Search for European Projects

22 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"In this project we will develop multiscale modelling technology supported by comprehensive experimental characterization techniques to study the degradation and reliability of next generation Complimentary-Metal-Oxide-Semiconductor (CMOS) devices. Building upon fundamental analysis of the structure and electronic properties of relevant materials and interfaces at the quantum mechanical level, we ...
Read Project

 9

 FINISHED 
Description European Union Research Initiative Aims to Increase 
Electronic Device Efficiency by 10x and Eliminate Power Consumption of Devices in Standby Mode STEEPER addresses the development of Beyond CMOS energy-efficient steep subthreshold slope transistors based on quantum mechanical band-to ...
Read Project

 14

 FINISHED 
"The electrical loads of present automobiles are related to multimedia, heating, ventilation, and air conditioning (HVAC), body electronics (power windows and heated backlight) and lighting (exterior and interior) and their consumption is above 3 kW. A conventional vehicle with internal combustion engine uses part of the mechanical power (about 5 kW) to drive the mentioned on-board equipments thro ...
Read Project

 8

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 
Mobile and embedded devices are rapidly evolving into powerful, ubiquitous personal assistants. As such, they will be involved in security-critical operations like authentication, payment, e-Banking and e-Government applications. Nevertheless, they have to be open platforms on which entertainment applications need to find their place. Being part of the Internet of Things, these platforms become an ...
Read Project

 6

 FINISHED 
Security has always been a stepchild to the developers of embeddedsystems. In the past they were able to rely on physicalprotection. Due to the connectivity and ubiquity of today's embeddedsystems this is no longer possible. The aim of SecFutur is to developand establish a security engineering process for embedded systems. Inorder to achieve this overall goal SecFutur will provide a set ofimplem ...
Read Project

 11

 FINISHED 
The promise of a truly mobile experience is to have the freedom to roam around anywhere and not be bound to a single location. However, the energy required to keep mobile devices connected to the network over extended periods of time quickly dissipates. In fact, the operational time, has been identified as the number one criteria by the majority of the consumers purchasing a mobile device. Moreove ...
Read Project

 11

 FINISHED 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Read Project

 12

 FINISHED 
Electronic devices of the latest generations, being those integrated circuits or discrete components, are often required to operate in harsh environmental conditions, where the temperature may reach over hundred degrees centigrade. Obviously, this has negative impact on several parameters of the electronic devices, ranging from slow-down and transient, recoverable errors to permanent failures and ...
Read Project

 21

 FINISHED 

Nanoscale Silicon-Aware Network-on-Chip Design Platform (NaNoC)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Description The objective of this project is to develop an innovative network-on-chip oriented design platform constituting a toolkit for the construction of NoC-based multi-core systems in nanoscale technologies The NaNoC project aims at developing an innovative design platform for future Network ...
Read Project

 8

 FINISHED 

Spectrum Aggregation and Multi-User MIMO: Real-world Impact (SAMURAI)

Start date: Jan 1, 2010, End date: Oct 31, 2012,

Next generation cellular wireless systems will require data rates which are one order of magnitude higher than the ones provided by current systems.One way to improve the rates is to increase the bandwidth. Unfortunately, spectrum is a fragmented resource and large bands of frequencies are unavailable to one single operator. Therefore, Spectrum Aggregation (SA) represents an opportunity to overcom ...
Read Project

 7

 FINISHED 

Cooperative and Self growing Energy aware Networks (CONSERN)

Start date: Jun 1, 2010, End date: Sep 30, 2012,

CONSERN is introducing a novel paradigm for dedicated, purpose-driven small scale wireless networks characterized by a service-centric evolutionary approach, referred here as an energy-aware self-growing network and system.In the context of CONSERN, the Self-Growing network paradigm considers (i) mechanisms for energy efficient interaction of the wireless network elements and (ii) mechanisms for t ...
Read Project

 10

 FINISHED 
Micro- and nano-electronic components are multi-scale in nature, caused by the huge scale differences of the individual materials and components in these products. Consequently, product behaviour is becoming strongly dependent on material behaviour at the atomic scale. To prevent extensive trial-and-error based testing for new technology developments, new powerful quantitative knowledge-based mode ...
Read Project

 11

 FINISHED 
DOTFIVE is a three-year IP proposal for a very ambitious project focused on advanced RTD activities necessary to move the Silicon/germanium heterojunction bipolar transistor (HBT) into the operating frequency range of 0.5 terahertz (THz) (500 gigahertz GHz) enabling the future development of communication, imaging or radar Integrated Circuits (IC) working at frequencies up to 160 GHz . For a giv ...
Read Project

 20

 FINISHED 

Trusted Embedded Computing (TECOM)

Start date: Jan 1, 2008, End date: Mar 31, 2011,

Trusted Computing (TC) has become meanwhile an established technology for verification and implementation of integrity and security at personal computers. Similar requirements are also needed for embedded computing platforms which have alike trust and security problems due to the increasing complexity and therefore instability of Os and applications as well as connection to the Internet with its s ...
Read Project

 11

 FINISHED 

Home Gigabit Access (Omega)

Start date: Jan 1, 2008, End date: Mar 31, 2011,

Gigabit Home Access Networks are a pivotal technology to be developed if the EU Vision of the Future Internet is to be realised. Consumers will require such HANs to be simple to install, without any new wires, and easy enough to use so that information services running on the HAN will be just another utility, as, for instance, electricity, water and gas are today. The OMEGA HAN is centred round th ...
Read Project

 24

 FINISHED 

Copper Interconnects for Advanced Performance and Reliability (CopPeR)

Start date: Jan 1, 2008, End date: Nov 30, 2010,

The CopPeR project will provide a novel copper deposition process based on the useof non-aqueous solvents to overcome the limitations of currently employedinterconnect formation processes enabling device scaling beyond the 32 nmtechnology node. This non-aqueous process will open novel routes to implementdirect on barrier plating, focussing on tantalum and ruthenium as diffusion barriers.As another ...
Read Project

 8

 FINISHED 

GALS InterfAce for CompleX Digital SYstem Integration (GALAXY)

Start date: Dec 1, 2007, End date: Nov 30, 2010,

This project builds on a technology approach in which the EU currently has world leadership, thanks to previous pan-European funding, and in which the participants are recognised centres of excellence. We propose to provide an integrated GALS (Globally Asynchronous, Locally Synchronous) design flow, together with novel Network-on-Chip capabilities, that will materially aid embedded system design f ...
Read Project

 6

 FINISHED 
A big challenge awaits for technological developments to keep up with the demands in the market due to both the large variety of wireless communication channels as well as the fact that they are essentially all used at the same time by widely varying applications. For planned developments of wireless communication channels in the SHF and EHF bands, IC design automation tools are indispensable. The ...
Read Project

 10

 FINISHED 

Pan-European Reseach Infrastructure for Nano-Structures (PRINS)

Start date: Apr 1, 2008, End date: Mar 31, 2010,

The project focuses on all needed preparatory actions to enable in the following phase the construction of a Research Infrastructure (RI) called Pan-European Research Infrastructure for Nano-Structures (PRINS), with the aim of enabling European innovative research for the ultimate scaling of electronics component and circuits. The platform will be truly interdisciplinary by allowing the convergenc ...
Read Project

 10

 FINISHED 
ICT-eMuCo addresses the platform architecture of future mobile devices. This comprises the relevant controller elements as well as the operating system and application layers. It is expected that the computational performance needed by these devices will grow exponentially due to the growing number of features implemented and the advances in the wireless communication standards. The fast growing n ...
Read Project

 7

 FINISHED 

Generic Embedded System Platform (GENESYS)

Start date: Jan 1, 2008, End date: Jun 30, 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Read Project

 25