Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Read Project

 14

 FINISHED 

EPOS Implementation Phase (EPOS IP)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

The nations of Europe are distributed around some of the most complex and dynamic geological systems on the planet and understanding these is essential to the security of livelihoods and economic power of Europeans. Many of the solutions to the grand challenges in the geosciences have been led by European scientists – the understanding of stratigraphy (the timing and distribution of layers of sedi ...
Read Project

 48

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Read Project

 38

 FINISHED 
The aim of SANSA project is to boost the performance of mobile wireless backhaul networks in terms of capacity and resilience while assuring an efficient use of the spectrum. Recently, a global mobile traffic increase of 11-fold between 2013 and 2018 was predicted, so novel solutions are required to avoid backhaul becoming the bottle neck of future mobile networks. The solution envisaged in SANSA ...
Read Project

 8

 FINISHED 

Adaptable Platform for Active Services Exchange (AnyPLACE)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

...lems related with the variability of renewable based generation.To enable the development of an effective modular and flexible platform, an analysis to the different regulatory frameworks, energy/telecommunications standards, potential scenarios of deployment, technical requirements of the solution and technologies currently available will be performed. A modular and plug and play SW and HW platfo ...
Read Project

 8

 FINISHED 

Social Innovation: Driving Force of Social Change (SI-DRIVE)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

SI-DRIVE extends knowledge about social innovation (SI) in three major directions:- Integrating theories and research methodologies to advance understanding of SI leading to a comprehensive new paradigm of innovation.- Undertaking European and global mapping of SI, thereby addressing different social, economic, cultural, historical and religious contexts in eight major world regions.- Ensuring rel ...
Read Project

 28

 FINISHED 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

"Forensic investigation is a key component in the fight against crime and the protection of EU societies. At present it is hampered by a lack of protocols and training in carrying out forensic analysis on CBRN-contaminated materials. The aim of GIFT-CBRN is to develop a forensic toolbox for investigating CBRN incidents. This toolbox would provide (1) procedures, sampling methods and detection of C ...
Read Project

 20

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Building EGNSS capacitY On EU Neighbouring multimodal Domains. (BEYOND)

Start date: Apr 1, 2015, End date: Mar 31, 2017,

The overall project concept consists of building capacity in the field of multi-modal applications, focussed mainly on aviation using EGNSS in different Eastern European and Mediterranean countries. These countries are located at boundaries of the EGNOS SOL coverage area with limited EGNSS experience; the projects will promote the development of multi-modal applications, building on the lessons le ...
Read Project

 19

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

COgnitive & Perceptive CAMeraS (COPCAMS)

Start date: Apr 1, 2013, End date: Sep 30, 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Read Project

 25

 FINISHED 

Minerals Intelligence Network for Europe (MINERALS4EU)

Start date: Sep 1, 2013, End date: Aug 31, 2015,

The Minerals4EU project is designed to meet the recommendations of the Raw Materials Initiative and will develop an EU Mineral intelligence network structure delivering a web portal, a European Minerals Yearbook and foresight studies. The network will provide data, information and knowledge on mineral resources around Europe, based on an accepted business model, making a fundamental contribution t ...
Read Project

 32

 FINISHED 

Boosting European Games Industry (BOO-Games)

Start date: Dec 31, 2011, End date: Dec 30, 2014,

Once the economic force of Creative Industries (CI) was showcased by several studies,the development of strong digital+interactive media strategies is still high on the agenda throughout Europe. Especially the digital games market is a fast growing market within CI:The global demand for digital games is expected to grow 10% annually in the next years.Today the production of dig.games is an interna ...
Read Project

 14

 FINISHED 

European Plate Observing System (EPOS)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

To understand the complex Earth System requires an integrated observational strategy and infrastructure to record key diagnostic features of its dynamics. Accordingly, this infrastructure must include geographically distributed and multidisciplinary monitoring instruments and observations. The European Plate Observing System (EPOS) will meet this challenge. The proposed RI (EPOS) will create a sin ...
Read Project

 23

 FINISHED 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Start date: Oct 1, 2011, End date: Oct 31, 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Read Project

 28

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 
NEREIDS will bring innovate capablities based on EO to make a best exploitation of available space technologies.NEREIDS capabilities will bring enhancedEO capabilities by combining different sensors with innovative data fussion tecniques.NEREIDS will bring a toolbox apporach enabling share data an capabilities and support a comon maritime piture.NEREIDS will make an analysis of maritime surveillan ...
Read Project

 20

 FINISHED 
In front of more and more differentiating innovation policy and funding mixes in SEE, which increasingly leverage national budgets and bridge between different policy fields, the absence of sufficient endogenous RTDI evaluation capacities causes a serious bottleneck for the entire innovation management cycle. Thus, the key objective of EVAL-INNO is to strengthen regional as well as national evalua ...
Read Project

 6

 FINISHED 
The 8th Africa-EU Strategic Partnership interlinks 3 priorities which can leverage a faster socio-economic development in Africa. Africa/Europe have recognised that the development of STI & the spreading of ICT to all components of a society are key. P8 new Action Plan lists as a priority the development of an inclusive information society in Africa. In that perspective is being formed a multi-sta ...
Read Project

 12

 FINISHED 
Overall objective of the project is creating the conditions for promoting economic development in the programme region by meeting the needs of today's information and telecommunication (ICT) technologies and services on the areas of development of interactive digital television technology and services based on cross-border cooperation. Specific objectives are combining achievements and potential o ...
Read Project

 5

 FINISHED 
...nd novel simulation methodology for achieving these complex optimizations.Multi-standard multi-band terminals integrating all standards (e.g. GSM/EDGE, UMTS, LTE,) and beyond that additional wireless communications systems for mobile devices (such as Wi-Fi, GPS, WirelessHD, WirelessUSB, NFC, PMR, all digital TV standards, etc.) in a single radio architecture with the lowest number of external SAW ...
Read Project

 41

 FINISHED 

Sea Border Surveillance (SeaBILLA)

Start date: Jun 1, 2010, End date: Feb 28, 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Read Project

 29

 FINISHED 

Enabling access to geological information in support of GMES (PANGEO)

Start date: Feb 1, 2011, End date: Jan 31, 2014,

PanGeo is a service proposed in response to FP7 GMES Downstream Call 3 (released July 2009). The objective of PanGeo is to enable free and open access to geohazard information in support of GMES. This will be achieved by the generation of a validated Geohazard Data Layer supported by a Geohazard Summary for 52 of the largest towns listed in the GMES Land Theme’s Urban Atlas involving all 27 coun ...
Read Project

 43

 FINISHED 

Efficient Integrated Security Checkpoints (EFFISEC)

Start date: May 1, 2009, End date: Jan 31, 2014,

...ty and legal issues) for all types of borders, EFFISEC will focus on four technical key issues: documents and identity check, detection of illicit substances, video surveillance and secured communications. The technology proposed will be demonstrated for pedestrians, and travellers using cars and buses; standardisation aspects will be considered and results disseminated.
Read Project

 18

 FINISHED 

Tourist Guide for Northern Periphery (TG4NP)

Start date: Jun 14, 2010, End date: Sep 29, 2013,

The aim of the TG4NP project is to support tourism industry of peripheral regions by enhancing the visitors experiences in cultural and natural heritage destinations with the help of multimodal mobile information services. Project will develop potential new approaches to efficient and sustainable management and utilisation of resources in natural and cultural heritage. The idea is to exploit the l ...
Read Project

 11

 FINISHED 
The ALICANTE project proposes a novel concept towards the deployment of a networked 'Media Ecosystem'. The proposed solution is based on a flexible cooperation between providers, operators, and end-users, finally enabling every user to access the offered multimedia services in various contexts, and to share and deliver his own audiovisual content dynamically, seamlessly, and transparently. Towards ...
Read Project

 21

 FINISHED 
CONECT proposes a holistic network design approach that drastically enhances performance in wireless networks by unlocking the hidden potential of the broadcast wireless medium. Information and communication theory, and protocol design engineering are used as the foundations for developing provably optimal cooperative information forwarding strategies, from multi-signal fusion to packet relay and ...
Read Project

 6

 FINISHED 
FIEMSER (Friendly Intelligent Energy Management System for Residential Building) addresses the need of achieving energy positive buildings through solutions based on a rational consumption of energy, local generation and an increase in the consciousness of the building owners towards their energy consumption habits.The main goal of FIEMSER matches with the challenges of the Call by aiming to build ...
Read Project

 8

 FINISHED 

Integrated Mobile Security Kit (IMSK)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Read Project

 29

 FINISHED 
The overall objective of the Geo-Seas project is to effect a major and significant improvement in the overview and access to marine geological and geophysical data and data-products from national geological surveys and research institutes in Europe by upgrading and interconnecting their present infrastructures.The Geo-Seas partnership has taken a strategic decision to adopt the SeaDataNet interope ...
Read Project

 31

 FINISHED 
The CAAST-Net project will establish a platform to promote improved cooperation in science and technology between Europe and Sub-Saharan Africa. To achieve this objective, CAAST-Net will analyse the current European and African S&T cooperation landscape, and undertake S&T policy analyses. Informed by the outcomes of analyses, CAAST-Net will initiate and support European-African S&T policy dialogu ...
Read Project

 25

 FINISHED 
The EWTC II project started in 2009 and was a follow up of the EWTC project completed in 2007, with the overall aim to highlight the development of a ”Green Corridor Concept” as a best practise case in the European context. Green transport corridors are defined as a concentration of freight traffic between major hubs and by relatively long distances where short sea shipping, rail, inland waterways ...
Read Project

 29

 FINISHED 
Transport security and accessibility are essential for a balanced and sustainable development of ASP. Due to current climatic trends, the vulnerability of transport infrastructure to natural hazards has increased. But the specific threats to transport infrastructure have not yet been tackled in a systematic joint effort. Therefore the goal of PARAmount is to improve risk management strategies for ...
Read Project

 13

 FINISHED 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

... are complex and significant research efforts are needed to bring these techniques to reality.The main ARTIST4G project objective is to improve the ubiquitous user experience of cellular mobile radio communications systems by satisfying the following requirements:¿\tHigh spectral efficiency and user data rate across the whole coverage area¿\tFairness between users¿\tLow cost per information bit¿\t ...
Read Project

 18

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 
Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Read Project

 37

 FINISHED 
The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Read Project

 19

 FINISHED 
"The present proposal aims at the development of a prototype surveillance system based on autonomous, smart monitoring devices that capture data only upon the occurrence of an incident, potentially dangerous for the pas-sengers (like an explosion blast or the triggering of the fire detector). When triggered, these devices propagate the triggering to their neighbouring de-vices and send an alarm. S ...
Read Project

 8

 FINISHED 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper ...
Read Project

 39