Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The BIOSKOH project will pave the way for a Second Generation European Circular Bioeconomy by showcasing how a number Innovation Stepping Stones can realise a breakthrough in techno-economic viability of lignocellulosic biorefineries. It will do so through a two stage investment process and development path to realise the largest (110 kton) second generation (2G) biorefinery in Europe. It starts f ...
Read Project

 12

 FINISHED 
Zelcor project aims at demonstrating the feasibility of transforming lignocellulose biorefinery recalcitrant side streams into high added-value biobased products, including fine chemicals. Its concept is to combine chemical and enzymatic catalysis with insects-based biological conversion, within a biorefinery integrated approach. The project is conceived to avoid waste production by recycling wast ...
Read Project

 18

 FINISHED 
Land, food, energy, water and climate are interconnected, comprising a coherent system (the ‘Nexus’), dominated by complexity and feedback. The integrated management of the Nexus is critical to secure the efficient and sustainable use of resources. Barriers to a resource efficient Europe are policy inconsistencies and incoherence, knowledge gaps, especially regarding integration methodologies and ...
Read Project

 28

 FINISHED 
In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Read Project

 13

 FINISHED 

Microorganisms in Warming Arctic Environments (MicroArctic)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

The Arctic plays a key role in the Earth’s climate system and is an area of growing strategic importance for European policy. In this ETN, we will train the next generation of Arctic microbiology and biogeochemistry experts who, through their unique understanding of the Arctic environment and the factors that impact ecosystem and organism response to the warming Arctic, will be able to respond to ...
Read Project

 13

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

The overall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptl ...
Read Project

 12

 FINISHED 
MycoKey aims to generate innovative and integrated solutions that will support stakeholders in effective and sustainable mycotoxin management along food and feed chains. The project will contribute to reduce mycotoxin contamination mainly in Europe and China, where frequent and severe mycotoxin contaminations occur in crops, and where international trade of commodities and contaminated batches are ...
Read Project

 32

 FINISHED 
In the face of the increasing global consumption of fossil resources, photosynthetic organisms offer an attractive alternative that could meet our rising future needs as clean, renewable, sources of energy and for the production of fine chemicals. Key to the efficient exploitation of these organisms is to optimise the conversion of Solar Energy into Biomass (SE2B). The SE2B network deals with this ...
Read Project

 12

 FINISHED 
The COSMHYC project aims at answering the needs identified by the MAWP of the FCH2 JU of increasing the energy efficiency of hydrogen production while reducing operating and capital costs, in order to make hydrogen a competitive fuel for transport applications. COSMHYC will develop and test an innovative compression solution from 1 to 1000 based on a hybrid concept, combining a metal hydride compr ...
Read Project

 5

 FINISHED 
Achieving a sustainable development trajectory in Amazonia is one of the key challenges facing Brazil, and is also an important international concern. ODYSSEA assembles an internationally renowned European and Brazilian multidisciplinary and intersectoral team. We aim to produce fundamental science and tools in order to build an innovative multi-and interdisciplinary observatory to monitor and ass ...
Read Project

 14

 FINISHED 
"Swedish Biofuels AB, as the co-ordinator of a broad ranging international consortium, proposes the construction of a pre-commerical demonstration plant for the production of fully synthetic paraffinic jet fuel from wood and other biomass. The consortium is to design, construct, commission and operate the plant, which will take a variety of raw materials and produce jet fuel that is compatible, wi ...
Read Project

 9

 FINISHED 
CRISS is a user-driven, flexible, scalable and cost-effective cloud-based digital learning ecosystem that allows the guided acquisition, evaluation and certification of digital competences in primary and secondary education, and easily scalable to other educational levels. CRISS proposes an innovative adaptive learning solution supported by the most advanced pedagogical methodologies and technolog ...
Read Project

 14

 FINISHED 

READY

Start date: Dec 1, 2014, End date: Nov 30, 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Read Project

 23

 FINISHED 
SafeClouds is a research project supported by EASA and powered by a full spectrum of aviation stakeholders (Airlines, Airports, ANSPs, Eurocontrol, Research Entities, Safety Agencies) that develops cutting-edge technologies for aviation safety assurance in a cost-effective manner. SafeClouds proposes a data-driven approach to achieve a deeper understanding of the dynamics of the system, where risk ...
Read Project

 15

 FINISHED 
MAESTRO aims to develop and combine with existing Selective Laser Melting (SLM) techniques five innovations that will constitute the basis of a highly competitive manufacturing value chain: (1) a single pre-process software for a numerical chain combining all mandatory steps and configurations of SLM together with its related pre- and post-processes, (2) Hybridization of SLM with MIM, (3) Adaptive ...
Read Project

 10

 FINISHED 

MEthane activation via integrated MEmbrane REactors (MEMERE)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

The key objective of the MEMERE project is the design, scale-up and validation of a novel membrane reactor for the direct conversion of methane into C2H4 with integrated air separation. The focus of the project will be on the air separation through novel MIEC membranes integrated within a reactor operated at high temperature for OCM allowing integration of different process steps in a single multi ...
Read Project

 11

 FINISHED 
The overall aim of the AERO-UA project is to stimulate aviation research collaboration between the EU and Ukraine through strategic and targeted support. AERO-UA is focused solely on Ukraine, because the country has a huge aerospace potential but a low level of aviation research collaboration with the EU. Ukraine’s aerospace sector spans the full spectrum of systems and components development and ...
Read Project

 9

 FINISHED 
The REE4EU project will develop, validate and demonstrate in 2 industrially relevant Pilots an innovative Rare Earth Alloys (REA) production route from Permanent Magnets (PM) and Secondary Batteries (SB) waste. Currently only 1% of RE waste is being recovered as no adequate process is available, so proof-of-concept in REE4EU will open-up a fully new route bringing recovery of 90% of in-process was ...
Read Project

 14

 FINISHED 

WALL Insulation NOvel Nanomaterials Efficient systems (WALL IN ONE)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

WALL IN ONE will develop a consistent package of new advanced sustainable insulation products and systems. The HONEST (High performance Optimized Nanomaterial Energy efficient SysTem) package is a “modular toolbox system” providing a set of complementary solutions that will address most of the complex challenges raised by thermal renovation as well as new construction.The HONEST package includes: ...
Read Project

 13

 FINISHED 

European Materials Modelling Council (EMMC-CSA)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The aim of the EMMC-CSA is to establish current and forward looking complementary activities necessary to bring the field of materials modelling closer to the demands of manufacturers (both small and large enterprises) in Europe. The ultimate goal is that materials modelling and simulation will become an integral part of product life cycle management in European industry, thereby making a strong c ...
Read Project

 15

 FINISHED 
EULAC Focus addresses the whole set of topics included in the Call. It delivers a significant contribution to the improvement of EU–CELAC relations through a better understanding of the three dimensions selected by the call: cultural, scientific and social. The main objective is that of “giving focus” to these three dimensions of EU–CELAC relations, with a view to determining synergies and cross- ...
Read Project

 19

 FINISHED 
An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define me ...
Read Project

 14

 FINISHED 
Background The extreme toxicity of certain pesticides causes risk to human and animal health through direct exposure (e.g. industrial workers producing pesticides and operators using them) or indirect exposure (e.g. food consumers). Chronic exposure leads to effects such as carcinogenicity, mutagenicity and genotoxicity, or adverse effects on the immune o ...
Read Project

 2

 FINISHED 

Rf Engineered substrates to FostER fEm performaNCE (REFERENCE)

Start date: Dec 1, 2015, End date: May 31, 2019,

The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The project targets to develop over the next 3 years, innovative solutions from material, engineered substrates, process, design ...
Read Project

 18

 FINISHED 
AEROARMS proposes the development of the first aerial robotic system with multiple arms and advanced manipulation capabilities to be applied in industrial inspection and maintenance (I&M). The objectives are:1. R&D on aerial manipulation to perform I&M. This includes: 1.1 Based on previous partner results, developing systems which are able to grab and dock with one or more arms and perform dext ...
Read Project

 10

 FINISHED 
Since the publication of the first list of Critical Raw Materials (CRM) in 2010 by the Ad-hoc Working Group on CRM, numerous European projects have addressed (part of) the CRMs value and several initiatives have contributed to gather (part of) the related community into clusters and associations. This led to the production of important knowledge, unfortunately disseminated. Numerous databases have ...
Read Project

 30

 FINISHED 
The key objective of the HyGrid project is the design, scale-up and demonstration at industrially relevant conditions a novel membrane based hybrid technology for the direct separation of hydrogen from natural gas grids. The focus of the project will be on the hydrogen separation through a combination of membranes, electrochemical separation and temperature swing adsorption to be able to decrease ...
Read Project

 7

 FINISHED 
Over recent years, Industrial and Automation Control Systems (IACS) adopted in Critical Infrastructures (CIs) have become more complex due to the increasing number of interconnected devices, and to the large amount of information exchanged among system components. With the emergence of such an “Internet of Things” generation of IACS, the boundaries to be protected have grown well beyond that of th ...
Read Project

 13

 FINISHED 
The project will develop well-targeted and sound communication material that raises awareness on our (individual and collective) responsibility and interest in ensuring the sustainability of the ocean and of its ecosystems. The project builds on critical assessments of: (1) existing communication strategies, material and governance that focuses on the ocean; (2) the values, perceptions and underst ...
Read Project

 15

 FINISHED 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Read Project

 24

 FINISHED 
Nowadays, cybercrime is one of the most relevant and critical threats to both the economy and society in Europe. Establishing efficient and effective ways to protect services and infrastructures from ever-evolving cyber threats is crucial for sustaining business integrity and reputation as well as protecting personal and sensitive data.To that end, the SHIELD project proposes a universal solution ...
Read Project

 12

 FINISHED 

Advanced Travel Companion and Tracking Services (ATTRACkTIVE)

Start date: Sep 1, 2016, End date: Dec 31, 2018,

Mankind’s carbon footprint is the underlying cause of global warming. Reducing it drastically within the next few years is imperative and favouring public transportation will be a deciding factor in this race. New technologies have the potential to enable the creation of better public transportation systems, thus enticing citizens away from using private means.Today’s travellers indeed consider pu ...
Read Project

 7

 FINISHED 

Interoperability of Heterogeneous IoT Platforms (INTER-IoT)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

INTER-IoT project is aiming at the design, implementation and experimentation of an open cross-layer framework and associated methodology to provide voluntary interoperability among heterogeneous Internet of Things (IoT) platforms. The proposal will allow developing effectively and efficiently smart IoT applications, atop different heterogeneous IoT platforms, spanning single and/or multiple appli ...
Read Project

 14

 FINISHED 
Crisis incidents result in difficult working conditions for Urban Search-and-Rescue (USaR) crews. INACHUS aims to achieve a significant time reduction and increase efficiency in USaR operations by providing:1.Simulation tools for estimating the locations of survival spaces (after a structural collapse) and identify the location of survivors for different construction types and building materials2. ...
Read Project

 21

 FINISHED 

Towards a EU framework for the security of Widezones (ZONESEC)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Read Project

 19

 FINISHED 
The project WELLNESS#KEPASS, is in continuity with the project IPA Adriatic "KEPASS", promoted by Marche Region in 2013 and recently concluded. KEPASS had as an objective the integration of the Adriatic school systems in order to make the secondary education more competitive and create opportunities for student in terms of mobility and the mutual recognition of programs of secondary school, qualif ...
Read Project

 34

 FINISHED 

European Exascale Processor Memory Node Design (ExaNoDe)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

ExaNoDe will investigate, develop and pilot (technology readiness level 7) a highly efficient, highly integrated, multi-way, high-performance, heterogeneous compute element aimed towards exascale computing and demonstrated using hardware-emulated interconnect. It will build on multiple European initiatives for scalable computing, utilizing low-power processors and advanced nanotechnologies. ExaNoD ...
Read Project

 13

 FINISHED 
Background The building sector (considering the whole life cycle) is responsible for 40% of total European Union energy consumption and is the main contributor to greenhouse gas (GHG) emissions. European legislation is focusing on existing building stock – most of which has poor insulation performance (with a total thermal resistance R ...
Read Project

 3

 FINISHED 

Petroc Go II

Start date: Sep 1, 2016, End date: Aug 31, 2018,

Petroc Go II is a Key Action 1 Project which builds upon the successes of the current Petroc Go project , expanding it to include additional vocational groups and partner organizations allowing 420 students and 82 staff from the college to be involved in a series of 2 week placements throughout Europe in 2017 and 2018.The project targets participants in an isolated rural area, who face barriers to ...
Read Project

 10

 FINISHED 

Uczymy się hotelarstwa u najlepszych pracodawców

Start date: Sep 1, 2016, End date: Aug 31, 2018,

58 students from the hospitality courses in Technikum Ekonomiczne w ZSE im. A. i J. Vetterów in Lublin will take part in the project. The participants will undergo a four-week-long internship in hotels located in France, Germany and Spain. The hotels in which the internship will be held are characterised by a high level of professionalism, good preparation for the patronage over trainees, as they ...
Read Project

 11