Search for European Projects

27 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Computational Methods for Fusion Technology (COMFUS)

Start date: Jan 1, 2011, End date: Dec 31, 2015,

The simulation of multidisciplinary applications use very often a combination of heterogeneous and disjoint numerical techniques that are hard to put together by the user, and whose mathematical foundation is obscure. An example of this situation is the numerical modeling of the physical processes taking place in nuclear fusion reactors. This problem, which can be modeled by a set of partial diffe ...
Read Project

 1

 FINISHED 

Multiscale Modelling of Landslides and Debris Flows (MUMOLADE)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

"Landslides and debris flows are serious geo-hazards common to countries with mountainous terrains. The high speed and the enormity of debris mass make debris flows one of the most dangerous natural hazards. Debris flows are often triggered by landslides partially or completely mobilizing into debris flows. Globally, landslides cause billions of dollars in damage and thousands of deaths and injuri ...
Read Project

 14

 FINISHED 
The objective of this research project is the development and experimental validation of a new generation of mathematical and computational methods allowing the solution of practical fluid-solid structure interaction (FSSI) problems of interest for predictive safety of civil constructions to water-induced hazards. These constructions include: buildings, bridges, harbours, dams, dykes, breakwaters, ...
Read Project

 1

 FINISHED 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Read Project

 72

 FINISHED 

Designing Safer Urban Spaces (DESURBS)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The DESURBS project makes significant and novel advances with the following developments: 1) An urban space security event database that includes incidents or ‘near misses’ that have (or might have) resulted in injury or loss of life, damage to urban spaces, the auxiliary infrastructures supporting those spaces, or the surrounding natural environment 2) An integrated security and resilience (ISR) ...
Read Project

 10

 FINISHED 

Saving Energy in Europe's Public Buildings Using ICT (SMARTSPACES)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

To substantially reduce peak and overall demand for energy and water across EU public buildings, the project will develop a service comprising innovative ICT-based energy decision support, awareness and management service components. Decision support is provided directly to city energy managers and other professionals responsible for building performance, and to building users, both staff and visi ...
Read Project

 24

 FINISHED 

Semantic Tools for Carbon Reduction in Urban Planning (SEMANCO)

Start date: Sep 1, 2011, End date: Nov 30, 2014,

While many cities in Europe and in the world have issued climate change policies and set targets for reduction of CO2 emissions, their implementation in urban planning practice remains a major challenge. Devising effective decision systems which support CO2 emissions reduction demands a systems approach which enables different actors -policy makers, planners, engineers, consultants, and inhabitant ...
Read Project

 9

 FINISHED 
The M-RECT project aims to create multiscale-reinforced semi-crystalline thermoplastics (PEEK and PPS), which will outperform all reinforced polymers in terms of strength, stiffness, creep and mainly damping by upscaling and further developing state of the art production methods, within cost-efficient manufacturing routes. The envisaged multiscale reinforcement will comprise of dispersed straighte ...
Read Project

 23

 FINISHED 
"Reynolds stress is the most important quantity affecting the mean flow as it is responsible for a major part of the momentum transfer in the wall bounded turbulent flow. It has a direct relevance to both skin friction and flow separation. Manipulation of the Reynolds stress can directly lead to changes in the viscous stress at the wall so as to effectively control the flow for effective flow cont ...
Read Project

 19

 FINISHED 

Long-term performance of Engineered Barrier Systems (EBS) (PEBS)

Start date: Mar 1, 2010, End date: Feb 28, 2014,

The main aim of the project PEBS (Long-term Performance of the Engineered Barrier System) is to evaluate the sealing and barrier performance of the EBS with time, through development of a comprehensive approach involving experiments, model development and consideration of the potential impacts on long-term safety functions. The experiments and models cover the full range of conditions from initial ...
Read Project

 18

 FINISHED 
The BECA (Balanced European Conservation Approach – ICT services for resource saving in social housing) project addresses the need to reduce energy consumption in European social housing by a very significant amount to meet overall emission reduction targets. To substantially reduce peak and overall demand for energy and water across EU social housing, BECA will develop a full set of innovative se ...
Read Project

 19

 FINISHED 
"The aim of E-CAero is to harmonize the dissemination between six european associations in the aeronautics/turbomachinery sector. The main objectives are: 1) identifying existing and new areas of interest and clarifying skills, experiences and capabilities of the partners in the relevant technological areas of multi-physics Aeronautics and Aero engines; 2) developing new concepts of collaborative ...
Read Project

 7

 FINISHED 

Fate of Repository Gases (FORGE)

Start date: Feb 1, 2009, End date: Sep 30, 2013,

"The multiple barrier concept is the cornerstone of all proposed schemes for underground disposal of radioactive wastes. The concept invokes a series of barriers, both engineered and natural, between the waste and the surface. Achieving this concept is the primary objective of all disposal programmes, from site appraisal and characterisation to repository design and construction. However, the perf ...
Read Project

 25

 FINISHED 
"Modern aircraft structures have to comply with severe requirements: they have to be light as well as safe. These requirements lead to an increased use of composite materials in the aircraft industry. However, new materials also require new techniques in order to inspect aircraft components during production in a non-destructive way.The primary goal of the DOTNAC project is to develop a safe, con ...
Read Project

 10

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 

VALidation and Improvement of Airframe Noise prediction Tools (VALIANT)

Start date: Sep 1, 2009, End date: May 31, 2013,

"Broadband noise generated by the turbulent flow around the airframe is one of the most important components of aircraft generated acoustic nuisances. Its prediction and subsequent reduction is essential for achieving the ACARE 2020 objectives of noise level reductions. However, the complexity and diversity of broadband turbulent noise sources makes that prediction with present numerical tools ext ...
Read Project

 13

 FINISHED 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Start date: Sep 1, 2009, End date: Feb 28, 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Read Project

 70

 FINISHED 

Saving Energy in Social Housing with ICT (eSESH)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

To substantially reduce peak and overall demand for energy across EU social housing, the project will develop innovative energy awareness and management services EAS and EMS.The objective of the project is to enable sustained reductions in energy consumption across European social housing by providing usable ICT-based energy management and awareness services directly to tenants, by providing effec ...
Read Project

 33

 FINISHED 

GReener Aeronautics International Networking (GRAIN)

Start date: Oct 1, 2010, End date: Dec 31, 2012,

"Aerochina1&2 have been networking projects co-funded by FP7 and AVIC (China) and coordinated by CIMNE. Many of the GRAIN partners have participated in them. These collaborative projects gathered experts on the two Europe (13) and China (17) sides to foster cooperation and debate future trends in the field of integrated multi physics modeling, computer simulations and code validation, experimental ...
Read Project

 18

 FINISHED 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Read Project

 59

 FINISHED 

Neural network computation for fast trajectory prediction (Neural)

Start date: Apr 1, 2011, End date: May 31, 2012,

The Neural project proposes to take advantage of the neural networks capabilities to approximate the aircraft performance models in order to achieve the High Speed Numerical Integrator pursued by the MTM. The Neural development would allow SGO ITD to evaluate the potential benefit of the Neural Network for improving the access to the performance data.The Neural consortium was created to join the a ...
Read Project

 2

 FINISHED 

Continuous Social Learning in Knowledge Networks (MATURE)

Start date: Apr 1, 2008, End date: May 31, 2012,

Description MATURE is investigating knowledge-maturing in organisations. The project is developing individual-level tools for deepening knowledge and organisation-level tools for analysing its effects.The agility of organisations has become the critical success factor for competitiveness and requires that companies and their employees tog ...
Read Project

 12

 FINISHED 
The xDELIA project is designed to investigate a number of contexts where technology enhanced learning is expected to improve the quality of financial decision making. xDelia pursues two major and closely linked objectives. The first is to provide a number of discrete learning interventions, which can be delivered either through a web-based trading platform or in a day-trading facility, to enhanc ...
Read Project

 7

 FINISHED 

Aerodynamic loads estimation at extremes of the flight envelope (ALEF)

Start date: May 1, 2009, End date: Apr 30, 2012,

"ALEF's objective is to enable the European aeronautical industry to create complete aerodynamic models of their aircraft based on numerical simulation approaches within the respective development processes. I.e. ALEF will kick-off a paradigm shift from greater confidence in experimentally measured loads data to greater confidence in computational results. Beyond the scope of ALEF this paradigm sh ...
Read Project

 20

 FINISHED 
MOVE will create knowledge, frameworks and methods for the assessment of vulnerability to natural hazards in Europe. It will use indices and indicators to help improve societal and environmental resilience. Floods, temperature extremes, droughts, landslides, earthquakes, wildfires and storms will be studied. Emphasis will be placed on clear, capable measurement and accounting for uncertainties. MO ...
Read Project

 13

 FINISHED 

EST: The large aperture European Solar Telescope (EST)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

"This is the project definition for the Conceptual Design Study of the large aperture European Solar Telescope (EST). EST is a pan-European project involving 29 partners from 14 different countries. A consortium EAST (European Association for Solar Telescopes) exists with the aim, among others, of undertaking the development of EST, to keep Europe in the frontier of Solar Physics in the world. EST ...
Read Project

 30

 FINISHED 
"The aim of the AEROCHINA2 Coordination Support Action (CSA) is to foster the cooperation between a number of industry, university and research organizations in the aeronautics sector in Europe and China in the field of multi-physics modelling, computer simulation and code validation, experimental testing and design methods for the solution of multi-physics problems of interest to the aeronautic s ...
Read Project

 14