Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
To handle the unprecedented demand for mobile data traffic, different vendors, operators and research programmes have aimed to develop radio access technologies (RATs) that boost physical-layer link capacity, utilize millimeter wave radio, or further densify network topology. Notable steps have also been made towards shifting baseband processing from the (currently) ultra dense network edge to a c ...
Read Project

 10

 FINISHED 
The continuously growing need for higher data-rates and, therefore, more signal bandwidth in wireless communications, requires the use of multi-antenna base stations employing the recently introduced massive Multiple-Input-Multiple-Output (MIMO) concept and operating at millimeter-wave frequencies, e.g. 30 GHz. However, the implementation of such complex antenna systems into highly-integrated, ene ...
Read Project

 6

 FINISHED 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Read Project

 14

 FINISHED 

Complex and Open Innovation for Networked Society (COINS)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

...ble of finding solutions for some of the greatest challenges facing our planet. The COINS objectives will be achieved by establishing a long-term partnership between the University of Leeds and Ericsson AB. They are joined by technology start-up Diamentech.
Read Project

 2

 FINISHED 

A network slice for every service (5GPagoda)

Start date: Jul 1, 2016, End date: Jun 30, 2019,

5G!Pagoda represents the next evolution step in softwarized networks as supported by NFV, SDN and aimed at by the 5G network evolution. The top objectives of 5G!Pagoda are i) the development of a scalable 5G slicing architecture towards supporting specialized network slices composed on multi-vendor network functions, through the development of ii) a scalable network slice management and orchestrat ...
Read Project

 7

 FINISHED 
Information access on the Internet is exploding. Usage is shifting to multimedia applications, social networking and IoE. Cellular networks are moving to the next generation. Networking technology is shifting towards virtualization, with SDN and NFV likely to change the infrastructure landscape. The cloud concept is transforming the Internet to a network of data centers, with a communication model ...
Read Project

 7

 FINISHED 
The fifth-generation (5G) is coming.Quo vadis 5G?What architectures, network topologies and technologies will define it?Are methodologies to the analysis, design and optimization of current cellular networks still applicable to 5G? 5Gwireless is the first integrated and multi-disciplinary training-through-research network of ESRs and Senior Supervisors fully committed to re-architecting current ce ...
Read Project

 10

 FINISHED 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Read Project

 19

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
...d internet access to mobile communication devices in urban environment. The key technology end-user driving the primary prototype development and demonstration of a complete THz communication link is Ericsson. A secondary prototype developed in M3TERA is on a multi-function adaptive THz sensor platform for different millimeter-wave sensing applications in society, including food quality control an ...
Read Project

 8

 FINISHED 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Start date: Jul 1, 2015, End date: Dec 31, 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Read Project

 21

 FINISHED 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Start date: Nov 1, 2015, End date: Oct 31, 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Read Project

 16

 FINISHED 

Training network on tRAcking in compleX sensor systems (TRAX)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

...mplex Sensor Systems, covering interdisciplinary and intersectoral aspects in this newly emerging supra-disciplinary field. The TRAX consortium comprises two large companies (Thales Nederland B.V., Ericsson A.B.); two SMEs (Rinicom Limited, Xsens Technologies B.V.); a research institute ( Fraunhofer) and three universities (University of Lancaster, Linköping University and University of Twente); a ...
Read Project

 8

 FINISHED 
...ty for 13 ESRs and one ER in a network comprising seven partners and nine associate partners. The METRICS network comprises four strong academic partners (Aalto, UC3M, UCAM, UCL), three vendors (NEC, Ericsson, Narus), four ISPs (BT, TID, IIJ, Elisa), two operators of global measurement infrastructures (SamKnows, RIPE), and three partners for business education (EOI, IE, Principae). It thus offers ...
Read Project

 7

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
...bile broadband services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Univer ...
Read Project

 19

 FINISHED 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Read Project

 24

 FINISHED 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Read Project

 19

 FINISHED 

MAssive MiMO for Efficient Transmission (MAMMOET)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

The Internet of the future will to a large extent rely on mobile networks. Mobile data grew with 70% in 2012 and is predicted to grow 13-fold in the next 5 years. This puts very high demands on the development of mobile access technology. MAMMOET will advance the development of Massive MIMO (MaMi), a new and most promising direction in mobile access. MaMi makes a clean break with current technolog ...
Read Project

 8

 FINISHED 
Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Read Project

 20

 FINISHED 
Description COMPEIT creates interactive, personalised, shared media experiences on the Internet for feeling more present when interacting remotely with other people and enjoying media together.Internet-based distribution will transform media broadcasting towards higher levels of interactivity and integration with virtual, mixed and augmen ...
Read Project

 7

 FINISHED 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Start date: Oct 1, 2011, End date: Sep 30, 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Read Project

 45

 FINISHED 
An increasing number of cities have started to introduce new ICT enabled services. However, the uptake of smart city applications is hindered by various issues, such as the difficulty of integrating heterogeneous data sources and the challenge of extracting up-to-date information in real-time from large-scale dynamic data. Today the challenges are often addressed by application specific solutions ...
Read Project

 10

 FINISHED 

Adressing Energy in Parallel Technologies (ADEPT)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The ADEPT project will address the challenge of energy-efficient use of parallel technologies. ADEPT will build on the expertise of software developers from high-performance computing (HPC) to exploit parallelism for performance, and on the expertise of Embedded systems engineers in managing energy usage. ADEPT will develop a tool that will guide software developers and help them to model and pred ...
Read Project

 5

 FINISHED 

Unifying Cloud and Carrier Networks (UNIFY)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Read Project

 16

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
The COCONUT proposal aims at the definition, study and realization of a new fully scalable optical access network significantly extending the network dimensions in terms of bandwidth utilization, reach and number of accommodated users. The envisioned access network evolves from the almost-commercial WDM-PON architecture to the realisation of the Ultra-Dense WDM solutions, opening the way to the "w ...
Read Project

 8

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 
...licy that is an integral part of the Horizon 2020 strategy.Consortium: PLACES2BE Pilot line gathers 27 experienced partners, including industry leaders such as GLOBALFOUNDRIES, ARM, STEricsson, SOITEC, MENTOR Graphics along the microelectronics value chain, SMEs such as Open Engineering, eSilicon, GSS, Axiom, IBS, RTOs such as the Fraunhoger Gesellschaft, IMEC, and LETI, and several academic teams ...
Read Project

 22

 FINISHED 

Future INternEt Smart Utility ServiCEs (Finesce)

Start date: Mar 1, 2013, End date: Sep 30, 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Read Project

 34

 FINISHED 
The SEMAFOUR project will design and develop a unified self-management system, which enables the network operators to holistically manage and operate their complex heterogeneous mobile networks. The ultimate goal is to create a management system that enables an enhanced quality of user experience, improved network performance, improved manageability, and reduced operational costs. SEMAFOUR aims at ...
Read Project

 9

 FINISHED 

Minerals Intelligence Network for Europe (MINERALS4EU)

Start date: Sep 1, 2013, End date: Aug 31, 2015,

The Minerals4EU project is designed to meet the recommendations of the Raw Materials Initiative and will develop an EU Mineral intelligence network structure delivering a web portal, a European Minerals Yearbook and foresight studies. The network will provide data, information and knowledge on mineral resources around Europe, based on an accepted business model, making a fundamental contribution t ...
Read Project

 32

 FINISHED 
In 2020, mobile and wireless traffic volume is expected to increase thousand-fold over 2010 figures. Moreover, an increase in the number of wirelessly-connected devices to counts in the tens of billions will have a profound impact on society. Massive machine communication, forming the basis for the Internet of Things, will make our everyday life more efficient, comfortable and safer, through a wid ...
Read Project

 24

 FINISHED 
The exponential growth in the number of cores requires radically new software development technologies. Many expect 100,000-core platforms to become commonplace, and the best predictions are that core failures on such an architecture will be common, perhaps one an hour. Hence we require programming models that are not only highly scalable but also reliable. The project aim is to scale the radic ...
Read Project

 8

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

immersiVe ENhancemenT of User-woRld Interactions (VENTURI)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

Augmented Reality (AR) is a concept and a vision that has been with us, and will be with us, for the foreseeable future. We're already augmented today using mobile devices with a connection to the Internet allowing us to almost instantly gain access to the collective global human knowledge. We're starting to add visual augmentation into some devices, but we are only tapping into a small part of th ...
Read Project

 9

 FINISHED 

Adaptive Transceivers for Wireless Communications (ATWC)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

...rent areas of expertise: University of Pavia and the University of Lund in RF integrated circuit design, Marvell on the definition of the targets and on the industrial compatibility of the solutions, Ericsson on communications and system aspects. They are all well known for their contributions to the design and implementation of electronic circuits and systems for mobile terminals. As such they re ...
Read Project

 5

 FINISHED 

Networked Society (NetSoc)

Start date: Jul 1, 2012, End date: Jun 30, 2014,

The strategic objective of the Networked Society project is to define the requirements for future networks that can seamlessly support the Networked Society of 2020. This will be achieved by enabling an informed dialogue and policy debate between the terrestrial, satellite and content delivery communities and the industrial and social application sectors. This project will create new and lasting r ...
Read Project

 10

 FINISHED 

Harmonised eCall European Pilot (HeERO)

Start date: Jan 1, 2011, End date: Jun 30, 2014,

The HeERO project will prepare, carry-out and coordinate eCall pre-deployment pilots at European level taking into account the approved standards. The overall project objective is to prepare for the deployment of the necessary infrastructure in Europe with the aim of making the Pan-European in-vehicle emergency call service eCall a reality.In order to address the eCall interoperability which would ...
Read Project

 39

 FINISHED 
FLEXWIN proposes a significant advance towards smart RF microsystems by combining 1.) an RFMEMS switch process monolithically integrated with a Si/SiGe BiCMOS process, 2.) highly reconfigurable mm-wave building blocks, able to be used over a broad frequency range and for different applications, 3.) a new RF-system design paradigm built around the concepts of reusability, multifunctionality and re ...
Read Project

 8