Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 
The transportation industry has for a long time been engaged in the application of new lightweight materials for primary structural design in an effort to develop more energy efficient structures to meet low emissions targets without compromising public safety.This is also true for the rail industry, but the implementation of new lightweight materials has been slow mainly due to the lack of suita ...
Read Project

 19

 FINISHED 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Read Project

 20

 FINISHED 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Read Project

 21

 FINISHED 

Eddy CUrrent Brake Compatibility (ECUC)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

The ECUC (Eddy-Current Brake Compatibility) project's objective is to prove that linear eddy-current brake (ECB) is a very effective and applicable solution for increasing the braking capacity of new high speed trains and solving the concerns raised by infrastructure managers by proposing concrete and realistic solutions to overcome the drawbacks that ECB have experienced on some lines.This propos ...
Read Project

 9

 FINISHED 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Read Project

 18

 FINISHED 
Safety assurance and certification are amongst the most expensive and time-consuming tasks in the development of safety-critical embedded systems. European innovation and productivity in this market is curtailed by the lack of affordable (re)certification approaches. Major problems arise when evolutions to a system entail reconstruction of the entire body of certification arguments and evidence. F ...
Read Project

 21

 FINISHED 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Read Project

 15

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 
"EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, r ...
Read Project

 24

 FINISHED 

Clean European Rail - Diesel (CleanER-D)

Start date: Jun 1, 2009, End date: Jan 31, 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Read Project

 27

 FINISHED 

Railway Induced Vibration Abatement Solutions (RIVAS)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

"Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. ...
Read Project

 27

 FINISHED 
Mutation of transport industry to carbon fibre reinforced polymer (CFRC) is now ineluctable in order to reduce our mobility environmental imprint. This sector is at a turn of its conversion from metal to composite, which should impose a radical rethinking of the whole supply chain. Combined developments of materials and matched processes is the main strategy of IMS&CPS project, only such a concert ...
Read Project

 16

 FINISHED 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Read Project

 23

 FINISHED 

Transport Fire Safety Engineering in the European Union (TRANSFEU)

Start date: Apr 1, 2009, End date: Nov 30, 2012,

There is an urgent need to have a confident toxicity measurement methodology that contributes to the existing level of surface transport fire safety, which is the most difficult issue to assess in case of fire. The lack of confidence in the robustness of the existing product toxicity classification forbids its acceptance as a standard which prevent the European industry from common safety rules an ...
Read Project

 22

 FINISHED 

Modular Urban Transport Safety and Security Analysis (MODSafe)

Start date: Sep 1, 2008, End date: Aug 31, 2012,

The European Urban Guided Transport sector (Light rails, Metros, but also Tramways and Regional Commuter trains) is still characterized by a highly diversified landscape of Safety Requirements, Safety Models, Responsibilities, Roles, Safety Approval, Acceptance and Certification Schemes. While a certain convergence in architectures and systems can be observed the safety life cycle still differs f ...
Read Project

 22

 FINISHED 
"The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. AEROTRAIN will help meet the business sce ...
Read Project

 18

 FINISHED 
"The current interoperability approval process for new High Speed and Conventional railway vehicles in Europe is a very long and costly process. The Technical Specifications for Interoperability provide common regulations for the homologation of new rolling stock but do not directly eliminate the current burdens regarding new vehicle approval on each network. In this context, the pantograph/catena ...
Read Project

 16

 FINISHED 
The environmental, societal, and economic drivers of an efficient urban transport system are well acknowledged and are reflected in the local transport plans of all major urban areas. The overall concept of the project is to facilitate the achievement of this goal by generating solutions to currently identified barriers that form the project imperatives, which have been established through close c ...
Read Project

 16

 FINISHED 
"The purpose of SKILLRAIL is to contribute to the enhancement of the transport sector by fostering a better match between the human resources needs to make railways a more competitive and innovative sector and the offer of skills coming out of the different research based education and training institutions across Europe.Rail transport in Europe is a future-oriented industry and is striving to off ...
Read Project

 10