Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
G2P-SOL is a research alliance bringing together the major European and International repositories of germplasm with public and private institutions active in genomics, phenotyping and breeding in the four major Solanaceous crops: potato, tomato, pepper and eggplant. These four crops constitute 66% of the value of European horticultural production, and over 65,000 accessions are available within t ...
Read Project

 20

 FINISHED 
The SeaDataNet pan-European infrastructure has been developed by NODCs and major research institutes from 34 countries. Over 100 marine data centres are connected and provide discovery and access to data resources for all European researchers. Moreover, SeaDataNet is a key infrastructure driving several portals of the European Marine Observation and Data network (EMODnet), initiated by EU DG-MARE ...
Read Project

 57

 FINISHED 
ICARUS proposes a new thermodynamic methodology able to identify the elements and the relative chemical composition allowing a nanocrystalline state to occupy a relative minimum of the Gibbs free energy, which makes the nanostructure reasonably stable against coarsening. This approach will be integrated, in synergy with multiscale and thermodynamic (Nano-Calphad) modeling, in order to implement a ...
Read Project

 11

 FINISHED 
Over recent years, Industrial and Automation Control Systems (IACS) adopted in Critical Infrastructures (CIs) have become more complex due to the increasing number of interconnected devices, and to the large amount of information exchanged among system components. With the emergence of such an “Internet of Things” generation of IACS, the boundaries to be protected have grown well beyond that of th ...
Read Project

 13

 FINISHED 

Organic Rankine Cycle - Prototype Link to Unit Storage (ORC-PLUS)

Start date: May 1, 2015, End date: Apr 30, 2019,

In line with the call H2020- LCE-03-2014, ORC-PLUS focuses on increasing the technological performance of renewable energy systems, reducing costs and improving dispatchability. The aim is to develop an optimized combination of innovative Thermal Energy Storage-TES (specialized for CSP scale 1-5 MWe) and engineering solutions to improve the number of production hours of an existing small CSP plant ...
Read Project

 7

 FINISHED 

Improve Resilience of Industry Sector (LIFE IRIS)

Start date: Sep 15, 2015, End date: Mar 15, 2019,

Background Extreme weather events related to climate change, which directly affect industrial areas, can be extremely damaging for small and medium-sized enterprises (SMEs). In the case of flooding, enterprises face potentially large economic losses (e.g. through stoppages to production and damage to equipment and buildings), while heatwaves increase ener ...
Read Project

 7

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 

solving CHAllenges in Nuclear DAta (CHANDA)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Read Project

 35

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Sensing toxicants in Marine waters makes Sense using biosensors (SMS)

Start date: Dec 1, 2013, End date: Aug 31, 2017,

"SMS will deliver a novel automated networked system that will enable real-time in situ monitoring of marine water chemical and ecological status in coastal areas by the detection of a series of contaminants regulated by the MSFD. SMS will design a multi-modular apparatus that will host in a single unit—the Main Box (MB)—a Sampling Module and an Analysis Module. The former will contain sample coll ...
Read Project

 10

 FINISHED 

Steel Coatings For Reducing Degradation in SOFC (SCORED 2:0)

Start date: Jul 1, 2013, End date: Jun 30, 2017,

The economic viability and market place entry of SOFC power systems is directly dependent on their longevity and production costs. Adequate operational life spans can only be achieved, if the performance degradation of the SOFC stacks and Balance of Plant components over time can be considerably reduced. At the same time, manufacturing costs have to be lowered dramatically for the specifically nec ...
Read Project

 9

 FINISHED 
Construct-PV will develop and demonstrate customizable, efficient, and low cost BIPV for opaque surfaces of buildings. Opaque surfaces are selected because they represent massive wide-area spaces of untapped harvesting potential across Europe. To develop highly efficient systems, most promising PV technologies have been selected, i.e. back contact cells fabricated with MWT technology, extensively ...
Read Project

 12

 FINISHED 

Optimised Microturbine Solar Power system (OMSoP)

Start date: Feb 1, 2013, End date: Jan 31, 2017,

The overall objective of this project is to provide and demonstrate technical solutions for the use of state-of-the-art concentrated solar power system (CSP) coupled to micro-gas turbines (MGT) to produce electricity. The intended system will be modular and capable of producing electricity in the range of 3-10 kW. The aim is to make such a system available to provide energy needs for domestic and ...
Read Project

 10

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 
MAKEOVER project aims at improving the competitiveness of small and medium enterprises in Triveneto macro-region (Veneto, Trentino South Tirol, Friuli Venezia Giulia), in North Eastern Italy, in order to help in achieving the targets fixed by the Europe 2020 strategy for a smart, sustainable and inclusive growth. MAKEOVER project fully addresses the challenges of part 7 – Innovation in small and m ...
Read Project

 10

 FINISHED 

Solar To Hydrogen Hybrid Cycles (SOL2HY2)

Start date: Jun 1, 2013, End date: Nov 30, 2016,

The FCH JU strategy has identified hydrogen production by water decomposition pathways powered by renewables such as solar energy to be a major component for sustainable and carbon-free hydrogen supply. Solar-powered thermo-chemical cycles are capable to directly transfer concentrated sunlight into chemical energy by a series of chemical and electrochemical reactions, and of these cycles, hybrid-s ...
Read Project

 7

 FINISHED 

Next Generation of Heat Pumps working with Natural fluids (NXTHPG)

Start date: Dec 1, 2012, End date: Nov 30, 2016,

The main objective of the project is the development of several reliable, safe, high efficiency and high capacity heat pumps working with the two most promising natural refrigerants: Hydrocarbons andCO2, together with a set of improved components and auxiliary devices adequate for the efficient and safe use of the two refrigerants.The project aims to reach a higher efficiency (10-20% SPF improveme ...
Read Project

 15

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

TAp WAter RAdioactivity Real Time Monitor (TAWARA_RTM)

Start date: Dec 1, 2013, End date: Aug 31, 2016,

The TAWARA_RTM project aims at developing a complete platform to control the quality of the tap water with respect to the radioactivity content. The platform will provide a real time measurement of the activity in the water (measuring the gross alpha and beta activity) to verify whether the distributed water is far from the limits set by the EU legislation (see Directive 98/83/CE of the European C ...
Read Project

 8

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 
The aim of the “School of the Future” project is to design, demonstrate, evaluate and communicate shining examples of how to reach the future high performance building level. School buildings and their primary users pupils - the next generations - are in the focus of the project. Both, the energy and indoor environment performance of 4 demo buildings in 4 European countries and climates will be gr ...
Read Project

 14

 FINISHED 
Today most of HCPV (High Concentration PhotoVoltaic) generators are built with refractive lenses. A few companies have developed efficient solutions and set up manufacturing lines for these kind of products, but there aren’t effective reflective optics HCPV systems in Europe.ECOSOLE regards the realization and demonstration of an innovative HCPV generator made of:• New high efficiency,very high co ...
Read Project

 11

 FINISHED 

PhotoVoltaic European Research Infrastructure (SOPHIA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

The objective of the SOPHIA project is to strenghten and optimise research capabilities, mainly by coordinating efforts on important but precompetitive issues. Large research infrastructures working together will avoid the useless replication of a large number of small efforts. The SOPHIA project aims at pulling together the main European photovoltaic research infrastructures in order to provide t ...
Read Project

 22

 FINISHED 

Thermal-hydraulics of Innovative Nuclear Systems (THINS)

Start date: Feb 1, 2010, End date: Jan 31, 2015,

For the long-term development of nuclear power, innovative nuclear systems such as Gen-IV reactors and transmutation systems need to be developed for meeting future energy challenges. Thermal-hydraulics is recognized as a key scientific subject in the development of innovative reactor systems. This project is devoted to important crosscutting thermal-hydraulic issues encountered in various innovat ...
Read Project

 24

 FINISHED 

Multipurpose Applications by Thermodynamic Solar (MATS)

Start date: Jul 19, 2011, End date: Jan 18, 2015,

The proposed MATS Project aims at promoting the exploitation of concentrated solar energy through small and middle scale facilities, suitable to fulfil local requirements of power and heat, and easily to back-up with the renewable fuels locally already available or that can be expressly produced. The implementation of the project will allow to test the CSP (Concentrating Solar Power) technology in ...
Read Project

 11

 FINISHED 
The protection of the national infrastructures is one of the main issues for national and international security. While FP7 MICIE project has proved that increasing cooperation among infrastructures increases their level of service and predictive capability, it is not enough to effectively counteract threats such as cyber attacks. Such attacks could be performed blocking communication from central ...
Read Project

 14

 FINISHED 

Services provided by Cinema foR ImPlementing new acTion (SCRIpT)

Start date: Jun 1, 2014, End date: Dec 31, 2014,

"The action “Establishing services enhancing the innovation management capacity of SME's in the Enterprise Europe Network" represents an important breakthrough in delivering the EEN services. Until now the EEN consortia partners’ role was mainly catalyzing the SMEs innovation needs with the innovative product, services and processes provided by other companies or research centres, with the aim of ...
Read Project

 11

 FINISHED 
KANT project aims at improving the competitiveness of small and medium enterprises in Triveneto macro-region (Veneto, Trentino South Tirol, Friuli Venezia Giulia), in North Eastern Italy, in order to help in achieving the targets fixed by the Europe 2020 strategy for a smart, sustainable and inclusive growth. KANT project fully addresses the challenges of part 7 – Innovation in small and medium-si ...
Read Project

 4

 FINISHED 
"AFTER project addresses the challenges posed by the need for vulnerability evaluation and contin-gency planning of the energy grids and energy plants considering also the relevant ICT systems used in protection and control.Project emphasis is on cascading events that can cause catastrophic outages of the electric power systems.The main addressed problems are related to high impact wide spread mul ...
Read Project

 14

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 

Valuable EneRgY for a smart School (VERYSchool)

Start date: Dec 1, 2011, End date: Nov 30, 2014,

VERYSchool will develop customised energy savings strategies and ICT solutions for EU schools. It will do this through the integration of Smart Lighting and LED technology, Smart Meters, Building Energy Management Systems, Energy Simulation Software, and Energy Action Management Software. Each of these technologies are brought to the project from consortium partners with companies dedicated specif ...
Read Project

 14

 FINISHED 
This proposal is presented by a consortium of regional research clusters whose core members are already pursuing research and technology development (RTD) in programmes that map on to their local or regional transport policy priorities. Common themes of expertise within the consortium apply to the fields of Traffic, Health and Environment (THE); the objective of the project is to apply this resear ...
Read Project

 13

 FINISHED 
OPTS project aims at developing a new Thermal Energy Storage (TES) system based on single tank configuration using stratifying Molten Salts (MS, Sodium/Potassium Nitrates 60/40 w/w) as heat storage medium at 550°C maximum temperature, integrated with a Steam Generator (SG), to provide efficient, reliable and economic energy storage for the next generation of trough and tower plants.The three-year ...
Read Project

 11

 FINISHED 
Residential buildings represent 60% of the building stock and the area where most of the potential to drastically reduce energy use and CO2 emissions lies. New directives push for deep retrofitting efforts, in order to achieve energy efficiency and RES adoption targets for 2020 and beyond. These require acting both on envelope and on energy use systems, mainly heating and DHW equipment that repres ...
Read Project

 17

 FINISHED 
"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Read Project

 18

 FINISHED 
Background Key environmental regulations concerning Europe’s tanning industry include the EU Integrated Pollution Prevention and Control (IPPC) Directive (96/61/EC), the Water Framework Directive (2000/60/EC) and the REACH Regulation. In order to maintain competitiveness in the global market place, European leather producers must exploit raw materials m ...
Read Project

 4

 FINISHED 

Hybrid Commercial Vehicle (HCV)

Start date: Jan 1, 2010, End date: Jun 30, 2014,

The HCV project aims to develop urban buses and delivery vehicles with advanced second generation of energy efficient hybrid electric powertrains in line with objectives in topic SST 2008.3.1.5. The final result will be the demonstration of a passenger bus and a distribution truck with this advanced technology. In addition early second generation buses and distribution trucks will be demonstrated ...
Read Project

 22