisms for transfer of k ...
Read Project

 9

 FINISHED 
CROPS will develop scientific know-how for a highly configurable, modular and clever carrier platform that includes modular parallel manipulators and “intelligent tools” (sensors, algorithms, sprayers, grippers) that can be easily installed onto the carrier and are capable of adapting to new tasks and conditions. Several technological demonstrators will be developed for high value crops like green ...
Read Project

 14

 FINISHED 
According to the International Energy Agency, the Manufacturing sector is at worldwide level responsible for approximately 37% of primary energy consumption being, in most of the developed countries, it is the largest energy consumer and CO2 producer. In this new competitive scenario, European manufacturers have to rethink the current ideas of manufacturing and factories, to be prepared for the n ...
Read Project

 19

 FINISHED 
The European automotive industry and their component manufacturers are facing the biggest shift in their history. The transition from combustion engines to electric drives (e-vehicle) requires pro-duction facilities that can initially deal with low and varying production volumes and can quickly be up-scaled to large numbers at need. LOCOBOT provides a solution to this problem by developing a flexi ...
Read Project

 10

 FINISHED 

Instantly Deployable Evolvable Assembly Systems (IDEAS)

Start date: Apr 1, 2010, End date: Jun 30, 2013,

... systems: EAS allows the development of adaptive modules for each individual assembly process. In principle this is possible as it was proven in the laboratories of Schneider, Masmec, and Festo. However, this needs to be combined with real-time adaptability and advanced control solutions in order to attain self-learning and self-diagnosing systems: true adaptability. These IDEAS objectives go well ...
Read Project

 10

 FINISHED 

Resilient Multi-Plant Networks (REMPLANET)

Start date: May 1, 2009, End date: Apr 30, 2012,

"The main concept of this proposal is the development of methods, guidelines and tools for the implementation of the Resilient Multi-Plant Networks Model in non-hierarchical manufacturing networks, characterised by non-centralised decision making. A resilient organization effectively aligns its strategy, operations, management systems, governance structure, and decision-support capabilities so tha ...
Read Project

 14

 FINISHED 
...ists of highly experienced research institutes such as Fraunhofer, Joanneum and Acreo and the University of Linz. Application scenarios are determined by the driving industrial partners such as, IEE, Festo, or Motorola. ASEM and Emfit – as an SME – are enriching the consortium as material supplier, manufacturer of process tools and end user.3PLAST consortium provides completely new solutions in th ...
Read Project

 10

 FINISHED 
The competitiveness of European industry is a vital requirement for wellbeing in Europe. The companies have constant need for product, process and production development. Most European higher education institutes (HEIs) provide high quality engineering education and research, but their resources are not utilized for a broad support of industry.The RePCI-project collates the needs of the industry a ...
Read Project

 9

 FINISHED 
The EQUAL-CLASS project focussed on qualifications in the field of mechatronics/electrical engineering, which can be achieved in higher non-university VET institutions or comparable institutions in the following countries: AT, CH, DE, LT, PT. Therefore, the EQUAL-CLASS project, as a Transfer of Innovation project, aimed to transfer the methodology developed in the previous ZOOM project.ZOOM develo ...
Read Project

 21

 FINISHED 
Needs analysis:According to the 2006 OECD study on “Schooling for Tomorrow: Personalizing Education” individualized learning on demand was transferred from customized production processes in industry into VET. Didactical approach:For education this shift from a “push” to a “pull approach” is strongly recommended and favoured by findings from neuroscience, pedagogy and systems theory.Hereby the tea ...
Read Project

 6