Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

APOSTANDO POR LA MOVILIDAD

Start date: Jul 1, 2016, End date: Jun 30, 2018,

OSCUS Seville Center presents this new proposal based on its Globalization Plan in order to continue OSCUS DUAL (Leonardo da Vinci) y OSCUS DUAL II (Erasmus +). The main objective is that Intermediate Degree Students of Vocational Training can improve their professional, personal and linguistic competences in a multicultural environment. As well, they have the opportunity to expand their professio ...
Read Project

 24

 FINISHED 

CRECIENDO EN EUROPA 2

Start date: Sep 1, 2015, End date: Aug 31, 2017,

The Consortium that we present today has been promoted at a local level by the Town Hall o Jerez together with the following Vocational Schools of this town: IES Andrés Benítez, C.C La Salle Sagrado Corazón de Jesús, IES La Granja, IES Fernando Quiñones, IES Francisco Romero Vargas y el C.E. MAnuel Lora Tamayo. This proposal is the result of our concern for the actual situtation of our youngsters, ...
Read Project

 50

 FINISHED 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Read Project

 15

 FINISHED 

SEGUIMOS EN EUROPA

Start date: Sep 1, 2015, End date: Aug 31, 2016,

In the project 14 students from intermediate vocational training ('CGFM') specialty of Administration and Management, Electricity and Electronics, Community Care and Socio-cultural Services, Health Care, Transport and Vehicle Maintenence and Hospitality and Tourism of Santa María de Guía High School have carried out thirty days of placements in Reggio Calabria (Italy) to enhance the international ...
Read Project

 9

 FINISHED 

People Centric easy to implement e-mobility (FREE-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Read Project

 14

 FINISHED 

Advanced Gratting for Thin Films Solar Cell (AGATHA)

Start date: Sep 1, 2010, End date: Aug 31, 2016,

"The minority carrier diffusion lengths are small in polycrystalline or amorphous materials used in thin film solar cells, requiring thin layers to maximize charge collection. This is contradictory for the requirement to maximize solar energy absorption. The optical design consisting in increasing solar cell’s light-trapping capability is of prime importance. In order to provide total internal ref ...
Read Project

 6

 FINISHED 
Description Robot-Era develops, implements and demonstrates the general feasibility, scientific/technical effectiveness and social/legal plausibility and acceptability of a plurality of complete advanced robotic services, integrated in intelligent environments. These robotic services will actively work in real conditions and cooperate with r ...
Read Project

 12

 FINISHED 
We propose to establish a special detector-training network aiming to extend the application of cutting-edge technologies developed in High Energy Physics (HEP) to other domains, such as medical imaging. A large number of detector techniques, developed for and used in particle physics experiments, has been transferred successfully to other fields. Most prominent are their applications in medicine, ...
Read Project

 11

 FINISHED 
The NAVOLCHI project explores, develops and demonstrates a novel nano-scale plasmonic chip-to-chip and system-in-package interconnection platform to overcome the bandwidth, foot-print and power consumption limitations of todays electrical and optical interconnect solutions. The technology exploits the ultra-compact dimensions and fast electronic interaction times offered by surface plasmon polarit ...
Read Project

 8

 FINISHED 
Stroke and other neurological conditions affect the population of infants in percentages that cannot be considered marginal. Preterm infants are the highest infants at risk for neurological damage. Currently, infants have rehabilitation sessions few times a week in rehabilitation centres but according to basic neuroscience it would be necessary to provide them with an early, intensive and multiaxi ...
Read Project

 7

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
"Presently, drives for Fully Electric Vehicles and Hybrid Electric Vehicles develop their highest efficiency of around 93~95% within a speed range of usually 1/4 to 1/3 of the maximum, and at an ideal torque, whereas in real-life driving cycles the motor operates at a wider range of speeds and at partial load, resulting in much lower efficiency.Hi-Wi will address this mismatch by advancing the des ...
Read Project

 7

 FINISHED 
"While architectural requirements, and mechanical and thermal constraints imposed on an electrical powertrain are much less stringent when compared to conventional ICE based vehicles, the needs for cost reduction and range enhancement demand light structures, advanced aerodynamic solutions and optimisation of the drive train as a whole.WIDE-MOB addresses the design and development of EV’s basic bu ...
Read Project

 7

 FINISHED 

Interconnection technologies for flexible systems (Interflex)

Start date: Jan 1, 2010, End date: Nov 30, 2013,

InterFlex targets the development and standardisation of interconnects within flexible foil systems: On-foil connections of different components on a single substrate foil and interconnection of several functional foils into a foil system. The integration technologies required, when building a flexible foil system, i.e. homogeneous integration of electrical components on foils, heterogeneous Si IC ...
Read Project

 7

 FINISHED 
Europe benefits from leadership across a breadth of industries including automotive, avionics, ICT, medical equipment and industrial automation. Incorporated Smart Systems, including smart components (and in the future MNBS) often provide the key technical features for the competitiveness of products in these sectors.The objectives of IRISS are to hedge and extend competitive advantages of Europea ...
Read Project

 16

 FINISHED 

SILICON NANODOTS FOR SOLAR CELL TANDEM (NASCEnT)

Start date: Sep 1, 2010, End date: Aug 31, 2013,

The overall objective of the project is to develop new Nanomaterials with New Production Technologies and to fabricate silicon quantum dot tandem solar cells to achieve increased efficiencies. The understanding of electrical transport and recombination mechanisms in these newly developed nanomaterials will enable us to design new tandem solar cell structures - based on Si thin-film or wafer solar ...
Read Project

 8

 FINISHED 
FAB2ASM tackles a major problem in 3D integration that currently limits industrial take-up: high throughput and high accuracy 3D integration of miniaturized dies onto dies or substrates. This issue is extremely important for 3D integration of microelectronics and microsystems. 3D integration will take off in the next 5 years in all measures including total number of devices, the market share, as w ...
Read Project

 10

 FINISHED 
"The project is focused on the definition of a comprehensive genetic epidemiological model of complex traits like Essential Hypertension (EH) and intermediate phenotypes of hypertension dependent/associated Target Organ Damages (TOD). To identify the common genetic variants relevant for the pathogenesis of EH and TODs, we will perform a Whole Genome Association (WGA) study of 4.000 subjects recrui ...
Read Project

 19

 FINISHED 
"Recent developments in molecular tools combined with updated epidemiological data provide novel challenges to the development of modern molecular diagnostics. The increasing threat of infections due to Mycobacterium tuberculosis, including multidrug-resistant (MDR) and extensively drug-resistant (XDR) infections poses important questions that call for development of integrated tools for rapid dia ...
Read Project

 9

 FINISHED 

Wavelength Division Multiplexed Photonic Layer on CMOS (WADIMOS)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

WADIMOS proposes to develop a generic technology for the realization of complex electro-photonic integrated ICs using standard CMOS processing technologies.These ICs will contain a photonic interconnect layer incorporating microsource arrays and ultracompact WDM (wavelength division multiplexing) functionality based on silicon nanophotonic wire circuits, driven directly from by the CMOS electronic ...
Read Project

 8

 FINISHED 
Microsystems will evolve in the future into integrated smart systems which are able to sense and diagnose a situation, which are predictive, and therefore are able to decide and help to decide. Smart systems address and identify each other and enable the products in which they are incorporated in to interact with the environment and with other smart systems. The CA CEPoSS will deal with Smart Syst ...
Read Project

 16