Search for European Projects

29 European Projects Found

Searched on 125080 European Projects

 FINISHED 

PRACE 5th Implementation Phase Project (PRACE-5IP)

Start date: Jan 1, 2017, End date: Apr 30, 2019,

PRACE, the Partnership for Advanced Computing is the permanent pan-European High Performance Computing service providing world-class systems for world-class science. Systems at the highest performance level (Tier-0) are deployed by Germany, France, Italy and Spain providing researchers with over 11 billion core hours of compute time. HPC experts from 25 member states enabled users from academia an ...
Read Project

 30

 FINISHED 
The ability to simulate aerodynamic flows using CFD methods has progressed rapidly over the last decades and has given rise to a change in design processes in aeronautics already. But more improvement is necessary to overcome the (still) existing lack in confidence in CFD usage, based on turbulence modelling. The TILDA project will offer methods and approaches combining advanced and efficient high ...
Read Project

 12

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
Hybrid-EVs and Full-EVs on the market are products where the Internal-Combustion-Engine (ICE) is supplemented by an electric-motor (HEV) or replaced by an all-electric power-train (FEV). Neither approach address lightweight or modularity inheriting the same disadvantages as conventional ICEV - Electrification of mobility must face a conceptual rEVOLUTION! This project breaks the paradigm of curren ...
Read Project

 25

 FINISHED 

Thermal Overall Integrated Conception of Aircraft (TOICA)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Thermal behaviour of aircraft has recently become a crucial subject due to many factors: increasing number of complex systems required by modern, more electric, commercial aircraft, the introduction of hotter engines with higher by-pass ratios, the increased use of composite material in aircraft structures, or the confinement of highly dissipative equipment and systems in smaller areas to earn spa ...
Read Project

 34

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
The goal of this project is to reduce the power performance ratio within data-centres by improving the usability and usefulness of FPGAs, embedded CPU (eCPU), GPUs and multi/manycore accelerators in high-performance and low-power heterogeneous computing servers. We target applications between traditional super computing tasks (where huge amount of man-power can be spent for manual algorithm optimi ...
Read Project

 10

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 

Boltless assembling Of Primary Aerospace Composite Structures (BOPACS)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

"The main challenge of the BOPACS project is to reduce the weight and costs of primary aerospace structures by developing bolt free adhesive bonded joints that comply with the airworthiness requirements.Until today thin walled composite primary aerospace structures are joined by using a large number of fasteners. Bolt free joining would considerably contribute to the weight and cost reduction of a ...
Read Project

 14

 FINISHED 
The objective of this ITN is to develop the next generation methods integrating numerical simulation and geometric design technology. Currently, geometric design and simulation is based on different geometry representation hampering the effective design of Engineering structures, materials and components. Isogeometric analysis developed recently tries to remove those drawbacks by integrating CAD s ...
Read Project

 7

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 
By combining a new surface engineering process with state-of-the-art thermal modelling, significant design and performance improvements to heat exchangers for electronic and electrical systems can be made. The surface designs created will not only provide an increase in surface area (allowing for smaller size heat exchanger packaging), but also enable ‘designed’ flow over a surface (which will enh ...
Read Project

 6

 FINISHED 

High Integrity Low Distortion Assembly (HILDA)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

"HILDA will deliver a cost effective, low distortion welding process for EU shipyards to allow them to maintain competitiveness and produce light, strong, more fuel efficient vessels. The solid state technique will enable the modular construction of dimensionally accurate, high strength, corrosion resistant fabrications across the entire range of steels, enabling the introduction of stronger, toug ...
Read Project

 8

 FINISHED 

Cryogenic Hypersonic Advanced Tank Technologies (CHATT)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

"Topic: Cryogenic propellant management and advanced tank design for hypersonic and advanced future aviation systemsIn future aviation and particularly in hypersonic systems new propellants will be used, such as liquid hydrogen, liquid methane and possibly even liquid oxygen. These systems will require complex technology, ultra light-weight, and reusable propellant tank systems. Challenging techno ...
Read Project

 11

 FINISHED 

Cost Effective Reinforcement of Fastener Areas in Composites (CERFAC)

Start date: Oct 1, 2010, End date: Dec 31, 2014,

"CERFAC’s major challenge is the design and manufacturing of strong and cost-efficient joints for high performance CFRP aero-structures.In particular, transfer of distributed loading along rivets lines in the assembly of flat or curved thin-walled stiffened panels, and introduction of concentrated loads for connecting lugs with thicker laminates are special & frequent problems. Hence, CERFAC focus ...
Read Project

 15

 FINISHED 
...mpanies in NWE. in order to provide support and assistance throughout the period of profound industrial change linked to the arrival of composite materials. The aim is to rely on the “technological centres of excellence” and on the dynamics that they have created in their area of expertise. whilst providing a favourable climate to generate the necessary synergies. which will allow us to reach our ...
Read Project

 13

 FINISHED 
"The goal of ERICKA is to directly contribute to reductions in aircraft engine fuel consumption with a targeted contribution of 1% reduction in SFC relative to engines currently in service. The fuel efficiency of a jet engine used for aircraft propulsion is dependent on the performance of many key engine components. One of the most important is the turbine whose efficiency has a large influence ...
Read Project

 20

 FINISHED 

Low Emission Gas Turbine Technology for Hydrogen-rich Syngas (H2-IGCC)

Start date: Nov 1, 2009, End date: Apr 30, 2014,

The overall objective of this project is to provide and demonstrate technical solutions which will allow the use of state-of-the-art highly efficient, reliable gas turbines in the next generation of IGCC plants, suitable for combusting undiluted hydrogen-rich syngas derived from a pre-combustion CO2 capture process, with high fuel flexibility. The recognised challenge is to operate a stable and co ...
Read Project

 25

 FINISHED 
"The proposed IDIHOM project is motivated by the increasing demand of the European aerospace industries to advance their CFD-aided design procedure and analysis by using accurate and fast numerical methods, so-called high-order methods. They will be assessed and improved in a top-down approach by utilising industrially relevant complex test cases, so-called application challenges in the general ar ...
Read Project

 21

 FINISHED 

Integrated management of product heterogeneous data (iProd)

Start date: Feb 1, 2011, End date: Jan 31, 2014,

Description iProd aims to improve the efficiency and quality of the Product Development Process of innovative products by developing a flexible, service oriented, customer driven software frameworkData and knowledge management technologies are of strategic importance for industrial innovation, provided they are integrated in the company p ...
Read Project

 17

 FINISHED 

Landing Gear Noise Attenuation (NOISETTE)

Start date: Jan 1, 2013, End date: Jan 31, 2014,

"Within NOISETTE, Cenaero and VKI combine their respective expertise in computational fluid dynamics and acoustics in order to deliver a tailored solution for the aero-acoustic assessment and design of a low-noise configuration for a regional aircraft nose landing gear. The computational approach relies on performing high quality detached eddy simulations and on using the obtained noise sources fo ...
Read Project

 2

 FINISHED 

Long-Term Advanced Propulsion Concepts and Technologies II (LAPCAT-II)

Start date: Oct 1, 2008, End date: Dec 31, 2013,

"Lacpat II is a logical follow-up of the previous EC-project which has as objective to reduce antipodal flights to less than 2 to 4 hours. Among the several studied vehicles, only two novel aircraft for a Mach 5 and 8 flight are retained in the present proposal. Starting from the available Mach 5 vehicle and its related precooled turboramjet, assumed performance figures of different components ...
Read Project

 16

 FINISHED 
"NEEDS and CONCEPTS: Structural Health Monitoring (SHM) will be very important for Aeronautics. A study from Goodrich stated: "Structural Health Monitoring shows a great potential in terms of cost savings coming from the benefits it would have on inspections which are currently about 25% of the Life Cycle Cost of an airline". Some applications are intended to explore the “out-of-flight domain” con ...
Read Project

 16

 FINISHED 
Main aim of the project is the development of a complete, integrated process chain for the cost effective serial production of various aerospace CFRP stiffener profiles. The production is foreseen in the two steps: Preform manufacturing and infiltration / curing. The project will focus on complex profile geometries with variable cross sections, single or multiple curvature and integrated load int ...
Read Project

 20

 FINISHED 

Engine LUBrication SYStem technologies (ELUBSYS)

Start date: Jun 1, 2009, End date: Nov 30, 2012,

...ity and mass - Develop solutions to improve monitoring of engine oil quality and prevent coking in the lubrication system These goals will be achieved by a European consortium of Industry, Research centres, Academia and SMEs who will develop and validate these new lubrication technologies using modeling approaches and existing state-of-the-art test facilities."
Read Project

 20

 FINISHED 

Future High-Altitude High-Speed Transport 20XX (FAST20XX)

Start date: Dec 1, 2009, End date: Nov 30, 2012,

"The current project aims at the investigation and development of technologies and steps necessary for approaches to conquer the grey zone between aeronautics and space in Europe, and thus to set the foundation of a new paradigm for transportation in the long term. The underlying concepts considered are a) a European space plane based on an airplane launch approach to advance European know how in ...
Read Project

 17

 FINISHED 

valiDation of Radical Engine Architecture systeMs (DREAM)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Read Project

 46

 FINISHED 
"To meet the ACARE 2020 objectives, new green innovative A/C configurations are to be investigated. Following preparation of preliminary layout configuration for each green aircraft, optimization will need to be performed so as to help reaching improvements in the design solution, but also assess key factors and trades and point out innovative design options. In this framework, the conjunction of ...
Read Project

 1