Search for European Projects

33 European Projects Found

Searched on 125080 European Projects

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 
X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Read Project

 22

 FINISHED 

Advanced Travel Companion and Tracking Services (ATTRACkTIVE)

Start date: Sep 1, 2016, End date: Dec 31, 2018,

Mankind’s carbon footprint is the underlying cause of global warming. Reducing it drastically within the next few years is imperative and favouring public transportation will be a deciding factor in this race. New technologies have the potential to enable the creation of better public transportation systems, thus enticing citizens away from using private means.Today’s travellers indeed consider pu ...
Read Project

 7

 FINISHED 
CONNECTA aims at contributing to the S2R’s next generation of TCMS architectures and components with wireless capabilities as well as to the next generation of electronic braking systems. CONNECTA will conduct research into new technological concepts, standard specifications and architectures for train control and monitoring, with specific applications in train-to-ground communications and high sa ...
Read Project

 9

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 
This Project will start the activities of Shift²Rail members related to the cross-cutting activities. The work Areas socio-economic aspects (WA1) and KPI Monitoring (WA2) as defined in the multi-annual action plan will start. The System Plattform Demonstrator Scenarios will be desigend in a first issue. The objectives of this proposal IMPACT-1 are:- Evaluating the effects for mobility, society an ...
Read Project

 7

 FINISHED 

Satellite Technology for Advanced Railway Signalling (STARS)

Start date: Feb 1, 2016, End date: Jan 31, 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Read Project

 18

 FINISHED 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Read Project

 48

 FINISHED 
RHINOS aims at increasing the use of EGNSS to support the safety-critical train localization function for train control in emerging regional and global markets. RHINOS adds value to EGNSS by leveraging the results from prior or existing projects, and develops a Railway High Integrity Navigation Overlay System to be used by the rail community. RHINOS pillar is the GNSS infrastructure realized for t ...
Read Project

 7

 FINISHED 

Next Generation Train Control (NGTC)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Read Project

 21

 FINISHED 

ERTMS on SATELLITE – Enabling Application Validation (ERSAT EAV)

Start date: Feb 1, 2015, End date: Jan 31, 2017,

The main ERSAT EAV objective is to verify the suitability of EGNSS (including EGNOS and Galileo early services) for safety railway application, in particular in regional lines scenario, for which a safe localization of the trains, based on satellite technologies, will be defined and developed, leading the way for the harmonization with the European ERTMS standard, by implementing the solution on ...
Read Project

 14

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Read Project

 20

 FINISHED 
The axle bearing damage process has safety and economic implications on the exploitation of railways systems, as proved by the selection of this topic for inclusion in the present call for research proposals of the FP7 of the EU. Axle bearing damage has been the object of intense attention by railway operators and transportation authorities, leading to a variety of approaches and systems currently ...
Read Project

 18

 FINISHED 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Read Project

 18

 FINISHED 
The nSHIELD project is, at the same time, a complement and an improvement of “pSHIELD”, a pilot project funded in ARTEMIS Call 2009 as the first investigation to build the SHIELD Architectural Framework for SPD. The roadmap proposed in this pilot project aims at addressing Security, Privacy and Dependability (SPD) in the context of Embedded Systems (ESs) as “built in” rather than as “add-on” funct ...
Read Project

 24

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 
"The aim of this project is a step-change in railway capacity by reducing delays and improving traffic fluidity. This will be achieved by a partnership between railway industry experts, system integrators, small dynamic knowledge led companies and academic researchers.There are 4 levels of work:L1: High level principles, definitions and requirements to direct researchL2: Methods and algorithms der ...
Read Project

 19

 FINISHED 

Reduction of Suicides and Trespasses on RAILway property (RESTRAIL)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

The aim of the RESTRAIL project is to reduce the occurrence of suicides and trespasses on railway property and the costly service disruption these events cause, by providing the rail industry with an analysis and identification of cost-effective prevention and mitigation measures.The project starts by identifying the state of the art of best practices and research findings (inside and outside Euro ...
Read Project

 19

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 

EXploiting safety results aCROSS transportation modes (EXCROSS)

Start date: Oct 1, 2011, End date: Apr 30, 2014,

...e four main modes of transportations (road, maritime, railways, aviation) with a solid background and large experience in the participation to research initiatives dealing with safety aspects, namely Ansaldo STS (IT), CERTH (GR), Deep Blue (IT - coordinator), ISDEFE (ES), LOGOS Ingenieur und Planungsgesellschaft (DE), and the University of Strathclyde (UK). The US Federal Aviation Administration ...
Read Project

 7

 FINISHED 
"The ETCETERA project is a contribution to effective and efficient security research planning on a European level. Its aim is three-fold:1. to develop novel methodologies for future strategic research planning,2. to identify risks and potential benefits associated with Critical Dependencies and Emerging Technologies with security implications, and3. to recommend research plans to deal with these r ...
Read Project

 14

 FINISHED 
"The objective of the ALARP project is therefore to study, design and develop an innovative more efficient Automatic Track Warning System (ATWS) to improve the safety of railway trackside workers.ALARP ATWS will able to selectively inform the trackside workers about approaching trains on the track, maintenance events on power lines and/or safety equipment in the concerned tracks that may put at ri ...
Read Project

 8

 FINISHED 

Modular Urban Transport Safety and Security Analysis (MODSafe)

Start date: Sep 1, 2008, End date: Aug 31, 2012,

The European Urban Guided Transport sector (Light rails, Metros, but also Tramways and Regional Commuter trains) is still characterized by a highly diversified landscape of Safety Requirements, Safety Models, Responsibilities, Roles, Safety Approval, Acceptance and Certification Schemes. While a certain convergence in architectures and systems can be observed the safety life cycle still differs f ...
Read Project

 22

 FINISHED 

ERRAC Road Map

Start date: Jun 1, 2009, End date: Jul 31, 2012,

ERRAC- ROADMAP covers research related to all types of freight and passenger rail services as well as their interaction with other modes within the transport system (High Speed and conventional rail over long, medium and short distances, as well as urban rail and co-modal services), the implementation of such research, and to support the various activities of the European Rail Research Advisory Co ...
Read Project

 21

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 

INtegrated European Signalling System (INESS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Read Project

 31

 FINISHED 
-
Read Project

 17

 FINISHED 
"The strategic objective of GREENTRANSPORT-TV is TO CONTRIBUTE TO THE DEVELOPMENT OF PUBLIC AWARENESS ON THE EUROPEAN RESEARCH ON GREENING TRANSPORT IN ALL EUROPEAN COUNTRIES THROUGH THE PROFESSIONAL USE OF TELEVISION MEDIA. This objective will be achieved through the exploitation and the customisation of an acknowledged innovative TV media communication model, already successfully implemented by ...
Read Project

 5

 FINISHED 
"To develop adequate and well accepted security for mass transportation in Europe and the citizens affected by it, is a formidable task. The malicious threats, particularly those posed by terrorists, require a comprehensive approach: if security improvements are patchy, perpetrators are likely to find the loopholes left. With their open access points and interconnections, surface mass transportati ...
Read Project

 13